Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the internal market for electricity (recast)

1.

Kerngegevens

Document­datum 05-11-2018
Publicatie­datum 06-11-2018
Kenmerk 5834/5/18 REV 5
Van General Secretariat of the Council
Externe link origineel bericht
Originele document in PDF

2.

Tekst

Council of the European Union

Brussels, 5 November 2018 (OR. en)

5834/5/18

Interinstitutional File: REV 5

2016/0379(COD) i

ENER 37 ENV 57 CLIMA 19 COMPET 58 CONSOM 22 FISC 47 CODEC 128

NOTE

From: General Secretariat of the Council

To: Permanent Representatives Committee

No. Cion doc.: 15135/1/16 ENER 418 ENV 758 CLIMA 169 COMPET 637 CONSOM 301 FISC 221 IA 131 CODEC 1809 REV 1

  • ADD 1 REV 1 + ADD 2 REV 1

Subject: Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the internal market for electricity (recast)

  • I. 
    INTRODUCTION
  • 1. 
    On 30 November 2016, the Commission submitted a set of proposals as “Clean Energy for

    All Europeans” package, in order to provide a stable legislative framework, necessary for

    the energy transition. Two legislative files, based on article 194(2) of the Treaty, discuss the

    common rules for the internal market in electricity.

  • 2. 
    In the European Parliament, these proposals were referred to the Industry, Research and

    Energy Committee (ITRE) which appointed on 25 January 2017 Mr. Krišjānis Kariņš as

    rapporteur. The ITRE Committee voted on its report on 21 February 2018.

II. STATE OF PLAY

  • 3. 
    The TTE (Energy) Council adopted, on 18 December 2017, a general approach on the abovementioned

    proposal. The first informal trilogue, based on the Council general approach, took

    place on 27 June 2018, the second and third based on revised mandates was held on 11

    September 2018 and 18 October. The trilogues and technical meetings in between allowed

    the co-legislators to advance significantly and propose compromise suggestions. Moreover, a

    broad mandate was also given to the technical meetings to make progress on the entire

    Regulation.

  • 4. 
    Till present, the main areas of discussions were articles regarding the subject-matter and the

    scope (article 1); principles regarding the operation of electricity markets (article 3); dayahead

    and intraday markets, trade on day-ahead and intraday markets, forward markets,

    technical bidding limits and value of lost load (articles 6-10); measures to address congestion

    and congestion management, definition of the bidding zones, capacity allocation (articles 13-

    14); resource adequacy, reliability, capacity mechanisms (articles 18-24) and the Regional

    Security Coordinators (articles 32-44).

  • 5. 
    During September and October the Energy Working Party has pursued its examination of the

    Presidency's compromise proposals. Furthermore, in order to prepare the fourth informal

    trilogue, several technical meetings with the EP have taken place.

III. REVISED MANDATE

  • 6. 
    In view of the fourth informal trilogue scheduled for 13 November 2018, the basis for the

    discussion will be the fourth-column table contained in Annex I to this note that sets out in the

    4th column textual proposals 'provisionally agreed' in second trilogue or 'provisionally agreed

    in TM' (technical meetings) which await to be provisionally confirmed at the fourth trilogue.

    The Presidency also indicates additional compromise proposals.

    In Annex II, consolidated version of Article 13 was included to facilitate the reading of the

    compromise on this article.

  • 7. 
    Paragraphs 'provisionally agreed' in trilogues or technical meetings (in TM) till now are:

    Recitals in lines: 46-51Article 1 - (all)Article 2 - (line 109)Article 3 - (lines: 112-123, 126-129)Article 6 - (all)Article 8 - (line 184)Article 9 - (lines 189-190)Article 10 - (line 192-193)Article 25 - (line 470)Article 27 - (line 485-486, 496-498)Article 28 - (line 505)Articles 32 to 33 (all)Article 34 - (lines 549-550, 555-575Article 35 to 44 (all)Annex - (all without lines 948-951)

  • 8. 
    Additional compromise proposals not yet seen by Coreper are the following:

    Recital 44 (line 58)Article 2 (line 76, 98 )Article 13 (all) (consolidated version of the compromise is found in Annex II)Article 14 (all)Article 18 (lines 338-344, 346-349)Article 18a (lines 353-354)Article 20 (line 395)Article 21 (line 406)Article 23 (lines 433-443, 449-458)

  • 9. 
    Compromise proposals indicated in the 4th column of articles: 5 (all), 7 (lines: 177-180), 9

    (lines: 186,187), 27 (lines: 481, 493), were already seen by Coreper. However, the discussion

    with the European Parliament is not yet finalised.

  • 10. 
    Regarding other European Parliament's amendments, the Presidency proposes to maintain the

    Council's general approach at this stage of negotiations.

  • 11. 
    In the fourth column, bold italics indicates text proposed by the EP; bold indicates texts of the

    Council general approach added to the Commission proposal and compromise texts proposed

    by the Presidency in response to the EP amendments; bold and underlined (or bold italics

    and underlined) indicates new text elements, diverging from the previous document (5834/18

    REV 4) and strikethrough indicates deletions.

IV. CONCLUSION

  The Permanent Representatives Committee is invited to agree on a revised mandate for the

fourth informal trilogue on 13 November 2018, on the basis of the text included in Annex I

and Annex II.

___________________ ANNEX I

Proposal for a

REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the internal market for electricity

(recast)

  • 1. 
    COMISSION PROPOSAL EP PLENARY TEXT COUNCIL GENERAL Compromise proposals

    APPROACH (doc. ) (COD 2016/0379 - doc.

    15135/1/16 REV 1 + ADD 1 REV 1)

  • 2. 
    THE EUROPEAN THE EUROPEAN N.B. any compromise proposals for the

    PARLIAMENT AND THE PARLIAMENT AND THE recitals are provisional, and without COUNCIL OF THE COUNCIL OF THE prejudice to any alignment with the content EUROPEAN UNION, EUROPEAN UNION, of the Articles that may prove necessary. Having regard to the Treaty on Having regard to the Treaty on the Functioning of the the Functioning of the European European Union, and in Union, and in particular Article particular Article 194 (2) 194 (2) thereof, thereof, Having regard to the proposal Having regard to the proposal from the European Commission, from After transmission of the draft the European Commission, legislative act to the national After transmission of the draft parliaments, legislative act to the national Having regard to the opinion of parliaments, the European Economic and Having regard to the opinion of Social Committee, the European Economic and Having regard to the opinion of Social Committee, the Committee of the Regions, Having regard to the opinion of Acting in accordance with the the Committee of the Regions, ordinary legislative procedure, Acting in accordance with the Whereas: ordinary legislative procedure, Whereas:

ANNEX I TREE.2.B EN

  • 3. 
    (1) Regulation (EC) No (1) Regulation (EC) No

    714/2009 of the European 714/2009 of the European Parliament and of the Council Parliament and of the Council 1 has been substantially amended has been substantially amended several times. Since further several times. Since further amendments are to be made, amendments are to be made, that that Regulation should be recast Regulation should be recast in in the interests of clarity. the interests of clarity.

  • 4. 
    (2) The Energy Union aims (2) The Energy Union aims at at providing consumers – providing consumers –

    household and business – household and business – with secure, sustainable, safe, secure, sustainable, competitive and affordable competitive and affordable energy. Historically, the energy. Historically, the electricity system was electricity system was dominated by vertically dominated by vertically integrated, often publicly integrated, often publicly owned, owned, monopolies with large monopolies with large centralised nuclear or fossil fuel centralised nuclear or fossil fuel power plants. The internal power plants. The internal market in electricity, which has market in electricity, which has been progressively been progressively implemented implemented since 1999, aims since 1999, aims to deliver a real to deliver a real choice for all choice for all consumers in the consumers in the Union , both Union , both citizens and citizens and businesses, new businesses, new business business opportunities and more opportunities and more crosscross-border trade, so as to border trade, so as to achieve achieve efficiency gains, efficiency gains, competitive competitive prices and higher prices and higher standards of standards of service, and to service, and to contribute to contribute to security of supply security of supply and and sustainability. The internal sustainability. The internal

1 Regulation (EC) No 714/2009 i of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003 i (OJ L 211, 14.8.2009, p. 15).

ANNEX I TREE.2.B EN

market in electricity has market in electricity has increased competition, in increased competition, in particular at the wholesale particular at the wholesale level, level, and cross-border trade. It and cross-border trade. It remains the foundation of an remains the foundation of an efficient energy market. efficient energy market.

  • 5. 
    (3) Europe's energy system (3) Europe's energy system is is in the middle of its most in the middle of its most

    profound change in decades and profound change in decades and the electricity market is at the the electricity market is at the heart of that change. The heart of that change. [ ] This common goal to decarbonise change creates and facilitates the energy system creates new new opportunities and opportunities and challenges for challenges for market market participants. At the participants. At the same time, same time, technological technological developments developments allow for new allow for new forms of forms of consumer participation consumer participation and and cross-border cooperation. cross-border cooperation.

ANNEX I TREE.2.B EN

  • 6. 
    (3a) This Regulation is establishing rules to ensure the functioning of the internal energy market while

    integrating a limited number of requirements related to the development of renewable forms of energy and environmental policy, in particular specific rules for certain renewable power generating facilities, concerning balancing responsibility, dispatch and redispatch as well as a threshold for CO2 emissions of new generation capacity where it is subject to a capacity mechanism.

  • 7. 
    (4) State interventions, often

    designed in an uncoordinated (4) State interventions, often manner, have led to increasing designed in an uncoordinated distortions of the wholesale manner, have led to increasing electricity market, with distortions of the wholesale negative consequences for electricity market, with negative investments and cross-border consequences for investments trade. and cross-border trade.

ANNEX I TREE.2.B EN

  • 8. 
    (5) In the past, electricity AM 1

    customers were purely passive, (5) In the past, electricity (5) In the past, electricity often buying electricity at customers were purely passive, customers were purely passive, regulated prices which had no often buying electricity at regulated often buying electricity at direct relation to the market. In prices which had no direct relation regulated prices which had no the future, customers need to be to the market. In the future, direct relation to the market. In enabled to fully participate in customers need to be enabled to the future, customers need to be the market on equal footing fully participate in the market on enabled to fully participate in the with other market participants. equal footing with other market market on equal footing with To integrate growing shares of participants and be empowered to other market participants. To renewable energy, the future manage their energy consumption. integrate growing shares of electricity system should make To integrate growing shares of renewable energy, the future use of all available sources of renewable energy, the future electricity system should make flexibility, particularly demand electricity system should make use use of all available sources of response and storage. To of all available sources of flexibility, particularly demand achieve effective flexibility, particularly demand side response and storage. [ ] It also decarbonisation at lowest cost, solutions and storage, and of needs to encourage energy it also needs to encourage digitalisation through the efficiency.

    energy efficiency. integration of innovative technologies with the electricity system. To achieve effective decarbonisation at lowest cost, it also needs to encourage energy efficiency. The achievement of the internal energy market through the effective integration of renewable energy can drive investments in the long term and can contribute to delivering the objectives of the Energy Union and the 2030 climate and energy framework.

ANNEX I TREE.2.B EN

  • 9. 
    (6) More market integration (6) More market integration and the change towards a more and the change towards a more volatile electricity production volatile electricity production requires increased efforts to requires increased efforts to

    coordinate national energy coordinate national energy policies with neighbours and to policies with neighbours and to use the opportunities of crossuse the opportunities of crossborder electricity trade. border electricity trade.

  • 10. 
    (7) Regulatory frameworks (7) Regulatory frameworks have developed, allowing have developed, allowing

    electricity to be traded across electricity to be traded across the the Union. That development Union. That development has has been supported by the been supported by the adoption adoption of several network of several network codes and codes and guidelines for the guidelines for the integration of integration of the electricity the electricity markets. Those markets. Those network codes network codes and guidelines and guidelines contain contain provisions on market provisions on market rules, rules, system operation and system operation and network network connection. To ensure connection. To ensure full full transparency and increase transparency and increase legal legal certainty, the main certainty, the main principles of principles of market functioning market functioning and capacity and capacity allocation in the allocation in the balancing, balancing, intraday, day ahead intraday, day ahead and forward and forward market timeframes market timeframes should also should also be adopted pursuant be adopted pursuant to the to the ordinary legislative ordinary legislative procedure procedure and incorporated in a and incorporated in a single act. single act.

ANNEX I TREE.2.B EN

  • 11. 
    (7a) The Balancing Guideline establishes in its Article 13 a

    process where transmission system operators are able to delegate all or part of their tasks to a third party. The delegating transmission system operators should remain responsible for ensuring compliance with the obligations in this Regulation. Likewise, Member States should be able to assign tasks and obligations to a third party. Such assignment should be limited to tasks and obligations executed at national level (such as imbalance settlement). The limitations to the assignment should not lead to unnecessary changes to the existing national arrangements. However, transmission system operators should remain responsible for the tasks entrusted to them pursuant to Article 40 of the [recast Electricity Directive].

ANNEX I TREE.2.B EN

  • 12. 
    (7b) The Balancing Guideline established in its Articles 18,

    30 and 32 that the pricing method for standard and specific products for balancing energy should create positive incentives for market participants in keeping and/or helping to restore the system balance of their imbalance price area, reduce system imbalances and costs for society. Such pricing approach should strive for an economically efficient use of demand response and other balancing resources subject to operational security limits. The pricing method used in the procurement of balancing capacity should strive for an economically efficient use of demand response and other balancing resources subject to operational security limits.

ANNEX I TREE.2.B EN

  • 13. 
    (7c) The integration of balancing energy markets should facilitate the efficient functioning of the intraday market in order to provide the possibility for market

    participants to balance themselves as close as possible to real time as set with the balancing energy gate closure times defined in Article 24 of the Balancing Guideline. Only the imbalances remaining after the end of the intraday market should be balanced by transmission system operators with the balancing market. The Balancing Guideline foresees in its Article 53 the harmonisation of the imbalance settlement period to 15 minutes in Europe. Such harmonisation should support intraday trading and foster the development of a number of trading products with same delivery windows.

ANNEX I TREE.2.B EN

  • 14. 
    (7d) In order to enable transmission system operators to procure and use balancing capacity in an efficient, economic and market-based manner, there is a need to foster market integration. In this regard, the Balancing Guidelines established in its Title IV three methodologies through which transmission system operators may allocate cross-zonal capacity for the exchange of balancing capacity and sharing of reserves, when supported on the basis of a cost-benefit analysis: the cooptimisation process, the market-based allocation process and the allocation based on an economic

    efficiency analysis. The cooptimisation allocation process should be performed on a dayahead basis whereas the market-based allocation process could be performed where the contracting is done not more than one week in advance of the provision of the balancing capacity and the allocation based on an economic efficiency analysis where the contracting is done more than one week in

ANNEX I TREE.2.B EN

advance of the provision of the balancing capacity on the conditions that the volumes allocated are limited and that an assessment is done every year. Once a methodology for the allocation process of crosszonal capacity is approved by the relevant regulatory authorities, early application of the methodology by two or more transmission system operators could take place to gain experience and allow for a smooth application by more transmission system operators in the future. The application of such a methodology, where existing, should nevertheless be harmonised by all transmission system operators in order to foster market integration.

ANNEX I TREE.2.B EN

  • 15. 
    (7e) The Balancing Guideline establishes in its Title V that

    the general objective of imbalance settlement is to ensure that balance responsible parties support the system's balance in an efficient way and to incentivise market participants in keeping and/or helping to restore the system balance. To make balancing markets and the overall energy system fit for the integration of increasing shares of variable renewables, imbalance prices should reflect the real-time value of energy.

ANNEX I TREE.2.B EN

  • 16. 
    (7f) The guideline on capacity allocation and congestion management sets out detailed guidelines on cross-zonal capacity allocation and congestion management in the day-ahead and intraday markets, including the requirements for the

    establishment of common methodologies for determining the volumes of capacity simultaneously available between bidding zones, criteria to assess efficiency and a review process for defining bidding zones. Articles 32 and 34 set out rules on review of bidding zone configuration, Articles 41 and 54 set out harmonised limits on maximum and minimum clearing prices for day-ahead and intraday timeframes, Article 59 sets out rules on intraday cross-zonal gate closure times, whereas Article 74 of the guideline sets out rules on redispatching and countertrading cost sharing methodologies.

ANNEX I TREE.2.B EN

  • 17. 
    (7g) The guideline on forward capacity allocation sets out detailed rules on crosszonal capacity allocation in the forward markets, on the establishment of a common methodology to determine long-term cross-zonal capacity, on the establishment of a single allocation platform at European level offering long-term transmission rights, and on the possibility to return long-term transmission rights for subsequent forward capacity allocation or transfer long-term transmission rights between market participants. Article 30 of the guideline sets out rules on forward hedging products.

ANNEX I TREE.2.B EN

  • 18. 
    (7h) The network code on requirements for generators 2 sets out the requirements for grid connection of powergenerating

    facilities, namely synchronous power-generating modules, power park modules and offshore power park modules, to the interconnected system. It, therefore, helps to ensure fair conditions of competition in the internal electricity market, to ensure system security and the integration of renewable electricity sources, and to facilitate Union-wide trade in electricity. Articles 66 and 67 of the network code set out rules for emerging technologies in electricity generation.

  • 19. 
    (8) Core market principles (8) Core market principles should set out that electricity should set out that electricity prices are to be determined prices are to be determined

    through demand and supply. through demand and supply. Those prices should signal Those prices should signal when when electricity is needed, electricity is needed, providing providing market-based market-based incentives for incentives for investments into investments into flexibility flexibility sources such as sources such as flexible flexible generation, generation, interconnection, interconnection, demand demand response or storage. response or storage.

2 Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators.

ANNEX I TREE.2.B EN

  • 20. 
    (9) The decarbonisation of (9) While decarbonisation of the electricity sector, with the electricity sector, with

    renewable energy becoming a renewable energy becoming a major part of the market, is a major part of the market, is one core objective of the Energy of the goals of the Energy Union. As the Union moves Union [ ] it is crucial that the towards the decarbonisation of market removes existing barriers the electricity sector and to cross-border trade and increasing penetration of encourages investments into renewable energy sources, it is supporting infrastructure, for crucial that the market removes example, more flexible existing barriers to cross-border generation, interconnection, trade and encourages demand response and storage. investments into supporting To support this shift to variable infrastructure, for example, and distributed generation, and more flexible generation, to ensure that energy market interconnection, demand principles are the basis for the response and storage. To Union's electricity markets of support this shift to variable and the future, a renewed focus on distributed generation, and to short-term markets and scarcity ensure that energy market pricing is essential. principles are the basis for the Union's electricity markets of the future, a renewed focus on short-term markets and scarcity pricing is essential.

ANNEX I TREE.2.B EN

  • 21. 
    (10) Short-term markets will AM 2

    improve liquidity and (10) Short-term markets will (10) Short-term markets will competition by enabling more improve liquidity and competition improve liquidity and resources to participate fully in by enabling more resources to competition by enabling more the market, especially those that participate fully in the market, resources to participate fully in are more flexible. Effective especially those that are more the market, especially those that scarcity pricing will encourage flexible. Effective scarcity pricing are more flexible. Effective market participants to be will encourage market participants scarcity pricing will encourage available when the market most to react to market signals and to market participants to be needs it and ensures that they be available when the market most available when the market most can recover their costs in the needs it and ensures that they can needs it and ensures that they wholesale market. It is therefore recover their costs in the wholesale can recover their costs in the critical to ensure that, as far as market. It is therefore critical to wholesale market. It is therefore possible, administrative and ensure that administrative and critical to ensure that, as far as implicit price caps are removed implicit price caps are removed to possible, administrative and to allow scarcity prices to allow scarcity pricing. When fully implicit price caps are removed increase up to the value of lost embedded in the market structure, to allow scarcity prices to load. When fully embedded in short-term markets and scarcity increase up to the value of lost the market structure, short-term pricing will contribute to the load. When fully embedded in markets and scarcity pricing removal of other market distortive the market structure, short-term will contribute to the removal measures, such as capacity markets and scarcity pricing will of other measures, such as mechanisms, to ensure security of contribute to the removal of capacity mechanisms, to ensure supply. At the same time, scarcity other measures, such as capacity security of supply. At the same pricing without price caps on the mechanisms, to ensure security time, scarcity pricing without wholesale market should not of supply. At the same time, price caps on the wholesale jeopardize the possibility for scarcity pricing without price market should not jeopardize reliable and stable prices for final caps on the wholesale market the possibility for reliable and customers, in particular should not jeopardize the stable prices for final households, SMEs and industrial possibility for reliable and stable customers, in particular consumers. prices for final customers, in households and SMEs. particular households and SMEs.

ANNEX I TREE.2.B EN

  • 22. 
    (11) Derogations to (11) Subject to Union State fundamental market principles aid rules pursuant to Articles such as balancing 107, 108 and 109 derogations to responsibility, market-based fundamental market principles dispatch, or curtailment and such as balancing responsibility, redispatch reduce flexibility market-based dispatch, or [ ] signals and act as barriers to the redispatch reduce flexibility

    development of solutions such signals and act as barriers to the as storage, demand response or development of solutions such aggregation. While derogations as storage, demand response or are still necessary to avoid aggregation. While derogations unnecessary administrative are still necessary to avoid burden for certain actors, in unnecessary administrative particular households and burden for certain actors, in SMEs, broad derogations particular households and SMEs, covering entire technologies are broad derogations covering not consistent with the entire technologies are not objective of achieving marketconsistent with the [ ] aim of based and efficient achieving market-based and decarbonisation and should thus efficient decarbonisation be replaced by more targeted process and should thus be measures. replaced by more targeted measures.

  • 23. 
    (12) The precondition for AM 3 (12) The precondition for effective competition in the (12) The precondition for effective competition in the internal market in electricity is effective competition in the internal internal market in electricity is non-discriminatory and market in electricity is nonnon-discriminatory and

    transparent charges for network discriminatory, transparent and transparent charges for network use including interconnecting adequate charges for network use use including interconnecting lines in the transmission including interconnecting lines in lines in the transmission system. system. The available capacity the transmission system. The Uncoordinated curtailments of of those lines should be set at available capacity of those lines interconnector capacities the maximum levels consistent should be set at the maximum increasingly limit the exchange with the safety standards of levels consistent with the safety of electricity between Member secure network operation. standards of secure network States and have become a

    operation.

ANNEX I TREE.2.B EN

serious obstacle to the development of a functioning internal market in electricity. The available capacity of [ ] interconnectors should therefore be set at the maximum level consistent with the safety standards of secure network operation including respecting (n-1) security. However, there are some limitations to setting the capacity level in a meshed grid. The level of unscheduled flows should not go beyond what could be expected in a bidding zone without structural congestions. Further, foreseeable problems for ensuring grid security might occur, for example in case of grid maintenance. Also case-by-case grid security issues might occur. Limitations beyond that level can only be accepted for a limited transitional phase which is necessary to adapt the current physical situation in the grids to use the maximum capacity of the interconnectors. The new target benchmark, and if applicable, the linear trajectory towards this level, should ensure that a minimum

ANNEX I TREE.2.B EN

share of the interconnector capacity is being available for trade or used in the capacity calculation respectively. Loop flows should only be taken into account for calculating capacity to the extent that they would exist without internal congestion. Whereas certain clearly circumscribed limitations in cross-zonal capacity may be justifiable, a clear minimum threshold needs to be put in place, preventing excessive use of derogation possibilities and giving a predictable capacity value for market participants. Where a flow-based approach is used, this threshold should determine the minimum share of the thermal capacity of an interconnector to be used as an input for coordinated capacity allocation under the capacity calculation and congestion management guideline.

  • 24. 
    (13) It is important to avoid (13) It is important to avoid distortion of competition distortion of competition

    resulting from the differing resulting from the differing safety, operational and planning safety, operational and planning standards used by transmission standards used by transmission system operators in Member system operators in Member States. Moreover, there should States. Moreover, there should be transparency for market be transparency for market

ANNEX I TREE.2.B EN

participants concerning participants concerning available available transfer capacities and transfer capacities and the the security, planning and security, planning and operational standards that affect operational standards that affect the available transfer capacities. the available transfer capacities.

  • 25. 
    (14) To efficiently steer (14) To efficiently steer necessary investments, prices necessary investments, prices also need to provide signals also need to provide signals where electricity is most where electricity is most needed. needed. In a zonal electricity In a zonal electricity system, system, correct locational correct locational signals require signals require a coherent, a coherent, objective and reliable objective and reliable determination of bidding zones determination of bidding zones via a transparent process. In via a transparent process. In order to ensure efficient order to ensure efficient operation and planning of the operation and planning of the Union electricity network and to Union electricity network and provide effective price signals to provide effective price for new generation capacity, signals for new generation demand response or

    capacity, demand response or transmission infrastructure, transmission infrastructure, bidding zones should reflect bidding zones should reflect structural congestion. In structural congestion. In particular, cross-zonal capacity particular, cross-zonal capacity should not be reduced in order to should not be reduced in order resolve internal congestion. to resolve internal congestion.

  • 26. 
    (14a) To reflect the divergent principles of optimising

    bidding zones without jeopardizing liquid markets and grid investments two options should be foreseen to overcome congestions. Member States can choose

ANNEX I TREE.2.B EN

between a bidding zone split or measures such as grid reinforcement and grid optimisation. The starting point for such a decision should be the identification of long term structural congestions either by the transmission system operator of a Member State or by the bidding zone review. Member States should try to find a common solution first on how to best address congestions. In that course the Member States might adopt multinational or national action plans to overcome congestions. At the end of the implementation of this action plan, Member States should have a possibility to choose whether to opt for a split or whether to opt for covering remaining congestions with remedial actions for which they bear the costs. In the latter case they shall not be split against their will, as long as the level of minimum capacity benchmark is reached. The minimum level of capacity that should be used in capacity calculation should be a percentage of the capacity of a critical network element after respecting operational

ANNEX I TREE.2.B EN

security limits in contingency situation and taking account of the reliability margin. The capacity of the critical network elements should not take into account internal congestions or flows leaving and entering the same bidding zones without being scheduled. A Commission decision on the bidding zone configuration should be possible as a measure of last resort and only amend the bidding zone configuration in those Member States which have opted for a split or which have not reached the minimum level of the benchmark. For Member States adopting an action plan to overcome congestions with measures, a phase-in period for the opening of interconnectors should apply. To this end, Member State should agree on a linear trajectory the starting point of which is the capacity allocated at this border before the implementation of the action plan.

ANNEX I TREE.2.B EN

  • 27. 
    (15) Efficient decarbonisation (15) Efficient [ ] market of the electricity system via integration requires

    market integration requires systematically abolishing systematically abolishing barriers to cross-border trade to barriers to cross-border trade to overcome market fragmentation overcome market fragmentation and to allow Union energy and to allow Union energy customers to fully benefit from customers to fully benefit from the advantages of integrated the advantages of integrated electricity markets and electricity markets and competition. competition.

  • 28. 
    (16) This Regulation should (16) This Regulation should lay down basic principles with lay down basic principles with regard to tarification and regard to tarification and

    capacity allocation, whilst capacity allocation, whilst providing for the adoption of providing for the adoption of guidelines detailing further guidelines detailing further relevant principles and relevant principles and methodologies, in order to methodologies, in order to allow allow rapid adaptation to rapid adaptation to changed changed circumstances. circumstances.

  • 29. 
    (17) The management of (17) The management of congestion problems should congestion problems should provide correct economic provide correct economic signals signals to transmission system to transmission system operators operators and market and market participants and participants and should be should be based on market based on market mechanisms. mechanisms.

ANNEX I TREE.2.B EN

  • 30. 
    (18) In an open, competitive (18) In an open, competitive market, transmission system market, transmission system

    operators should be operators should be compensated for costs incurred compensated for costs incurred as a result of hosting crossas a result of hosting crossborder flows of electricity on border flows of electricity on their networks by the operators their networks by the operators of the transmission systems of the transmission systems from from which cross-border flows which cross-border flows originate and the systems where originate and the systems where those flows end. those flows end.

  • 31. 
    (19) Payments and receipts (19) Payments and receipts resulting from compensation resulting from compensation between transmission system between transmission system operators should be taken into operators should be taken into account when setting national account when setting national network tariffs. network tariffs.
  • 32. 
    (20) The actual amount (20) The actual amount payable for cross-border access payable for cross-border access to the system can vary to the system can vary

    considerably, depending on the considerably, depending on the transmission system operator transmission system operator involved and as a result of involved and as a result of differences in the structure of differences in the structure of the the tarification systems applied tarification systems applied in in Member States. A certain Member States. A certain degree degree of harmonisation is of harmonisation is therefore therefore necessary in order to necessary in order to avoid avoid distortions of trade. distortions of trade.

ANNEX I TREE.2.B EN

  • 33. 
    (21) There should be rules on (21) There should be rules on the use of revenues flowing the use of revenues flowing from from congestion-management congestion-management

    procedures, unless the specific procedures, unless the specific nature of the interconnector nature of the interconnector concerned justifies an concerned justifies an exemption exemption from those rules. from those rules.

  • 34. 
    (22) To provide for a level (22) To provide for a level playing field between all playing field between all market market participants, network participants, network tariffs tariffs should be applied in a should be applied in a way way which does not which does not discriminate discriminate between between production connected at production connected at the the distribution-level with regard distribution-level with regard to to the production connected at the production connected at the the transmission level, either transmission level, either positively or negatively. They positively or negatively. They should not discriminate against should not discriminate against energy storage, and should not energy storage, and should not create disincentives for

    create disincentives for participation in demand response participation in demand or represent an obstacle to response or represent an improvements in energy obstacle to improvements in efficiency. energy efficiency.

ANNEX I TREE.2.B EN

  • 35. 
    (23) In order to increase (23) In order to increase

    transparency and comparability transparency and comparability in tariff-setting where binding in tariff-setting where binding harmonization is not seen as harmonization is not seen as adequate, recommendations on adequate, [ ] best practice tariff methodologies should be report on tariff methodologies issued by the European Agency should be issued by the for the Cooperation of Energy European Agency for the Regulators established by Cooperation of Energy [recast of Regulation (EC) No Regulators established by [recast 713/2009 as proposed by of Regulation (EC) No 713/2009 i COM(2016) 863 i/2] ("the as proposed by COM(2016) Agency"). 863/2] ("the Agency").

  • 36. 
    (24) To better ensure optimum (24) To better ensure optimum

    investment in the transinvestment in the trans-European European grid and address the grid and address the challenge challenge where viable where viable interconnection interconnection projects cannot projects cannot be built for lack be built for lack of prioritisation of prioritisation at national level, at national level, the use of the use of congestion rents congestion rents should be should be reconsidered and reconsidered and only allowed contribute [ ] to guarantee in order to guarantee availability and maintain or availability and maintain or increase interconnection increase interconnection capacities. capacities.

  • 37. 
    (25) In order to ensure (25) In order to ensure optimal

    optimal management of the management of the electricity electricity transmission network transmission network and to and to allow trading and allow trading and supplying supplying electricity across electricity across borders in the borders in the Union , a Union, a European Network of European Network of Transmission System Operators Transmission System Operators for Electricity (the ENTSO for for Electricity (the ENTSO for Electricity), should be Electricity), should be established. The tasks of the established. The tasks of the ENTSO for Electricity should be ENTSO for Electricity should carried out in compliance with

ANNEX I TREE.2.B EN

be carried out in compliance Union's competition rules which with Union's competition rules remain applicable to the which remain applicable to the decisions of the ENTSO for decisions of the ENTSO for Electricity. The tasks of the Electricity. The tasks of the ENTSO for Electricity should be ENTSO for Electricity should well-defined and its working be well-defined and its working method should ensure method should ensure efficiency, transparency and the efficiency, transparency and the representative nature of the representative nature of the ENTSO for Electricity. The ENTSO for Electricity. The network codes prepared by the network codes prepared by the ENTSO for Electricity are not ENTSO for Electricity are not intended to replace the necessary intended to replace the national network codes for nonnecessary national network cross-border issues. Given that codes for non-cross-border more effective progress may be issues. Given that more achieved through an approach at effective progress may be regional level, transmission achieved through an approach system operators should set up at regional level, transmission regional structures within the system operators should set up overall cooperation structure, regional structures within the whilst ensuring that results at overall cooperation structure, regional level are compatible whilst ensuring that results at with network codes and nonregional level are compatible binding ten-year network with network codes and nondevelopment plans at Union binding ten-year network level. Member States should development plans at Union promote cooperation and level. Member States should monitor the effectiveness of the promote cooperation and network at regional level. monitor the effectiveness of the Cooperation at regional level network at regional level. should be compatible with Cooperation at regional level progress towards a competitive should be compatible with and efficient internal market in progress towards a competitive electricity. and efficient internal market in electricity.

ANNEX I TREE.2.B EN

  • 38. 
    (26) A robust medium to AM 4

    long-term Union level resource (26) A robust methodology for (26) A robust medium to longadequacy assessment should be the long-term Union level resource term Union level resource carried out by the ENTSO for adequacy assessment should be adequacy assessment should be Electricity to provide an carried out by the ENTSO for carried out by the ENTSO for objective basis for the Electricity to provide an objective Electricity to provide an assessment of adequacy basis for the assessment of objective basis for the concerns. The resource adequacy concerns at the Union, assessment of adequacy adequacy concern that capacity regional and Member State level concerns. In order to provide mechanisms address should be and the biding zone levels. The this objective basis for all based on the EU assessment. resource adequacy concern that types of capacity mechanisms, capacity mechanisms address the resource adequacy should be based on the EU assessment shall reflect in its assessment. Capacity mechanisms scenarios and sensitivities the should be allowed to be introduced different types of capacity only if the Union level resource mechanisms. The resource adequacy assessment, conducted adequacy concern that capacity by the ENTSO-E, has identified mechanisms address should be adequacy concerns or if a positive based on [ ] a well coordinated decision concerning the national and European implementation plan has been resource adequacy assessment.

    received from the Commission. 39. (27) The medium to long-term AM 5 (27) The medium to long-term

    resource adequacy assessment (27) The methodology for the resource adequacy assessment (from 10 year-ahead to yearlong-term resource adequacy (from 10 year-ahead to yearahead) set out in this regulation assessment (from 10 year-ahead to ahead) set out in this regulation has a different purpose than the year-ahead) set out in this has a different purpose than the seasonal outlooks (six months regulation has a different purpose seasonal outlooks (six months ahead) as set out in Article 9 than the seasonal outlooks (six ahead) as set out in Article 9 [Regulation on risk months ahead) as set out in Article [Regulation on risk preparedness preparedness as proposed by 9 [Regulation on risk preparedness as proposed by COM(2016) COM(2016) 862 i]. Medium- to as proposed by COM(2016) 862 i]. 862]. Medium- to long-term long-term assessments are Medium- to long-term assessments assessments are mainly used to mainly used to assess the need are mainly used to identify assess the need for capacity for capacity mechanisms adequacy concerns whereas mechanisms whereas seasonal

ANNEX I TREE.2.B EN

whereas seasonal outlooks are seasonal outlooks are used to alert outlooks are used to alert to risks used to alert to risks that might to short-term risks that might occur that might occur in the following occur in the following six in the following six months that are six months that are likely to months that are likely to result likely to result in a significant result in a significant in a significant deterioration of deterioration of the electricity deterioration of the electricity the electricity supply situation. supply situation. In addition, supply situation. In addition, [ ] In addition, Regional Regional Coordination Centres Regional Security Operational Centres also carry also carry out regional adequacy Coordinators also carry out out regional adequacy assessments as defined in European regional adequacy assessments assessments as defined in legislation on electricity as defined in European European legislation on transmission system operation. legislation on electricity electricity transmission system These are very short-term adequacy transmission system operation. operation. These are very shortassessments (from weak-ahead to These are very short-term term adequacy assessments day-ahead) used in the context of adequacy assessments (from (from weak-ahead to daysystem operation. weak-ahead to day-ahead) used ahead) used in the context of in the context of system system operation. operation.

  • 40. 
    (28) Prior to introducing (28) Prior to introducing capacity mechanisms, Member capacity mechanisms, Member States should assess regulatory States should assess regulatory distortions contributing to the distortions contributing to the related resource adequacy related resource adequacy concern. They should be concern. They should be

    required to adopt measures to required to adopt measures to eliminate the identified eliminate the identified distortions including a timeline distortions including a timeline for their implementation. for their implementation. Capacity mechanisms should Capacity mechanisms should only be introduced for the only be introduced for the [ ] residual concerns that cannot be concerns that cannot be addressed through removing addressed through removing such distortions. such distortions.

ANNEX I TREE.2.B EN

  • 41. 
    AM 6

    (28a) Member States should introduce capacity mechanisms only as a last resort, where adequacy concerns cannot be addressed through the removal of existing market distortions. Before introducing a capacity mechanism which operates within the electricity market and therefore is market-distortive, Member States should evaluate whether strategic reserves would be sufficient to address their adequacy concerns. Strategic reserves are less distortive since they operate only outside the market and only in rare cases when markets can no longer clear. Strategic reserves can avoid financial consequences to market operators that cannot fulfil their balancing responsibilities and that would consequently bear significant cost.

  • 42. 
    (29) Member States intending (29) Member States intending to introduce capacity to introduce capacity

    mechanisms should derive mechanisms should derive resource adequacy targets resource adequacy targets following a transparent and following a transparent and verifiable process. Member verifiable process. Member States should have the freedom States should have the freedom to set their own desired level of to set their own desired level of security of supply. security of supply.

ANNEX I TREE.2.B EN

  • 43. 
    (30) Main principles of (30) Main principles of capacity mechanisms should be capacity mechanisms should be laid down, building on the laid down. Capacity mechanisms environmental and energy State already in place should be aid principles and the findings reviewed in light of these of DG Competition's Sector principles. In case the European Inquiry on capacity and the national resource mechanisms. Capacity adequacy assessment reveals the mechanisms already in place absence of any adequacy should be reviewed in light of concern, no new capacity these principles. In case the mechanism should be

    European resource adequacy established and no new capacity assessment reveals the absence commitments under mechanisms of any adequacy concern, no already in place should be made. new capacity mechanism The application of the State aid should be established and no control rules pursuant to Articles new capacity commitments 107 to 109 TFUE must be under mechanisms already in complied with at all times. place should be made. The application of the State aid control rules pursuant to Articles 107 to 109 TFUE must be complied with at all times.

  • 44. 
    (31) Detailed rules for AM 7

    facilitating effective cross(31) Detailed rules for facilitating (31) Detailed rules for border participation in capacity effective cross-border participation facilitating effective crossmechanisms other than reserve in capacity mechanisms other than border participation in capacity schemes should be laid down. strategic reserves should be laid mechanisms other than reserve Transmission system operators down in this Regulation. schemes should be laid down. across the borders should Transmission system operators Transmission system operators facilitate interested generators across the borders should facilitate across the borders should wanting to participate in the participation of interested facilitate interested generators capacity mechanisms in other generators in capacity mechanisms wanting to participate in Member States. Therefore, they in other Member States. Therefore, capacity mechanisms in other should calculate capacities up they should calculate capacities up Member States. Therefore, they

    to which cross-border to which cross-border participation should calculate capacities up to which cross-border participation

ANNEX I TREE.2.B EN

participation would be possible, would be possible, enable would be possible, enable enable participation and check participation and check participation and check availabilities. National availabilities. National regulatory availabilities. [ ] Regulatory regulatory authorities should authorities should enforce the authorities should enforce the enforce the cross-border rules cross-border rules in the Member cross-border rules in the in the Member States. States. Member States.

  • 45. 
    (32) In view of differences in

    national energy systems and (32) In view of differences in technical limitations of existing national energy systems and electricity networks, the best technical limitations of existing approach to achieving progress electricity networks, the best in market integration will often approach to achieving progress be at a regional level. Regional in market integration will often cooperation of transmission be at a regional level. Regional system operators should thus be cooperation of transmission strengthened. In order to ensure system operators should thus be efficient cooperation, a new strengthened. In order to ensure regulatory framework should efficient cooperation, a new foresee stronger regional regulatory framework should governance and regulatory foresee stronger regional oversight, including by governance and regulatory strengthening the decisionoversight, including by making power of the Agency strengthening the decisionfor cross-border issues. Closer making power of the Agency for cooperation of Member States cross-border issues. Closer could be needed also in crisis cooperation of Member States situations, to increase security could be needed also in crisis of supply and limit market situations, to increase security of

    distortions. supply and limit market distortions.

  • 46. 
    (33) The coordination (33) The coordination between Provisionally agreed in TM: between transmission system transmission system operators at (33) The coordination between operators at regional level has regional level has been transmission system operators at regional been formalised with the formalised with the mandatory level has been formalised with the mandatory participation of participation of transmission mandatory participation of transmission transmission system operators system operators in regional system operators in regional security

ANNEX I TREE.2.B EN

in regional security security coordinators, which coordinators. The regional coordination of coordinators, which should be should be [ ] further developed transmission system operators which complemented by an enhanced and support the increasingly should be [ ] further developed with an institutional framework via the integrated operation of enhanced institutional framework via the establishment of regional electricity systems across the establishment of Regional Coordination operational centres. The Union, ensuring their efficient Centres. The establishment of Regional creation of regional operational and secure performance. Coordination Centres should take into centres should take into account account existing or planned regional existing regional coordination coordination initiatives and support the initiatives and support the increasingly integrated operation of increasingly integrated electricity systems across the Union, operation of electricity systems ensuring their efficient and secure across the Union, ensuring their performance. efficient and secure performance. For this reason, it is necessary to ensure that the coordination of transmission system operators through Regional Coordination Centres takes place across the EU. Where transmission system operators of a given region are not coordinated yet by an existing or planned Regional Coordination Centre, the transmission system operator of that region should establish or designate a Regional Coordination Centre.

(in relation to article 32.1 (line 521)) 47. (34) The geographical scope (34) The geographical scope of Provisionally agreed in TM:

of regional operational centres [ ] Regional Security (34) The geographical scope of Regional should allow them to play an Coordinators should allow Coordination Centres should allow them to effective coordination role by them to play an effective play an effective contribution to the optimising the operations of contribution to the coordination of [ ] the operations of transmission system operators coordination of [ ] the transmission system operators over [ ] over larger regions. operations of transmission regions and lead to enhanced system system operators over [ ] security and market efficiency. Regional regions and lead to enhanced Coordination Centres should have the

ANNEX I TREE.2.B EN

system security and market flexibility to carry out the tasks in the efficiency. Regional Security region as best adapted to the nature of the Coordinators should have the individual tasks entrusted to them. flexibility to carry out the tasks in the region as best adapted to the nature of the individual tasks entrusted to them.

  • 48. 
    (35) Regional operational AM 8 (35) [ ] Regional Security Provisionally agreed in TM: centres should carry out (35) Regional coordination Coordinators should fulfil (35) Regional Coordination Centres functions where their centres should carry out functions tasks where their regionalisation should perform fulfil tasks where their regionalisation brings added where their regionalisation brings brings added value compared to regionalisation brings added value compared value compared to functions added value compared to functions functions performed at national to functions tasks performed at national performed at national level. The performed at national level. The level. The [ ] tasks of [ ] level. The [ ] tasks of Regional functions of regional functions of regional operational Regional Security Coordination Centres should cover the operational centres should centres should cover the functions Coordinators should cover the functions tasks carried out by regional cover the functions carried out carried out by regional security functions carried out by regional security coordinators pursuant to the by regional security coordinators as well as additional security coordinators pursuant System Operation Guideline 4 as well as coordinators as well as functions with regional to the System Operation additional system operation, market additional system operation, importance. The functions carried Guideline 3 as well as additional operation and risk preparedness tasks market operation and risk out by regional coordination system operation, market functions. The [ ] tasks carried out by preparedness functions. The centres should exclude real time operation and risk preparedness Regional Coordination Centresshould functions carried out by operation of the electricity system. functions. The [ ] tasks carried exclude real time operation of the electricity regional operational centres out by [ ] Regional Security system.

    should exclude real time Coordinators should exclude operation of the electricity real time operation of the system. electricity system.

3 Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (OJ L 220, 25.8.2017, p. 1). 4 Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (OJ L 220, 25.8.2017, p. 1).

ANNEX I TREE.2.B EN

  • 49. 
    AM 9 Provisionally agreed in TM:

    (35 a) In performing their (35 a) In performing their tasks functions, functions, regional coordination regional coordination centres should shall centres shall contribute to the contribute to the achievement of the 2030 achievement of the 2030 and 2050 and 2050 objectives set out in the climate objectives set out in the climate and energy policy framework. and energy policy framework.

  • 50. 
    (36) Regional operational (36) [ ] Regional Security Provisionally agreed in TM: centres should primarily act in Coordinators should primarily (36) Regional Coordination Centres the interest of system and act in the interest of system and should primarily act in the interest of system market operation of the region market operation of the region and market operation of the region over the over the interests of any single over the interests of any single interests of any single entity. Hence, entity. Hence, regional entity. Hence, [ ] Regional Regional Coordination Centres should be operational centres should be Security Coordinators should entrusted with [ ] the powers necessary to entrusted with decision-making be entrusted with [ ] powers coordinate the support [ ] actions to be powers to act and to direct necessary to support [ ] taken by transmission system operators of actions to be taken by actions to be taken by the system operation region for certain transmission system operators transmission system operators of functions and with an enhanced advisory role of the system operation region the system operation region for for the remaining functions. for certain functions and with certain functions and with an

    an enhanced advisory role for enhanced advisory role for the the remaining functions. remaining functions.

50a. Provisionally agreed in TM:

(36a) The human, technical, physical and financial resources of Regional Coordination Centres should not go beyond what is strictly necessary for the fulfilment of its tasks.

  • 51. 
    (37) ENTSO for Electricity (37) ENTSO for Electricity Provisionally agreed in TM: should ensure that the actions of should ensure that the actions of (37) ENTSO for Electricity should ensure regional operational centres are [ ] Regional Security that the actions activities of Regional coordinated across the regions' Coordinators are coordinated Coordination Centres are coordinated boundaries. across the regions' boundaries. across the regions' boundaries.

ANNEX I TREE.2.B EN

  • 52. 
    (38) In order to raise (38) In order to raise efficiencies in the electricity efficiencies in the electricity distribution networks in the distribution networks in the Union and ensure close Union and ensure close cooperation with transmission cooperation with transmission system operators and ENTSO system operators and ENTSO for electricity, a European for electricity, a European entity entity of distribution system of distribution system operators operators in the Union ("EU in the Union ("EU DSO entity") DSO entity") should be should be established. The tasks established. The tasks of the EU of the EU DSO entity should be DSO entity should be wellwell-defined and its working defined and its working method method should ensure should ensure efficiency, efficiency, transparency and transparency and representativeness amongst the representativeness amongst the Union distribution system Union distribution system operators. The EU DSO Entity operators. The EU DSO Entity should closely cooperate with should closely cooperate with ENTSO for Electricity on the ENTSO for Electricity on the preparation and implementation preparation and implementation of the network codes where of the network codes where applicable and should work on applicable and should work on providing guidance on the providing guidance on the integration inter alia of integration inter alia of distributed generation and distributed generation and storage in distribution networks storage in distribution networks or other areas which relate to the or other areas which relate to management of distribution the management of distribution networks. The EU DSO shall networks. also take due consideration of the specificities inherent in distribution systems connected downstream with electricity systems on islands which are not connected with other electricity systems via interconnectors.

ANNEX I TREE.2.B EN

  • 53. 
    (39) Increased cooperation (39) Increased cooperation and and coordination among coordination among

    transmission system operators transmission system operators is is required to create network required to create network codes codes for providing and for providing and managing managing effective and effective and transparent access transparent access to the to the transmission networks transmission networks across across borders, and to ensure borders, and to ensure coordinated and sufficiently coordinated and sufficiently forward-looking planning and forward-looking planning and sound technical evolution of the sound technical evolution of the transmission system in the transmission system in the Union, including the creation of Union , including the creation interconnection capacities, with of interconnection capacities, due regard to the environment. with due regard to the Those network codes should be environment. Those network in line with framework codes should be in line with guidelines, which are nonframework guidelines, which binding in nature (framework are non-binding in nature guidelines) and which are (framework guidelines) and developed by the Agency. The which are developed by the Agency should have a role in Agency . The Agency should reviewing, based on matters of have a role in reviewing, based fact, draft network codes, on matters of fact, draft including their compliance with network codes, including their the framework guidelines, and it compliance with the framework should be enabled to recommend guidelines, and it should be them for adoption by the enabled to recommend them for Commission. The Agency adoption by the Commission. should assess proposed The Agency should assess amendments to the network proposed amendments to the codes and it should be enabled network codes and it should be to recommend them for adoption enabled to recommend them for by the Commission. adoption by the Commission. Transmission system operators

ANNEX I TREE.2.B EN

Transmission system operators should operate their networks in should operate their networks in accordance with those network accordance with those network codes. codes.

  • 54. 
    (40) To ensure the smooth (40) To ensure the smooth functioning of the internal functioning of the internal

    market in electricity, provision market in electricity, provision should be made for procedures should be made for procedures which allow the adoption of which allow the adoption of decisions and guidelines with decisions and guidelines with regard, inter alia, to tarification regard, inter alia, to tarification and capacity allocation by the and capacity allocation by the Commission whilst ensuring the Commission whilst ensuring the involvement of Member States’ involvement of Member States’ regulatory authorities in that regulatory authorities in that process, where appropriate process, where appropriate through their European through their European association. Regulatory association. Regulatory authorities, together with other authorities, together with other relevant authorities in the relevant authorities in the Member States, have an Member States, have an important role to play in important role to play in contributing to the proper contributing to the proper functioning of the internal functioning of the internal market in electricity. market in electricity.

  • 55. 
    (41) All market participants (41) All market participants have an interest in the work have an interest in the work

    expected of the ENTSO for expected of the ENTSO for Electricity. An effective Electricity. An effective consultation process is therefore consultation process is therefore essential and existing structures essential and existing structures that are set up to facilitate and that are set up to facilitate and streamline the consultation streamline the consultation process, such as via national process, such as via national regulators or the Agency, regulators or the Agency, should should play an important role. play an important role.

ANNEX I TREE.2.B EN

  • 56. 
    (42) In order to ensure greater (42) In order to ensure greater transparency regarding the transparency regarding the entire entire electricity transmission electricity transmission network network in the Union, the in the Union, the ENTSO for

    ENTSO for Electricity should Electricity should draw up, draw up, publish and regularly publish and regularly update a update a non-binding Unionnon-binding Union-wide tenwide ten-year network year network development plan development plan (Union-wide (Union-wide network network development plan). development plan). Viable Viable electricity transmission electricity transmission networks networks and necessary and necessary regional regional interconnections, interconnections, relevant from a relevant from a commercial or commercial or security of supply security of supply point of point of view, should be view, should be included in that included in that network network development plan. development plan

  • 57. 
    (43) Experience with the

    development and adoption of (43) Experience with the network codes has shown that it development and adoption of is useful to streamline the network codes has shown that it development procedure by is useful to streamline the clarifying that the Agency has development procedure by the right to revise draft clarifying that the Agency has electricity network codes before the right to [ ] approve draft submitting them to the electricity network codes before

    Commission. submitting them to the Commission.

ANNEX I TREE.2.B EN

  • 58. 
    (44) Investments in major new (44) Investments in major new Council proposal for an addition: infrastructure should be infrastructure should be

    promoted strongly while promoted strongly while (44) Investments in major new ensuring the proper functioning ensuring the proper functioning infrastructure should be promoted strongly of the internal market in of the internal market in while ensuring the proper functioning of the electricity. In order to enhance electricity. In order to enhance internal market in electricity. In order to

    the positive effect of exempted the positive effect of exempted

    direct current interconnectors direct current interconnectors on enhance the positive effect of exempted on competition and security of competition and security of direct current interconnectors on competition supply, market interest during supply, market interest during and security of supply, market interest during the project-planning phase the project-planning phase the project-planning phase should be tested should be tested and should be tested and congestionand congestion-management rules should be congestion-management rules management rules should be adopted. Where direct current should be adopted. Where adopted. Where direct current interconnectors are located in the territory of direct current interconnectors interconnectors are located in more than one Member State, the Agency are located in the territory of the territory of more than one should handle as a last resort the exemption more than one Member State, Member State, the Agency request in order to take better account of its the Agency should handle as a should handle as a last resort the cross-border implications and to facilitate its last resort the exemption exemption request in order to administrative handling. Moreover, given the request in order to take better take better account of its crossexceptional risk profile of constructing those account of its cross-border border implications and to exempt major infrastructure projects, implications and to facilitate its facilitate its administrative undertakings with supply and production administrative handling. handling. Moreover, given the interests should be able to benefit from a Moreover, given the exceptional risk profile of temporary derogation from the full exceptional risk profile of constructing those exempt major unbundling rules for the projects concerned. constructing those exempt infrastructure projects, Exemptions granted under Regulation (EC) major infrastructure projects, undertakings with supply and No 1228/2003 7 continue to apply until the undertakings with supply and production interests should be scheduled expiry date as decided in the production interests should be able to benefit from a temporary granted exemption decision. Offshore able to benefit from a derogation from the full electricity infrastructure with dual

    temporary derogation from the unbundling rules for the projects

    full unbundling rules for the concerned. Exemptions granted functionality (so-called ‘offshore hybrid

    projects concerned. Exemptions under Regulation (EC) No assets’) combining transport of offshore wind energy to shore and interconnectors,

ANNEX I TREE.2.B EN

granted under Regulation (EC) 1228/2003 i 6 continue to apply should also be eligible for exemption such No 1228/2003 5 continue to until the scheduled expiry date as under the rules applicable to new direct apply until the scheduled expiry as decided in the granted current interconnectors. Where necessary, date as decided in the granted exemption decision. the regulatory framework should duly exemption decision. consider the specific situation of these

assets to overcome barriers to the realisation of societally cost-efficient offshore hybrid assets.

  • 59. 
    (45) To enhance trust in the (45) To enhance trust in the market, its participants need to market, its participants need to be sure that those engaging in be sure that those engaging in abusive behaviour can be abusive behaviour can be subject subject to effective, to effective, proportionate and proportionate and dissuasive dissuasive penalties. The

    penalties. The competent competent authorities should be authorities should be given the given the competence to competence to investigate investigate effectively effectively allegations of allegations of market abuse. To market abuse. To that end, it is that end, it is necessary that necessary that competent competent authorities have authorities have access to data access to data that provides that provides information on information on operational operational decisions made by decisions made by supply supply undertakings. In the undertakings. In the electricity electricity market, many market, many relevant decisions relevant decisions are made by are made by the generators, the generators, which should which should keep information keep information in relation in relation thereto available to

7 Regulation (EC) No 1228/2003 i of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity (OJ L 176, 15.7.2003, p. 1).

5 Regulation (EC) No 1228/2003 i of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity (OJ L 176, 15.7.2003, p. 1).

6 Regulation (EC) No 1228/2003 i of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity (OJ L 176, 15.7.2003, p. 1).

ANNEX I TREE.2.B EN

thereto available to and easily and easily accessible by the accessible by the competent competent authorities for a fixed authorities for a fixed period of period of time. The competent time. The competent authorities authorities should, furthermore, should, furthermore, regularly regularly monitor the monitor the compliance of the compliance of the transmission transmission system operators system operators with the rules. with the rules. Small generators Small generators with no real with no real ability to distort the ability to distort the market market should be exempt from should be exempt from that that obligation. obligation.

  • 60. 
    (46) The Member States and (46) The Member States and the competent national the competent national

    authorities should be required authorities should be required to to provide relevant information provide relevant information to to the Commission. Such the Commission. Such information should be treated information should be treated confidentially by the confidentially by the Commission. Where necessary, Commission. Where necessary, the Commission should have an the Commission should have an opportunity to request relevant opportunity to request relevant information directly from information directly from undertakings concerned, undertakings concerned, provided that the competent provided that the competent national authorities are national authorities are informed. informed.

ANNEX I TREE.2.B EN

  • 61. 
    (47) Member States should (47) Member States should lay lay down rules on penalties down rules on penalties

    applicable to infringements of applicable to infringements of the provisions of this the provisions of this Regulation Regulation and ensure that they and ensure that they are are implemented. Those implemented. Those penalties penalties must be effective, must be effective, proportionate proportionate and dissuasive. and dissuasive.

  • 62. 
    (48) Member States and the (48) Member States, [ ] the

    Energy Community Contracting Energy Community Contracting Parties should closely cooperate Parties and other third on all matters concerning the countries which are applying development of an integrated this Regulation or are part of electricity trading region and the synchronous grid of should take no measures that Continental Europe should endanger the further integration closely cooperate on all matters of electricity markets or concerning the development of security of supply of Member an integrated electricity trading States and Contracting Parties. region and should take no measures that endanger the further integration of electricity markets or security of supply of Member States and Contracting Parties.

ANNEX I TREE.2.B EN

  • 63. 
    (49) In order to ensure the (49) At the time of adoption minimum degree of of Regulation 714/2009 i, only harmonization required for few rules for the internal

    effective market functioning, electricity market existed at the power to adopt acts in EU level. Since then, the EU accordance with Article 290 of internal market has become

    the Treaty on the Functioning

    of the European Union should more complex due to the be delegated to the Commission fundamental change the in respect of areas which are markets are undergoing in fundamental for market particular regarding integration. These should deployment of variable include the geographical area renewable electricity for regional cooperation of production. Therefore the transmission system operators, Network Codes and Guidelines the amount of compensation have become extensively payments between transmission comprehensive addressing system operators, the adoption both technical and general and amendment of network issues. In order to ensure the codes and guidelines, as well as minimum degree of the application of exemption harmonization required for provisions for new effective market functioning, the interconnectors. It is of power to adopt and amend particular importance that the implementing acts in Commission carry out accordance with Article 291 of appropriate consultations the Treaty on the Functioning of during its preparatory work, the European Union should be [ including at expert level, and ] conferred to the Commission that those consultations be in respect of non-essential conducted in accordance with elements of certain specific

    the principles laid down in the

    Interinstitutional Agreement on areas which are fundamental for Better Law-Making of 13 April market integration. These should 2016 . In particular, to ensure include [ ] the adoption and equal participation in the amendment of network codes preparation of delegated acts, and guidelines, as well as the the European Parliament and application of exemption

ANNEX I TREE.2.B EN

the Council receive all provisions for new documents at the same time as interconnectors. It is of Member States' experts, and particular importance that the their experts systematically Commission carry out have access to meetings of appropriate consultations during Commission expert groups its preparatory work, including

dealing with the preparation of

delegated acts. at expert level, and that those consultations be conducted in

accordance with the principles laid down in the Interinstitutional Agreement on Better Law-Making of 13 April 2016 8 . In particular, to ensure equal participation in the preparation of [ ] implementing acts, the European Parliament and the Council receive all documents at the same time as Member States' experts, and their experts systematically have access to meetings of Commission expert groups dealing with the preparation of [ ] implementing acts.

8 OJ L 123, 12.5.2016, p. 1.

ANNEX I TREE.2.B EN

  • 64. 
    (49a) The empowerment of the Commission to amend network codes and guidelines is limited until 31 December 2027. This interim period shall provide sufficient time for the Commission to carry out a review of the existing network codes and guidelines and if needed propose legislative acts of the Union.
  • 65. 
    (50) Since the objective of (50) Since the objective of this this Regulation, namely the Regulation, namely the

    provision of a harmonised provision of a harmonised framework for cross-border framework for cross-border exchanges of electricity, cannot exchanges of electricity, cannot be sufficiently achieved by the be sufficiently achieved by the Member States and can Member States and can therefore therefore be better achieved at be better achieved at Union Union level, the Union may level, the Union may adopt adopt measures, in accordance measures, in accordance with the with the principle of principle of subsidiarity, as set subsidiarity, as set out in out in Article 5 of the Treaty on Article 5 of the Treaty on European Union . In accordance European Union. In accordance with the principle of with the principle of proportionality, as set out in that proportionality, as set out in Article, this Regulation does not that Article, this Regulation go beyond what is necessary in does not go beyond what is order to achieve that objective. necessary in order to achieve that objective.

    HAVE ADOPTED THIS REGULATION:

ANNEX I TREE.2.B EN

  • 66. 
    (51) Market rules should enable the integration of

    electricity from renewable energy sources and provide incentives for increasing energy efficiency.

  • 67. 
    (52) For reasons of coherence and legal certainty, nothing in this Regulation should prevent the application of the

    derogations emerging from [Article 66] of [Electricity Directive].

  • 68. 
    (53) With regard to balancing markets, efficient and non-distortive price formation in the procurement of balancing capacity and balancing energy requires that balancing capacity does not set the price for balancing energy. This is without prejudice for the dispatching systems using an integrated scheduling process according to the Commission Regulation (EU) 2017/XXXX [Balancing]. HAVE ADOPTED THIS REGULATION:

ANNEX I TREE.2.B EN

  • 69. 
    Chapter I Subject matter, scope and definitions
  • 70. 
    Article 1 Subject-matter and scope
  • 71. 
    This Regulation aims at: AM 10 (a) setting the basis for an This Regulation aims at: Provisionally agreed:

    (a) setting the basis for an efficient achievement of the

    efficient achievement of the objectives of the European Energy (a) setting the basis for an

    (a) setting the basis for an efficient

    objectives of the European Union and in particular the climate efficient achievement of the

    achievement of the objectives of the

    Energy Union and in particular and energy framework for 2030 30 objectives of the European

    European Energy Union and in particular the

    the climate and energy by enabling market signals to be Energy Union and in particular

    climate and energy framework for 2030 11 by

    framework for 2030 9 by delivered for increased flexibility, the climate and energy

    enabling market signals to be delivered for

    enabling market signals to be efficiency, decarbonisation, framework for 2030

    10 by increased efficiency, higher share of

    delivered for increased innovation and a higher share of enabling market signals to be

    renewable energy sources, security of

    flexibility, decarbonisation and renewable energy sources. delivered for increased security

    supply, flexibility, sustainability, decarbonisation and innovation;

    innovation; __________________ of supply, flexibility,

    30

     COM/2014/015 final. sustainability, decarbonisation and innovation;

9 COM/2014/015 final.

10 COM/2014/015 final.

11 COM/2014/015 final.

ANNEX I TREE.2.B EN

  • 72. 
    (b) setting fundamental AM 11

    principles for well-functioning, (b) setting fundamental (b) setting fundamental

    Provisionally agreed:

    integrated electricity markets, principles for well-functioning principles for well-functioning, which allow non-discriminatory cross-border, integrated and liquid integrated electricity markets,

    (b) setting fundamental principles for wellmarket

    access for all resource electricity markets, which allow which allow non-discriminatory

    functioning, integrated electricity markets,

    providers and electricity non-discriminatory market access market access for all resource

    which allow non-discriminatory market

    customers, empower for all resource providers and providers and electricity

    access for all resource providers and

    consumers, enable demand electricity customers, empower customers, empower consumers,

    electricity customers, empower consumers,

    response and energy efficiency, consumers, enable competitiveness enable demand response and

    enable competitiveness on the global market

    facilitate aggregation of on the global market, demand energy efficiency, facilitate

    as well as demand response, energy storage

    distributed demand and supply, response, energy storage and aggregation of distributed

    and energy efficiency, facilitate aggregation

    and contribute to the energy efficiency, facilitate demand and supply, [ ] and

    of distributed demand and supply, [ ] and

    decarbonisation of the economy aggregation of distributed demand enable market integration and

    enabling market and sectoral integration

    by enabling market integration and supply, and contribute to the market-based remuneration of

    and market-based remuneration of electricity

    and market-based remuneration decarbonisation of the economy by electricity generated from

    generated from renewable sources;

    of electricity generated from enabling market and sectoral renewable sources;

    renewable sources; integration and market-based remuneration of electricity

    generated from renewable sources;

ANNEX I TREE.2.B EN

  • 73. 
    (c) setting fair rules for (c) setting fair rules for cross No change cross-border exchanges in border exchanges in electricity,

electricity, thus enhancing thus enhancing competition (c) setting fair rules for cross-border

competition within the internal within the internal market in exchanges in electricity, thus enhancing

market in electricity, taking into electricity, taking into account competition within the internal market in

account the particular the particular characteristics of electricity, taking into account the particular

characteristics of national and national and regional markets. characteristics of national and regional

regional markets. This includes This includes the establishment markets. This includes the establishment of a

the establishment of a of a compensation mechanism compensation mechanism for cross-border

compensation mechanism for for cross-border flows of flows of electricity and the setting of

cross-border flows of electricity electricity and the setting of harmonised principles on cross-border

and the setting of harmonised harmonised principles on crosstransmission charges and the allocation of

principles on cross-border border transmission charges and available capacities of interconnections

transmission charges and the the allocation of available between national transmission systems;

allocation of available capacities of interconnections

capacities of interconnections between national transmission

between national transmission systems;

systems;

  • 74. 
    (d) facilitating the AM 12 (d) facilitating the emergence Provisionally agreed:

emergence of a well(d) facilitating the emergence of of a well-functioning and

functioning and transparent a well-functioning, liquid and transparent wholesale market (d) facilitating the emergence of a wellwholesale

market with a high transparent whole sale market with a high level of security of functioning and transparent whole sale

level of security of supply in contributing to a high level of supply in electricity. It provides market contributing to a high level of

electricity. It provides for security of supply in electricity. It for mechanisms to harmonise security of supply in electricity. It provides

mechanisms to harmonise the provides for mechanisms to the rules for cross-border for mechanisms to harmonise the rules for

rules for cross-border harmonise the rules for crossexchanges in electricity cross-border exchanges in electricity.

exchanges in electricity. border exchanges in electricity.

ANNEX I TREE.2.B EN

  • 75. 
    Article 2 Definitions
  • 76. 
    1. For the purpose of this 1. For the purpose of this Council proposal for an addition:

    Regulation, the definitions Regulation, the definitions 1. For the purpose of this Regulation, the contained in Article 2 of contained in Article 2 of definitions contained in Article 2 of Directive [recast of Directive Directive [recast of Directive Directive [recast of Directive 2009/72/EC i as 2009/72/EC as proposed by 2009/72/EC as proposed by proposed by COM(2016) 864 i/2], in Article 2 COM(2016) 864 i/2], in Article 2 COM(2016) 864 i/2], in Article 2 of Regulation (EU) No 1227/2011 i of the of Regulation (EU) No of Regulation (EU) No European Parliament and of the Council

    16

    , in

    1227/2011 of the European 1227/2011 of the European Article 2 of Commission Regulation (EU) Parliament and of the Parliament and of the Council 14 , No 543/2013

    17 and in Article 2 of [Recast

    Council 12 , in Article 2 of in Article 2 of Commission Renewable Energies Directive] apply with Commission Regulation (EU) Regulation (EU) No 543/2013 i 15 the exception of the definition of No 543/2013 13 and in Article 2 and in Article 2 of [Recast ‘interconnector’ which shall be replaced of [Recast Renewable Energies Renewable Energies Directive] by the following: ‘interconnector’ means a Directive] apply. apply [with the exception of the transmission line which crosses or spans a definition of ‘interconnector’ border between Member States and which which shall be replaced by the connects the national transmission following:— ‘interconnector’ systems of the Member States.

    means a transmission line which crosses or spans a border

12 Regulation (EU) No 1227/2011 i of the European Parliament and of the Council of 25 October 2011 on wholesale energy market integrity and transparency (OJ L 326, 8.12.2011, p. 1).

13 Commission Regulation (EU) No 543/2013 i of 14 June 2013 on submission and publication of data in electricity markets and amending Annex I to

Regulation (EC) No 714/2009 i of the European Parliament and of the Council (OJ L 163, 15.6.2013, p. 1). 14 Regulation (EU) No 1227/2011 i of the European Parliament and of the Council of 25 October 2011 on wholesale energy market integrity and transparency

(OJ L 326, 8.12.2011, p. 1). 15 Commission Regulation (EU) No 543/2013 i of 14 June 2013 on submission and publication of data in electricity markets and amending Annex I to

Regulation (EC) No 714/2009 i of the European Parliament and of the Council (OJ L 163, 15.6.2013, p. 1). 16 Regulation (EU) No 1227/2011 i of the European Parliament and of the Council of 25 October 2011 on wholesale energy market integrity and transparency

(OJ L 326, 8.12.2011, p. 1). 17 Commission Regulation (EU) No 543/2013 i of 14 June 2013 on submission and publication of data in electricity markets and amending Annex I to

Regulation (EC) No 714/2009 i of the European Parliament and of the Council (OJ L 163, 15.6.2013, p. 1).

ANNEX I TREE.2.B EN

between Member States and which connects the national transmission systems of the Member States.]

  • 77. 
    2. In addition, the 2. In addition, the following following definitions shall definitions shall apply:

    apply: 78. (a) ‘regulatory authorities’ (a) ‘regulatory authorities’

    means the regulatory authorities means the regulatory authorities referred to in Article 57(1) of referred to in Article 57(1) of [recast of Directive 2009/72/EC i [recast of Directive 2009/72/EC i as proposed by COM(2016) as proposed by COM(2016) 864 i/2] ; 864/2] ;

  • 79. 
    (b) ‘cross-border flow’ (b) ‘cross-border flow’ means means a physical flow of a physical flow of electricity on electricity on a transmission a transmission network of a

    network of a Member State that Member State that results from results from the impact of the the impact of the activity of activity of producers and/or producers and/or customers customers outside that Member outside that Member State on its State on its transmission transmission network; network;

  • 80. 
    (c) ‘congestion’ means a AM 13 (c) ‘congestion’ means a situation in which all requests (c) ‘congestion’ means a situation in which all requests from market participants to situation in which all requests from from market participants to trade trade between two bidding market participants to trade [ ] between [ ] network areas zones cannot be accommodated cannot be accommodated because cannot be accommodated

    because they would they would significantly affect the because they would significantly significantly affect the physical physical flows on network affect the physical flows on flows on network elements elements which cannot network elements which cannot which cannot accommodate accommodate those flows ; accommodate those flows; those flows ;

ANNEX I TREE.2.B EN

  • 81. 
    (d) ‘new interconnector’ (d) ‘new interconnector’ means an interconnector not means an interconnector not completed by 4 August 2003; completed by 4 August 2003;
  • 82. 
    (e) 'structural congestion' AM 14 (e) 'structural congestion' means congestion in the (e) 'structural congestion' means means congestion in the

    transmission system that is congestion in the transmission transmission system that can be predictable, is geographically system that is predictable, [ ] unambiguously defined, is stable over time, and is geographically stable over time, predictable, is geographically frequently reoccurring under and frequently reoccurring under stable over time, and is normal power system normal power system conditions; frequently reoccurring under conditions; normal power system conditions;

  • 83. 
    (f) 'market operator' means (f) 'market operator' means an entity that provides a service an entity that provides a service whereby the offers to sell whereby the offers to sell

    electricity are matched with electricity are matched with bids bids to buy electricity; to buy electricity;

  • 84. 
    (g) 'nominated electricity (g) 'nominated electricity market operator' or 'NEMO’ market operator' or 'NEMO’ means a market operator means a market operator

    designated by the competent designated by the competent authority to perform tasks authority to perform tasks related to single day-ahead or related to single day-ahead or single intraday coupling; single intraday coupling;

  • 85. 
    (h) 'value of lost load' means (h) 'value of lost load' means an estimation in €/MWh, of the an estimation in €/MWh, of the maximum electricity price that maximum electricity price that customers are willing to pay to customers are willing to pay to avoid an outage; avoid an outage;

ANNEX I TREE.2.B EN

  • 86. 
    (i) 'balancing' means all (i) 'balancing' means all actions and processes, in all actions and processes, in all timelines, through which timelines, through which

    transmission system operators transmission system operators ensure, in a continuous way, ensure, in a continuous way, maintenance of the system maintenance of the system frequency within a predefined frequency within a predefined stability range and compliance stability range and compliance with the amount of reserves with the amount of reserves needed with respect to the needed with respect to the required quality; required quality;

  • 87. 
    (j) 'balancing energy' means (j) 'balancing energy' means energy used by transmission energy used by transmission

    system operators to perform system operators to perform balancing; balancing;

  • 88. 
    (k) 'balancing service (k) 'balancing service provider' means a market provider' means a market participant providing either or participant providing either or both balancing energy and both balancing energy and balancing capacity to balancing capacity to

    transmission system operators; transmission system operators; 89. (l) 'balancing capacity' (l) 'balancing capacity' means

    means a volume of capacity that a volume of capacity that a a balancing service provider has balancing service provider has agreed to hold to and in respect agreed to hold to and in respect to which the balancing service to which the balancing service provider has agreed to submit provider has agreed to submit bids for a corresponding bids for a corresponding volume volume of balancing energy to of balancing energy to the the transmission system transmission system operator for operator for the duration of the the duration of the contract; contract;

ANNEX I TREE.2.B EN

  • 90. 
    (m) 'balance responsible (m) 'balance responsible party' party' means a market means a market participant or its participant or its chosen chosen representative

    representative responsible for responsible for its imbalances in its imbalances in the electricity the electricity market; market;

  • 91. 
    (n) 'imbalance settlement (n) 'imbalance settlement period' means the time unit for period' means the time unit for which the imbalance of the which the imbalance of the balance responsible parties is balance responsible parties is calculated; calculated;
  • 92. 
    (o) 'imbalance price' means (o) 'imbalance price' means the price, be it positive, zero or the price, be it positive, zero or negative, in each imbalance negative, in each imbalance

    settlement period for an settlement period for an imbalance in each direction; imbalance in each direction;

  • 93. 
    (p) 'imbalance price area' (p) 'imbalance price area' means the area in which an means the area in which an imbalance price is calculated; imbalance price is calculated;
  • 94. 
    (q) 'prequalification process' (q) 'prequalification process' means the process to verify the means the process to verify the compliance of a provider of compliance of a provider of

    balancing capacity with the balancing capacity with the requirements set by the requirements set by the transmission system operators; transmission system operators;

  • 95. 
    (r) 'reserve capacity' means (r) 'reserve capacity' means the amount of frequency the amount of frequency

    containment reserves, containment reserves, frequency frequency restoration reserves restoration reserves or or replacement reserves that replacement reserves that needs needs to be available to the to be available to the transmission system operator; transmission system operator;

ANNEX I TREE.2.B EN

  • 96. 
    (s) 'priority dispatch' means (s) 'priority dispatch' means the dispatch of power plants on in self-dispatch model the

    the basis of criteria different dispatch of power plants on the from the economic order of bids basis of criteria different from and, in central dispatch the economic order of bids and, systems, network constraints, in central dispatch model also giving priority to the dispatch from network constraints, of particular generation giving priority to the dispatch of technologies; particular generation technologies;

  • 97. 
    (t) 'capacity calculation (t) 'capacity calculation region' means the geographic region' means the geographic area in which the coordinated area in which the coordinated capacity calculation is applied; capacity calculation is applied;
  • 98. 
    (u) 'capacity mechanism' AM 15 (u) 'capacity mechanism' Council compromise: means an administrative (u) capacity mechanism' means means an administrative

    measure to ensure the temporary administrative measures measure or a market based (u) 'capacity mechanism' means an achievement of the desired taken by Member States to fill the measure to ensure the administrative measure to ensure the level of security of supply by expected resource adequacy gap achievement of the desired level achievement of the desired level of security remunerating resources for their for electricity supply to match of [ ] resource adequacy by of supply resource adequacy by availability not including electricity demand by offering remunerating resources for their remunerating resources for their availability measures relating to ancillary additional payments to capacity availability not including not including measures relating to ancillary

    services; providers that operate in the measures relating to ancillary services and congestion management; electricity market, in addition to services and congestion

    income obtained by selling management ; electricity on the market in return for the availability of existing capacity or investment in new capacity to guarantee the necessary level of security of supply;

ANNEX I TREE.2.B EN

  • 99. 
    (v) 'strategic reserve' means AM 16 [ ] a capacity mechanism in which (v) 'strategic reserve' means a

    resources are only dispatched in capacity mechanism in which case day-ahead and intraday resources are held outside the markets have failed to clear, electricity market and are only transmission system operators dispatched in case day-ahead and have exhausted their balancing intraday markets have failed to resources to establish an clear, transmission system equilibrium between demand operators have exhausted their and supply, and imbalances in balancing resources to establish an the market during periods equilibrium between demand and where the reserves were supply, and imbalances in the dispatched are settled at the market during periods where the value of lost load; reserves were dispatched are settled at least at technical price limits or at the value of lost load;

  • 100. 
    (w) ‘high-efficiency (w) ‘high-efficiency cogeneration’ means cogeneration’ means

    cogeneration meeting the cogeneration meeting the criteria criteria laid down in Annex II laid down in Annex II of of Directive 2012/27 i/EU of the Directive 2012/27 i/EU of the European Parliament and of the European Parliament and of the Council 18 ; Council 19 ;

18 Directive 2012/27 i/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives

2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC i and 2006/32/EC (OJ L 315, 14.11.2012, p. 1). 19 Directive 2012/27 i/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives

2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC i and 2006/32/EC (OJ L 315, 14.11.2012, p. 1).

ANNEX I TREE.2.B EN

  • 101. 
    (x) ‘demonstration project’ (x) ‘demonstration project’ means a project demonstrating means a project demonstrating a a technology as a first of its technology as a first of its kind kind in the Union and in the Union and representing a representing a significant significant innovation that goes innovation that goes well well beyond the state of the art. beyond the state of the art.
  • 102. 
    (y) 'market participant' means a natural or legal

    person, who is generating, buying or selling electricity, demand response or storage services, including the placing of orders to trade, in one or more electricity markets including balancing energy markets.

  • 103. 
    (z) 'redispatching' means a measure, including

    curtailment, activated by one or several system operators by altering the generation and/or load pattern in order to change physical flows in the transmission system and relieve a physical congestion.

ANNEX I TREE.2.B EN

  • 104. 
    (aa) 'countertrading' means a cross zonal exchange

    initiated by system operators between two bidding zones to relieve physical congestion.

  • 105. 
    (bb) 'power generating facility' means a facility that converts primary energy into electrical energy and which consists of one or more power generating modules connected to a network.
  • 106. 
    (cc) 'central dispatching model' means a scheduling and dispatching model where the generation schedules and consumption schedules as well as dispatching of power

    generating facilities and demand facilities, in reference to dispatchable facilities, are determined by a TSO within the integrated scheduling process.

  • 107. 
    (dd) 'standard balancing product' means a harmonised balancing product defined by all TSOs for the exchange of balancing services as set out in the Balancing Guideline

    adopted on the basis of Article 18 of the Regulation 714/2009 i.

ANNEX I TREE.2.B EN

  • 108. 
    (ee) 'specific balancing product' means a product different from a standard product, the requirements for which are set out in the Balancing Guideline adopted on the basis of Article 18 of the Regulation 714/2009 i.
  • 109. 
    (ff) 'delegated operator' Provisionally agreed: means an entity to whom (ff) 'delegated operator' means an entity specific tasks or obligations to whom specific tasks or obligations entrusted to a transmission entrusted to a transmission system system operator or nominated operator or nominated electricity market electricity market operator operator under this Regulation or any under this Regulation or any other Regulation, Directive, Network other Regulation, Directive, Code or Guideline have been delegated by Network Code or Guideline that transmission system operator or have been delegated by that nominated electricity market operator or transmission system operator have been assigned by a Member State or or nominated electricity Regulatory Authority; market operator or have been

    assigned by a Member State or Regulatory Authority;

ANNEX I TREE.2.B EN

  • 110. 
    Chapter II

    General rules for the electricity market

  • 111. 
    Article 3

    Principles regarding the operation of electricity markets

  • 112. 
    1. Member States, national AM 17 1. Member States, national Provisionally agreed: regulatory authorities, 1. Member States, national regulatory authorities,

    transmission system operators, regulatory authorities, transmission transmission system operators, 1. Member States, national regulatory distribution system operators, system operators, distribution distribution system operators, [ authorities, transmission system operators, and market operators shall system operators, market operators ] market operators and distribution system operators, [ ] market ensure that electricity markets and third parties to whom delegated operators shall operators and delegated operators shall are operated in accordance with responsibilities have been ensure that electricity markets ensure that electricity markets are operated the following principles: delegated or assigned, shall ensure are operated in accordance with in accordance with the following principles: that electricity markets are operated the following principles: in accordance with the following principles:

  • 113. 
    (a) prices shall be formed (a) prices shall be formed No change based on demand and supply; based on demand and supply. (a) prices shall be formed based on demand and supply.
  • 114. 
    (b) actions which prevent AM 18 (b) actions which prevent Provisionally agreed: price formation on the basis of (b) actions which prevent price price formation on the basis of (b) market rules shall encourage free demand and supply or formation on the basis of demand demand and supply or constitute price formation and avoid actions which constitute a disincentive to the and supply shall be avoided; a disincentive to the prevent price formation on the basis of development of more flexible development of more flexible demand and supply [ ]; generation, low carbon generation, low carbon

    generation, or more flexible generation, or more flexible demand shall be avoided; demand shall be avoided;

  • 115. 
    AM 19 Provisionally agreed:

    Article 3 – paragraph 1 – point b (ba) market rules shall facilitate the a (new) development of more flexible generation, (ba) the development of more sustainable low carbon generation, and flexible generation, sustainable more flexible demand [ ]; low carbon generation, and more flexible demand shall be promoted;

ANNEX I TREE.2.B EN

  • 116. 
    (c) customers shall be AM 20 (c) customers shall be Provisionally agreed: enabled to benefit from market (c) customers shall be enabled enabled to benefit from market (c) customers shall be enabled to benefit opportunities and increased to benefit from market opportunities and increased from market opportunities and increased competition on retail markets; opportunities and increased competition on retail markets; competition on retail markets and be competition on retail markets and empowered to act as participant in the be empowered to act as participant energy market and the energy transition; in the energy market and the

    energy transition; 117. (d) market participation of (d) market participation of No change

    consumers and small businesses consumers and small businesses shall be enabled by aggregation shall be enabled by aggregation (d) market participation of consumers and of generation from multiple of generation from multiple small businesses shall be enabled by generation facilities or load generation facilities or load from aggregation of generation from multiple from multiple demand facilities multiple demand facilities to generation facilities or load from multiple to provide joint offers on the provide joint offers on the demand facilities to provide joint offers on electricity market and be jointly electricity market and be jointly the electricity market and be jointly operated operated in the electricity operated in the electricity in the electricity system, subject to system, subject to compliance system, subject to compliance compliance with EU treaty rules on with EU treaty rules on with EU treaty rules on competition; competition; competition;

  • 118. 
    (e) market rules shall support AM 21 (e) market rules shall [ ] Provisionally agreed: the decarbonisation of the (e) market rules shall support accompany the decarbonisation (e) market rules shall [ ] accompany economy by enabling the the decarbonisation of the of the economy e.g. by enabling enable the decarbonisation of the electricity integration of electricity from electricity system and thus the the integration of electricity system and thus the economy e.g. by renewable energy sources and economy by enabling the from renewable energy sources enabling the integration of electricity from providing incentives for energy integration of electricity from and providing incentives for renewable energy sources and providing efficiency; renewable energy sources energy efficiency; incentives for energy efficiency; including energy storage and

    providing incentives for energy efficiency;

ANNEX I TREE.2.B EN

  • 119. 
    (f) market rules shall deliver AM 22 (f) market rules shall deliver Provisionally agreed: appropriate investment (f) market rules shall encourage appropriate investment f) market rules shall deliver appropriate incentives for generation, free price formation to deliver incentives for generation, investment incentives for generation, in storage, energy efficiency and appropriate investment incentives storage, energy efficiency and particular long-term investments for a demand response to meet for generation, in particular longdemand response to meet market decarbonised and sustainable electricity market needs and thus ensure term investments for a needs and thus ensure security of system, energy storage, energy efficiency, security of supply; decarbonised and sustainable supply; demand response to meet market needs and electricity system storage, energy facilitate fair competition and thus ensure efficiency, demand response and security of supply;

    facilitate fair competition and thus ensure security of supply;

  • 120. 
    (g) barriers to cross-border AM 23 (g) barriers to cross-border Provisionally agreed: electricity flows and cross(g) barriers to cross-border electricity flows between (g) barriers to cross-border electricity border transactions on electricity flows and cross-border bidding zones or Member flows between bidding zones or Member electricity markets and related transactions on electricity markets States and cross-border States and cross-border transactions on services markets shall be and related services markets shall transactions on electricity electricity markets and related services avoided; be removed; markets and related services markets shall be avoided progressively markets shall be avoided; removed;
  • 121. 
    (h) market rules shall AM 24 (h) market rules shall provide Provisionally agreed: provide for regional (h) market rules shall provide for regional cooperation where (h) market rules shall provide for regional cooperation where effective; for strong regional cooperation effective; cooperation where effective; where effective; [strong - to be reflected in recitals]
  • 122. 
    (i) all generation, storage (i) [ ] safe and sustainable Provisionally agreed: and demand resources shall generation, storage and demand (i) [ ] safe and sustainable generation, participate on equal footing in [ ] shall participate on equal storage and demand [ ] shall participate on the market; footing in the market, under the equal footing in the market, under the requirements provided for in requirements provided for in the EU law; the EU law;

ANNEX I TREE.2.B EN

  • 123. 
    (j) all producers shall be (j) all producers shall be No change directly or indirectly directly or indirectly responsible (j) all producers shall be directly or responsible for selling the for selling the electricity they indirectly responsible for selling the electricity they generate; generate; electricity they generate;
  • 124. 
    AM 25 Maintain Council GA

    Article 3 – paragraph 1 – point j [ ] a (new) (ja) electricity generation operators shall bear full financial and legal responsibility deriving from their assets;

  • 125. 
    (k) market rules shall allow AM 26 [ ] Maintain Council GA for progress in research and (k) market rules shall allow for [ ]

    development to be realized and progress in research and used to the benefit of society; development into sustainable, secure and low-carbon energy sources, technologies or systems to be realized and used to the benefit of society;

  • 126. 
    (l) market rules shall enable AM 27 (l) market rules shall enable Provisionally agreed: the efficient dispatch of (l) market rules shall enable the the efficient dispatch of (l) market rules shall enable the efficient generation assets and demand efficient dispatch of generation generation assets and demand dispatch of generation assets, energy storage response; assets, storage and demand response; and demand response; response;

ANNEX I TREE.2.B EN

  • 127. 
    (m) market rules shall allow AM 28 (m) market rules shall allow Provisionally agreed: for entry and exit of electricity (m) market rules shall allow for for entry and exit of electricity (m) market rules shall allow for entry and generation and electricity entry and exit of electricity generation and electricity supply exit of electricity generation, energy storage supply undertakings based on generation, energy storage and undertakings based on their and electricity supply undertakings based on their assessment of the electricity supply undertakings assessment of the economic and their assessment of the economic and economic and financial viability based on their assessment of the financial viability of their financial viability of their operations; of their operations; economic and financial viability of operations;

    their operations; effective competition and price formation;

  • 128. 
    (n) long-term hedging AM 29 (n) [ ] in order to allow Provisionally agreed: opportunities, which allow (n) long-term hedging market participants [ ] to be (n) [ ] in order to allow market market participants to hedge opportunities, which allow market protected against price volatility participants [ ] to be protected against against price volatility risks on participants to hedge against price risks on a market basis, and [ ] price volatility risks on a market basis, and [ a market basis, and eliminate volatility risks on a market basis, mitigate uncertainty on future ] mitigate uncertainty on future returns on uncertainty on future returns on and mitigate uncertainty on future returns on investment, longinvestment, long-term hedging investment shall be tradable on returns on investment shall be term hedging opportunities opportunities shall be tradable on exchanges exchanges in a transparent tradable on exchanges in a shall be tradable on exchanges in in a transparent manner and long-term manner subject to compliance transparent manner subject to a transparent manner and longsupply contracts shall be negotiable over with EU treaty rules on compliance with EU treaty rules on term supply contracts shall be the counter, subject to compliance with EU competition. competition while current negotiable over the counter, treaty rules on competition. products offered on exchanges subject to compliance with EU

    should be further expanded and treaty rules on competition. Market rules shall facilitate trade of promoted at Union level; products on exchanges at across the Union. Regulatory changes shall take into account effects on both short-term Regulatory changes shall take into account and long-term forward and effects on both short-term and long-term futures markets and products. forward and futures markets and products.

  • 129. 
    (o) market participants Provisionally agreed: have a right to obtain access to (o) market participants have a right to the transmission and obtain access to the transmission and distribution networks on distribution networks on objective, objective, transparent and transparent and non-discriminatory non-discriminatory terms. terms.

ANNEX I TREE.2.B EN

  • 130. 
    AM 30

    Article 3 a (new)

  • 131. 
    Just transition
  • 132. 
    The Commission shall support

    Member States that put in place a national strategy for the progressive reduction of installed coal and other solid fossil fuel generation and mining capacity through all available means, including targeted financial support to enable a “just transition” in regions affected by structural change. The Commission shall assist Member States to address the social, skills and industrial impacts of the clean energy transition.

  • 133. 
    The Commission shall work in close partnership with the actors of coal and carbon-intensive

    regions, provide guidance, in particular for the access to and use of available funds and programmes, and shall encourage the exchange of good practices, including discussions on industrial roadmaps and reskilling needs.

ANNEX I TREE.2.B EN

  • 134. 
    Article 4 Article 4

    Balancing responsibility Balance[ ] responsibility

  • 135. 
    1. All market participants 1. All market participants [ ] shall aim for system balance shall be [ ] responsible for the

    and shall be financially imbalances they cause in the responsible for imbalances they system. To that end, the cause in the system. They shall market participants [ ] shall either be balance responsible either be balance responsible parties or delegate their parties or contractually delegate responsibility to a balance their responsibility to a balance responsible party of their responsible party of their choice. choice. In accordance with the Balancing Guideline adopted on the basis of Article 17 and 18 of the Regulation 714/2009 i, each balance responsible party shall be financially responsible for its imbalances and strive to be balanced or help the power system to be balanced.

  • 136. 
    2. Member States may 2. Member States may provide for derogation from provide [ ] derogations from [ balance responsibility in respect ] balancing responsibility only of: in the following cases:
  • 137. 
    (a) demonstration projects; (a) demonstration projects for emerging technologies as

    defined in Article 66 and 67 of Regulation (EU) 2016/631 ; 20

20 Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection of generators (OJ L 112, 27.4.2016, p. 1).

ANNEX I TREE.2.B EN

  • 138. 
    (b) generating installations (b) power generating facility using renewable energy sources [ ], using renewable energy

    or high-efficiency cogeneration sources or high-efficiency with an installed electricity cogeneration with a total capacity of less than 500 kW; installed electricity capacity of less than [ ] 250 kW;

  • 139. 
    (c) installations benefitting (c) Without prejudice to from support approved by the contracts concluded before Commission under Union State [entry into force of the

    aid rules pursuant to Articles legislation], and installations 107 to 109 TFEU, and benefitting from support commissioned prior to [OP: approved by the Commission entry into force]. Member under Union State aid rules States may, subject to Union pursuant to Articles 107 to 109 state aid rules, incentivize TFEU, and commissioned prior market participants which are to [OP: entry into force]. fully or partly exempted from Member States may, [ ] balancing responsibility to without prejudice to Articles accept full balancing 107 and 108 TFEU, incentivise responsibility against market participants which are appropriate compensation. fully or partly exempted from balancing responsibility to accept full balancing responsibility[ ].

  • 140. 
    AM 31 2a. When a Member State

    Article 4 – paragraph 2 a (new) chooses to provide a 2a. When a Member State derogation according to chooses to provide a derogation in Article 4 (2), they need to accordance with Article 4(2), it ensure that the financial shall ensure that the financial responsibilities of imbalances responsibilities for imbalances are are fulfilled by another party. fulfilled by another party.

ANNEX I TREE.2.B EN

  • 141. 
    3. From 1 January 2026,

    point (b) of paragraph 2 shall 3. For power generating apply only to generating facilities commissioned after 1 installations using renewable January 2026, point (b) of energy sources or highparagraph 2 shall apply only to efficiency cogeneration with an renewable energy sources or installed electricity capacity of high-efficiency cogeneration

    less than 250 kW. with an total installed electricity capacity of less than [ ] 150 kW.

    Member States may apply a lower threshold.

  • 142. 
    Article 5

    Balancing market

  • 143. 
    1. All market participants AM 32 [ ] Maintain Council GA shall have access to the 1. All market participants,

    balancing market, be it including those providing Entire article was not yet discussed with the individually or through electricity generated from variable EP. The fourth column is identical to REV 2 aggregation. Balancing market renewable sources and demand and 3 seen by COREPER on 7 September rules and products shall respect side response and storage services and 12 October. the need to accommodate shall have full access to the increasing shares of variable balancing market, be it individually generation as well as increased or through aggregation. Balancing demand responsiveness and the market rules and products shall advent of new technologies. respect the need to accommodate increasing shares of variable generation as well as increased demand responsiveness and the advent of new technologies.

ANNEX I TREE.2.B EN

  • 144. 
    2. Balancing markets shall AM 33 2. Balancing markets, Compromise proposal: be organised in such a way as to 2. Balancing markets shall be including prequalification 2. Balancing markets, including ensure effective nonorganised in such a way as to processes, shall be organised in prequalification processes, shall be discrimination between market ensure effective non-discrimination such a way as to: organised in such a way as to: participants taking account of between market participants. All (a) ensure effective non(a) ensure effective non-discrimination the different technical generation, including from discrimination between market between market participants taking account capability of generation from variable renewable sources, participants taking account of of the different technical [ ] needs of the variable renewable sources and demand side response and storage the different technical [ ] needs power system and the different technical demand side response and shall be enabled to participate on of the power system, a capabilities of generation sources, energy storage. equal footing in balancing transparent and storage and demand response; markets, taking account of the technologically neutral

    different technical capability. definition of services and their (aa) ensure a transparent and transparent, market based technologically neutral definition of procurement, services and their transparent, market based procurement,

  • 145. 
    (b) ensure access to all Compromise proposal: prequalified market Ref. to prequalification remains in 5(2) and participants, be it individual 5(8).

    or through aggregation; (b) ensure non-discriminatory access to all [ ] market participants, including

    electricity generated from variable renewable sources, demand response and energy storage, be it individual or through aggregation;

  • 146. 
    (c) respect the need to Maintain Council GA accommodate increasing

    shares of variable generation as well as increased demand responsiveness and the advent of new technologies.

ANNEX I TREE.2.B EN

  • 147. 
    3. Balancing energy shall be AM 34 [ ] Compromise proposal: procured separately from 3. Balancing energy shall be This corresponds to 5(5a) of the GA; see balancing capacity. procured separately from balancing also article 16(6) of Reg. 2017/2195 Procurement processes shall be capacity. The price of balancing (Balancing Guideline). Exemptions see new transparent while at the same energy shall not be pre-determined para. 5(11).

    time respecting confidentiality. in a contract of balancing except 3. The price of balancing energy shall where an exemption is applied in not be pre-determined [ ] in a contract for accordance with Article 16(6) of balancing capacity.

    the Commission Regulation (EU) 2017/2195 1a . Procurement Procurement processes shall be processes shall be transparent while transparent while at the same time at the same time respecting respecting confidentiality in accordance confidentiality. with paragraph 4 of Article 40 of the _______________ [recast Electricity Directive].

    1a

    Commission Regulation (EU) 2017/2195 of 23 November 2017 establishing a guideline on electricity balancing (OJ L 312, 28.11.2017 p. 6).

  • 148. 
    4. Balancing markets

    shall ensure operational security 4. Balancing markets shall

    No change

    whilst allowing for maximum ensure operational security

    • 4. 
      Balancing markets shall ensure

    use and efficient allocation of whilst allowing for maximum

    operational security whilst allowing for

    cross-zonal capacity across use and efficient allocation of

    maximum use and efficient allocation of cross-zonal capacity across timeframes in

    timeframes in accordance with cross-zonal capacity across accordance with Article 15.

    Article 15. timeframes in accordance with Article 15.

  • 149. 
    5. Marginal pricing shall be AM 35 5. [ ] For standard and Compromise proposal: used for the settlement of 5. The settlement of balancing specific balancing products, [ ] The settlement of balancing energy for balancing energy. Market energy shall be based on marginal the settlement of balancing standard and specific balancing products participants shall be allowed to pricing. On balancing markets, energy shall be based on shall be based on marginal pricing, pay-asbid as close to real time as market participants shall be marginal pricing, pay-ascleared, [ ]

    possible, and at least after the allowed to bid as close to real time cleared, without prejudice to intraday cross-zonal gate as possible, and balancing energy the Balancing Guideline Market participants shall be allowed to bid as closure time determined in gate closure times shall not be adopted on the basis of Article close to real time as possible, and [ ] accordance with Article 59 of before intraday cross-zonal gate 18 of the Regulation 714/2009 i. balancing energy gate closure times shall

ANNEX I TREE.2.B EN

Commission Regulation (EU) closure time determined in Market participants shall be not be before the intraday cross-zonal gate 2015/1222 21 . accordance with Article 59 of allowed to bid as close to real closure time [ ]. Commission Regulation (EU) time as possible, and [ ] 2015/1222 34 balancing energy gate closure Transmission system operator applying a __________________ times shall not be before the central dispatching model may define

34

 Commission Regulation (EU) intraday cross-zonal gate closure additional rules in accordance with [ ] the 2015/1222 of 24 July 2015 time determined in accordance Balancing Guideline adopted on the basis establishing a guideline on capacity with Article 59 of Commission of Article 18 of the Regulation 714/2009 i. allocation and congestion Regulation (EU) 2015/1222 22 . management (OJ L 197, 25.7.2015, Transmission system operator p. 24). applying a central dispatching

model may define additional rules in accordance with the Balancing Guideline adopted on the basis of Article 18 of the Regulation 714/2009 i.

  • 150. 
    5a. The price of balancing Compromise proposal: energy shall not be pre Accept to delete here

    determined in a contract for Paragraph 5a is moved to paragraph 3.

    balancing capacity. An exemption for specific balancing products may be applied in accordance with the Balancing Guideline adopted on the basis of Article 18 of the Regulation 714/2009 i. Procurement processes shall be transparent while at the same time respecting confidentiality in accordance with paragraph 4 of Article 40 of the [recast Electricity Directive].

21 Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (OJ L 197, 25.7.2015, p. 24).

22 Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (OJ L 197, 25.7.2015, p. 24).

ANNEX I TREE.2.B EN

  • 151. 
    6. The imbalances shall be 6. The imbalances shall be Compromise proposal: settled at a price that reflects settled at a price that reflects the Accept to revert to COM original proposal the real time value of energy. real time value of energy and 6. The imbalances shall be settled at a shall be calculated in price that reflects the real time value of accordance with the Balancing energy.

    Guideline adopted on the basis of Article 18 of the Regulation 714/2009.

  • 152. 
    6a. The imbalance price Compromise proposal: area shall be equal to a Accept to modify GA and merge with Am 64. bidding zone, except in case of For the part on imbalance and scheduling a central dispatching model areas see Article 54(2) of Reg. 2017/2195 and in accordance with (Balancing Guideline). Balancing Guideline adopted 6a. Each imbalance price area shall be on the basis of Article 18 of the equal to a bidding zone, except in case of a Regulation 714/2009 i. The central dispatching model where an imbalance area shall be equal imbalance price area may constitute a to the scheduling area, except part of a bidding zone. [ ] in case of a central dispatching

    model where imbalance area may constitute a part of a scheduling area in accordance with the Balancing Guideline adopted on the basis of Article 18 of the Regulation 714/2009 i.

ANNEX I TREE.2.B EN

  • 153. 
    7. The sizing of reserve AM 36 7. The [ ] dimensioning of Compromise proposal: capacity shall be performed at 7. The sizing of reserve reserve capacity shall be 7. The [ ] dimensioning of reserve regional level in accordance capacity shall be performed at performed [ ] by the capacity shall be performed [ ] by the with point 7 of Annex I. regional level in accordance with transmission system operators transmission system operators [ ] and Regional operational centres point 7 of Annex I. Regional in accordance with the System may be facilitated on a regional level. shall support transmission coordination centres shall support Operation Guideline adopted

    system operators in determining transmission system operators in on the basis of Article 18 of the the amount of balancing determining the amount of Regulation 714/2009 i and may capacity that needs to be balancing capacity that needs to be be facilitated on a regional procured in accordance with procured in accordance with point level. point 8 of Annex I. 8 of Annex I.

  • 154. 
    8. The procurement of AM 37 8. The procurement of Compromise proposal: balancing capacity shall be 8. The procurement of balancing capacity shall be The reference to a primary market (COM facilitated on a regional level in balancing capacity shall be performed by the transmission and EP wording) clarifies that organizing accordance with point 8 of performed by the transmission system operators, facilitated on balancing via obligations on all market Annex I. The procurement shall system operators. The procurement a regional level in accordance participants with a secondary market is not be based on a primary market shall be based on a primary market with [ ] Balancing Guideline sufficient.

    and organised in such a way as and organised in such a way as to adopted on the basis of Article to be non-discriminatory be non-discriminatory between 18 of the Regulation 714/2009 i. 8. The procurement of balancing between market participants in market participants in the The procurement of balancing capacity shall be performed by the the prequalification process prequalification process, whether capacity shall be market-based transmission system operators and may be individually or through market participants participate [ ] and organised in such a way facilitated on a regional level [ ]. aggregation. individually or through aggregation as to be non-discriminatory The procurement of balancing capacity subject to technical constraints between market participants in shall be market-based [ ] and organised in inherent in managing networks. the prequalification process such a way as to be non-discriminatory The reservation of cross-zonal individually or through between market participants in the capacity for the exchange of aggregation in accordance with prequalification process, whether market balancing capacity shall be limited paragraph 4 of Article 40 of participants participate individually or to 5% of the available capacity for the [recast Electricity through aggregation in accordance with the exchange of energy of the Directive]. paragraph 4 of Article 40 of the [recast previous relevant calendar year Electricity Directive]. between the respective bidding zones.

ANNEX I TREE.2.B EN

  • 155. 
    9. The procurement of AM 38 9. The procurement of Maintain Council GA upward balancing capacity and 9. The procurement of upward upward balancing capacity and

    downward balancing capacity balancing capacity and downward downward balancing capacity shall be carried out separately. balancing capacity shall be carried shall be carried out separately, [ The contracting shall be out separately. Procurement of ] in accordance with the performed for not longer than balancing capacity shall be Balancing Guideline adopted one day before the provision of performed for not longer than one on the basis of Article 18 of the the balancing capacity and the day before the provision of the Regulation 714/2009 i. To the contracting period shall have a balancing capacity and the extent possible, and at least for maximum of one day. contracting period shall have a a minimum of 40 % of the maximum duration of one day. standard products used for balancing capacity, the contracting of balancing capacity shall be performed for not longer than one day before the provision of the balancing capacity and the contracting period shall have a maximum of one day. The contracting of the remaining part of the balancing capacity shall be performed for a maximum of one month in advance of the provision of balancing capacity and the contracting period of the remaining part of balancing capacity shall have a maximum period of one month.

ANNEX I TREE.2.B EN

  • 156. 
    9a. On the request of the Maintain Council GA transmission system operator

    the regulatory authority may extend the contracting period of the remaining part of balancing capacity referred to in paragraph 9 to a maximum period of twelve months provided that such decision will be limited in time, and the positive effects in terms of lowering of costs for consumers will exceed the negative impacts on the market. The request shall include:

  • 157. 
    (a) specification of the time Maintain Council GA period during which the

    exemption would apply; 158. (b) specification of the volume Maintain Council GA

    of balancing capacity for which the exemption would apply;

ANNEX I TREE.2.B EN

  • 159. 
    (c) analysis of the impact of Maintain Council GA such an exemption on the

    participation of balancing resources; and

  • 160. 
    (d) justification for the Maintain Council GA exemption demonstrating that

    such an exemption would lead to lower costs for consumers.

  • 161. 
    10. Transmission system AM 39 10. Transmission system Compromise proposal: operators shall publish close to 10. Transmission system operators shall publish, [ ] as 10. Transmission system operators or real-time information on the operators or third parties to whom soon as possible but not later third parties delegated operators shall current balancing state of their these responsibilities have been than 30 minutes after real-time, publish, [ ] as soon as possible but not control areas, the imbalance delegated by the relevant the information on the current [ later than 30 minutes after real-time, the price and the balancing energy transmission system operator, ] system balance of their [ ] information on the current [ ] system price. Member State or regulatory scheduling areas [ ] and the balance of their [ ] scheduling areas, [ ] authority shall publish close to estimated [ ] balancing energy the estimated imbalance prices [ ] and the real-time information on the prices. To the extent that estimated [ ] balancing energy prices. current balancing state of their responsibility for provision of

    control areas, the estimated this information has been imbalance price and the estimated assigned or delegated to a balancing energy price. third party, in accordance with the Balancing Guideline adopted on the basis of Article 18 of the Regulation 714/2009Article, those parties will be responsible for meeting the requirements of this Article.

ANNEX I TREE.2.B EN

  • 162. 
    AM 40 Reject

    Article 5 – paragraph 10 a (new) 10a. Member States shall report on the functioning and transparency of, and access to, in particular by small providers, the balancing markets, in particular for the purpose of Article 4, through the reporting procedure on the internal energy market laid down in Article 21 of Regulation .../... [Governance of the Energy Union].

  • 163. 
    New proposal in reference to paragraphs 3,

    5 and 5a of the GA and Articles 25-26 of Reg. 2017/2195 (Balancing Guideline). Exemptions for specific products (to avoid copying the entire Balancing Guideline) are bundled here. 11. Transmission system operators may, where standard balancing products are not sufficient to ensure operational security or some balancing resources cannot participate in the balancing market through standard balancing products, propose exemptions from paragraphs 3 and 5 for specific balancing products which are activated locally without exchanging them with other transmission system operators.

    Exemptions for specific balancing products shall be subject to approval by the national regulatory authority.

ANNEX I TREE.2.B EN

  • 164. 
    Article 6

    Day-ahead and intraday markets

  • 165. 
    1. Transmission system 1. Transmission system Provisionally agreed:

    operators and nominated operators and nominated electricity market operators electricity market operators shall 1. Transmission system operators and shall jointly organise the jointly organise the management nominated electricity market operators shall management of the integrated of the integrated day-ahead and jointly organise the management of the day-ahead and intraday markets intraday markets based on integrated day-ahead and intraday markets based on market coupling as set market coupling as set out in based on market coupling as set out in out in Regulation (EU) Regulation (EU) 2015/1222. Regulation (EU) 2015/1222. Transmission 2015/1222. Transmission Transmission system operators system operators and nominated electricity system operators and nominated and nominated electricity market market operators shall cooperate at Union electricity market operators operators shall cooperate at level or, where more appropriate, on a shall cooperate at Union level Union level or, where more regional basis in order to maximise the or, where more appropriate, on appropriate, on a regional basis efficiency and effectiveness of Union a regional basis in order to in order to maximise the electricity day-ahead and intraday trading. maximise the efficiency and efficiency and effectiveness of The obligation to cooperate shall be without effectiveness of Union Union electricity day-ahead and prejudice to the application of the provisions electricity day-ahead and intraday trading. The obligation of Union competition law. In their functions intraday trading. The obligation to cooperate shall be without relating to electricity trading, transmission to cooperate shall be without prejudice to the application of system operators and nominated electricity prejudice to the application of the provisions of Union market operators shall be subject to the provisions of Union competition law. In their regulatory oversight by regulators and the competition law. In their functions relating to electricity Agency pursuant to Article 59 of [recast of functions relating to electricity trading, transmission system Directive 2009/72/EC i as proposed by trading, transmission system operators and nominated COM(2016) 864 i/2] and Articles 4 and 9 of operators and nominated market electricity market operators [recast of Regulation (EC) No 713/2009 i as operators shall be subject to shall be subject to regulatory proposed by COM(2016) 863 i/2]. regulatory oversight by oversight by regulators and the regulators and the Agency Agency pursuant to Article 59 of pursuant to Article 59 of [recast [recast of Directive 2009/72/EC i of Directive 2009/72/EC i as as proposed by COM(2016) proposed by COM(2016) 864 i/2] and Articles 4 and 9 of 864/2] and Articles 4 and 9 of [recast of Regulation (EC) No [recast of Regulation (EC) No 713/2009 i as proposed by 713/2009 as proposed by COM(2016) 863 i/2]. COM(2016) 863 i/2].

ANNEX I TREE.2.B EN

  • 166. 
    2. Day-ahead and intraday 2. Day-ahead and intraday No change markets shall markets shall 2. Day-ahead and intraday markets shall
  • 167. 
    (a) be organised in such a AM 41 (a) be organised in such a Provisionally agreed: way as to be non(a) be [ ] non-discriminatory; way as to be non-discriminatory; (a) be organised in such a way as to be discriminatory; non-discriminatory;
  • 168. 
    (b) maximise the ability of (b) maximise the ability of all Provisionally agreed: market participants to market participants to [ ] (b) maximise the ability of all market contribute to avoid system manage their imbalances; participants to [ ] manage [ ] imbalances; imbalances;
  • 169. 
    (c) maximise the (c) maximise the Provisionally agreed: opportunities for market opportunities for all market (c) maximise the opportunities for all participants to participate in participants to participate in market participants to participate in cross-[ ] cross-border trade as close as cross-[ ] zonal trade as close as zonal trade as close as possible to real time possible to real time across all possible to real time across all across all bidding zones; bidding zones; bidding zones;
  • 170. 
    (d) provide prices that reflect (d) provide prices that reflect Provisionally agreed: market fundamentals and that market fundamentals, including (d) provide prices that reflect market market participants can rely on the real time value of energy, fundamentals, including the real time value when agreeing on longer-term and that market participants can of energy, and that market participants can hedging products; rely on when agreeing on rely on when agreeing on longer-term longer-term hedging products; hedging products;
  • 171. 
    (e) ensure operational (e) ensure operational No change security whilst allowing for security whilst allowing for (e) ensure operational security whilst maximum use of transmission maximum use of transmission allowing for maximum use of transmission capacity; capacity; capacity;
  • 172. 
    (f) be transparent while at (f) be transparent while at the Provisionally agreed: the same time respecting same time respecting (f) be transparent while at the same time confidentiality; confidentiality and ensuring respecting confidentiality and ensuring trading occurs in an trading occurs in an anonymous manner; anonymous manner; and; and;

ANNEX I TREE.2.B EN

  • 173. 
    (g) ensure trades are [ ] Provisionally agreed: [ ] anonymous; and
  • 174. 
    (h) make no distinction (h) make no distinction No change between trades made within a between trades made within a (h) make no distinction between trades bidding zone and across bidding zone and across bidding made within a bidding zone and across bidding zones. zones. bidding zones.

174a. Provisionally agreed to add additional point (i) in exchange for Council deletion of

paragraph 3 below (line 175).

(i) be organised in such a way as to ensure that all markets participants are able to access the market individually or through aggregation.

  • 175. 
    3. Market operators shall be AM 42 [ ] Provisionally agreed: [ ] free to develop products and 3. Market operators shall be

    trading opportunities that suit free to develop products and In addition provisionally agreed to add new market participants' demand trading opportunities that suit point (i) to Article 6(2) above (line 174a). and needs and ensure that all market participants' demand and market participants are able to needs and ensure that all market access the market individually participants are able to access the or through aggregation. They market individually or through shall respect the need to aggregation. They shall respect the accommodate increasing shares need to accommodate increasing of variable generation as well as shares of variable generation and increased demand energy storage as well as increased responsiveness and the advent demand responsiveness and the of new technologies. advent of new technologies

ANNEX I TREE.2.B EN

  • 176. 
    Article 7

    Trade on day-ahead and intraday markets

  • 177. 
    1. Market operators shall AM 43 1. Nominated electricity Provisionally agreed to keep Nominated allow market participants to 1. Market operators shall allow market operators shall allow electricity market operators.

    trade energy as close to real market participants to trade energy market participants to trade time as possible and at least up as close to real time as possible and energy as close to real time as AM 43 or keeping the ref. to CACM to the intraday cross-zonal gate at least up to 15 minutes before possible and at least up to the guideline is still under negotiations. closure time determined in real time across all bidding zones. intraday cross-zonal gate closure accordance with Article 59 of time determined in accordance Regulation (EU) 2015/1222. with [ ] the capacity allocation and congestion management guideline adopted on the basis of Article 18 of Regulation (EU) 714/2009.

  • 178. 
    2. Market operators shall AM 44 2. Nominated electricity Compromise proposal: (Seen by COREPER provide market participants 2. Market operators shall market operators shall provide on 7 September and 12 October) Still to be with the opportunity to trade in provide market participants with market participants with the discussed with the EP

    energy in time intervals at least the opportunity to trade in energy opportunity to trade in energy in as short as the imbalance in national and cross-border time intervals at least as short as 2. Nominated electricity market settlement period in both daymarkets in time intervals at least as the imbalance settlement period operators shall provide market participants ahead and intraday markets. short as the imbalance settlement in both day-ahead and intraday with the opportunity to trade in energy in period in both day-ahead and markets in accordance with time intervals at least as short as the intraday markets. the balancing guideline imbalance settlement period in both dayadopted on the basis of Article ahead and intraday markets [ ] 18 of Regulation (EU) 714/2009.

ANNEX I TREE.2.B EN

  • 179. 
    3. Market operators shall AM 45 3. Nominated electricity Compromise proposal: (Seen by COREPER provide products for trading in 3. Market operators shall market operators shall provide on 7 September and 12 October) Still to be day-ahead and intraday markets provide products for trading in dayproducts for trading in daydiscussed with the EP

    which are sufficiently small in ahead and intraday markets which ahead and intraday markets size, with minimum bid sizes of are sufficiently small in size, with which are sufficiently small in 3. Nominated electricity market 1 Megawatt or less, to allow for minimum bid sizes of 500 size, with minimum bid sizes of operators shall provide products for trading the effective participation of Kilowatt, to allow for the effective 1 Megawatt [ ], to allow for the in day-ahead and intraday markets which are demand-side response, energy participation of demand-side effective participation of sufficiently small in size, with minimum bid storage and small-scale response, energy storage and smalldemand-side response, energy sizes of 1 Megawatt or less, to allow for the renewables. scale renewables including directly storage and small-scale effective participation of demand-side by customers. renewables in accordance to response, energy storage and small-scale the methodologies developed renewables including directly by customers. in the capacity allocation and [ ] congestion management guideline adopted on the basis of Article 18 of Regulation (EU) 714/2009.

  • 180. 
    4. By 1 January 2025, the AM 46

    imbalance settlement period 4. By 1 January 2021, the 4. By 1 January 2021, the

    Compromise proposal discussed in Coreper

    shall be 15 minutes in all imbalance settlement period shall imbalance settlement period

    on 12 October, still to be discussed with the EP:

control areas. be 15 minutes in all control areas. shall be 15 minutes in all [ ] scheduling areas unless 4. By 1 January 2021, the imbalance

regulatory authorities have settlement period shall be 15 minutes in all [ granted a derogation or an ] scheduling areas unless regulatory exemption in accordance with authorities have granted a derogation or the balancing guideline an exemption in accordance with the adopted on the basis of Article balancing guideline adopted on the basis

18 of the Regulation 714/2009 i. of Article 18 of the Regulation 714/2009 i. Derogations and exemptions may only be

granted until 1 January 2025.

ANNEX I TREE.2.B EN

  • 181. 
    Article 8

    Forward markets

  • 182. 
    1. In line with Regulation 1. In line with Regulation Maintain Council GA

    (EU) 2016/1719, transmission (EU) 2016/1719, transmission system operators shall issue system operators shall issue long-term transmission rights or long-term transmission rights or have equivalent measures in have equivalent measures in place to allow for market place to allow for market participants, in particular participants, [ ] including owners of generation facilities owners of generation facilities using renewable energy using renewable energy sources, sources, to hedge price risks to hedge price risks across across bidding zone borders. bidding zone borders, unless an assessment of the forward market performed by the competent regulatory authorities on the bidding zone borders shows sufficient hedging opportunities in the concerned bidding zones in accordance with the guideline on forward capacity allocation adopted on the basis of Article 18 of the Regulation 714.

ANNEX I TREE.2.B EN

  • 183. 
    2. Long-term transmission 2. Long-term transmission Maintain Council GA rights shall be allocated in a rights shall be allocated in a

    transparent, market based and transparent, market based and non-discriminatory manner non-discriminatory manner through a single allocation through a single allocation platform. Long-term platform [ ] according to the transmission rights shall be firm provisions of the guideline on and be transferable between forward capacity allocation market participants. adopted on the basis of Article 18 of the Regulation 714/2009 i.

  • 184. 
    3. Subject to compliance AM 47 3. Subject to compliance Provisionally agreed: with treaty rules on 3. Subject to compliance with with treaty rules on competition,

    competition, market operators treaty rules on competition, market market operators shall be free to 3. Subject to compliance with treaty shall be free to develop forward operators shall be free to develop develop forward hedging rules on competition, market operators shall hedging products including for forward hedging products products including for the longbe free to develop forward hedging products the long-term to provide market including for the long-term to term to provide market including for the long-term to provide participants, in particular provide market participants, in participants, [ ] including market participants, [ ] including owners of owners of generation facilities particular owners of generation owners of generation facilities generation facilities using renewable energy using renewable energy facilities using renewable energy using renewable energy sources, sources, with appropriate possibilities to sources, with appropriate sources, with appropriate with appropriate possibilities to hedge financial risks from price fluctuations. possibilities to hedge financial possibilities to hedge financial risks hedge financial risks from price Member States shall not restrict such risks from price fluctuations. from price fluctuations. Member fluctuations. Member States hedging activity to trades within a Member Member States shall not restrict States shall support the liquidity of shall not restrict such hedging State or bidding zone. such hedging activity to trades such products, in particular of activity to trades within a within a Member State or exchange-based products that Member State or bidding zone. bidding zone. have already been developed, and shall allow them to be traded across bidding zones.

ANNEX I TREE.2.B EN

  • 185. 
    Article 9 Article 9

    Price Restrictions [ ] Technical bidding limits

  • 186. 
    1. There shall be no AM 48 1. [ ] Wholesale Compromise proposal: (Seen by COREPER maximum limit of the 1. There shall be no maximum electricity prices and on 7 September and 12 October) Still to be wholesale electricity price [ ] and no minimum limit of the balancing energy prices, discussed with the EP

    unless it is set at the value of wholesale electricity price [ ]. This including bidding and clearing lost load as determined in provision shall apply, inter alia, to prices, shall not be subject to a There shall be no maximum [ ] and no accordance with Article 10. bidding and clearing in all minimum or maximum limit. minimum limit of the wholesale electricity There shall be no minimum timeframes and include balancing This is without prejudice to price [ ]. This provision shall apply, inter limit of the wholesale energy and imbalance prices. the technical price limits alia, to bidding and clearing in all electricity price unless it is set which may be applied in the timeframes and include balancing energy and at a value of minus 2000 € or balancing timeframe imbalance prices. This is without prejudice less and, in the event that it is or according to the Balancing to the technical price limits which may be anticipated to be reached, set at Guideline adopted on the basis applied in the balancing timeframe a lower value for the following of Article 18 of the Regulation according to the Balancing Guideline day. This provision shall apply, 714/2009 and in the day-ahead adopted on the basis of Article 18 of the inter alia, to bidding and and intraday timeframes as set Regulation 714/2009 i and in the day-ahead clearing in all timeframes and out in the following and intraday timeframes as set out in the include balancing energy and paragraph. following paragraph. imbalance prices.

  • 187. 
    2. By way of derogation AM 49 2. [ ] Nominated electricity Compromise proposal: (Seen by COREPER from paragraph 1, until [OP: 2. By way of derogation from market operators may apply on 7 September and 12 October) Still to be two years after entry into force] paragraph 1, market operators may harmonised limits on maximum discussed with the EP

    market operators may apply apply technical limits on maximum and minimum clearing prices limits on maximum clearing and minimum bidding limits for for day-ahead and intraday 2. Nominated electricity market operators prices for day-ahead and day-ahead and intraday timeframes timeframes in accordance with [ may apply harmonised limits on maximum intraday timeframes in in accordance with Articles 41 and ] the capacity allocation and and minimum clearing prices for day-ahead accordance with Articles 41 and 54 of Regulation (EU) 2015/1222 congestion management and intraday timeframes in accordance with [ 54 of Regulation (EU) and for the balancing timeframe guideline adopted on the basis ] the capacity allocation and congestion 2015/1222. In the event that in accordance with Regulation of Article 18 of the Regulation management guideline adopted on the limits are, or are anticipated to (EU) 2017/2195. In the event that 714/2009. These limits shall basis of Article 18 of the Regulation be, reached, they shall be raised those technical limits are, or are take into account the 714/2009. These limits shall be sufficiently

for the following day. anticipated to be, reached, they maximum value of lost load. high so as not to unnecessarily restrict shall be automatically adjusted. Nominated market operators trade, be harmonised for the common

The technical price limits shall be shall implement a transparent market area and take into account the

ANNEX I TREE.2.B EN

sufficiently high so as not to mechanism to adjust maximum value of lost load. Nominated unnecessarily restrict trade, and automatically the technical market operators shall implement a shall be harmonised for the bidding limits in due time in transparent mechanism to adjust common market area. They shall the event that the set limits are automatically the technical bidding limits be returned to initial values after expected to be reached. The in due time in the event that the set limits the scarcity situation is over. adjusted higher limits shall are expected to be reached. The adjusted remain applicable until higher limits shall remain applicable until further increases under this further increases under this mechanism mechanism are required. are required.

  • 188. 
    3. Transmission system 3. Transmission system Maintain Council GA operators shall not take any operators shall not take any

    measures with the aim of measures with the aim of changing the wholesale prices. changing the wholesale prices. [ All dispatch orders shall be ] reported to the national regulatory authority within one day.

  • 189. 
    4. Member States shall 4. National regulatory Provisionally agreed: identify policies and measures authorities or other competent

    applied within their territory authorities designated by 4. National regulatory authorities or that could contribute to Member States shall identify other competent authorities designated by indirectly restrict price policies and measures applied Member States shall identify policies and formation, including limiting within their territory that could measures applied within their territory that bids relating to the activation of contribute to indirectly restrict could contribute to indirectly restrict balancing energy, capacity wholesale price formation, wholesale price formation, including mechanisms, measures by the including limiting bids relating limiting bids relating to the activation of transmission system operators, to the activation of balancing balancing energy, capacity mechanisms, measures intended to challenge energy, capacity mechanisms, measures by the transmission system market results or to prevent measures by the transmission operators, measures intended to challenge

    abuse of dominant positions or

inefficiently defined bidding system operators, measures market results or to prevent abuse of

zones. intended to challenge market dominant positions or inefficiently defined results or to prevent abuse of bidding zones.

dominant positions or inefficiently defined bidding zones.

ANNEX I TREE.2.B EN

  • 190. 
    5. Where a Member State 5. Where a national Provisionally agreed: has identified a policy or regulatory authority or other

measure which could serve to competent authority 5. Where a national regulatory

restrict price formation it shall designated by a Member State authority or other competent authority

take all appropriate actions to has identified a policy or designated by a Member State has

eliminate or, if not possible, measure which could serve to identified a policy or measure which could

mitigate the impact on bidding restrict price formation it shall serve to restrict price formation it shall take

behaviour. Member States shall take all appropriate actions to all appropriate actions to eliminate or, if not

provide a report to the eliminate or, if not possible, possible, mitigate the impact on bidding

Commission by [OP: six mitigate the impact on bidding behaviour. Member States shall provide a

months after entry into force] behaviour. Member States shall report to the Commission by [OP: six months

detailing the measures and provide a report to the after entry into force] detailing the measures

actions they have taken or Commission by [OP: six months and actions they have taken or intend to take.

intend to take. after entry into force] detailing

the measures and actions they

have taken or intend to take.

ANNEX I TREE.2.B EN

  • 191. 
    Article 10

    Value of lost load

  • 192. 
    1. By [OP: one year after AM 50 1. By [OP: one year after Provisionally agreed: entry into force] Member States 1. By [OP: one year after entry entry into force] where 1. By [OP: one year after entry into shall establish a single estimate into force] Member States shall required for setting a force] where required for setting a of the Value of Lost Load establish a single estimate of the reliability standard in reliability standard in accordance with (VoLL) for their territory, Value of Lost Load (VoLL) for accordance with Article 20 Article 20 national regulatory authorities expressed in €/MWh. That their territory, expressed in€/MWh. national regulatory authorities or other competent authorities designated estimate shall be reported to the That estimate shall be reported to or other competent authorities by Member States shall establish a single

    Commission and made the Commission and made designated by Member States estimate of the Value of Lost Load (VoLL)

    publically available. Member publically available. In the case of shall establish a single estimate

    States may establish different cross-border bidding zones, of the Value of Lost Load for their territory [ ]. That estimate shall be [ VoLL per bidding zone if they Member States shall establish a (VoLL) for their territory [ ]. ] made publically available. National have several bidding zones in common estimate of the VoLL. That estimate shall be [ ] made regulatory authorities or other competent their territory. In establishing Member States may establish publically available. National authorities designated by Member States VoLL, Member States shall different VoLL per bidding zone if regulatory authorities or other may establish different [ ] estimates per apply the methodology they have several bidding zones in competent authorities bidding zone if they have several bidding developed pursuant to Article their territory. In establishing designated by Member States zones in their territory. In case a bidding 19(5). VoLL, Member States shall apply may establish different [ ] zone consists of territories of more than the methodology developed estimates per bidding zone if one Member State, the concerned pursuant to Article 19(5). they have several bidding zones Member States shall establish a single in their territory. In case a VoLL for that bidding zone. In establishing bidding zone consists of VoLL, national regulatory authorities or territories of more than one other competent authorities designated by Member State, the concerned Member States shall apply the methodology Member States shall establish developed pursuant to Article 19(5).

    a single VoLL for that bidding zone. In establishing VoLL, national regulatory authorities or other competent authorities designated by Member States shall apply the methodology developed pursuant to Article 19(5).

ANNEX I TREE.2.B EN

  • 193. 
    2. Member States shall 2. Member States shall Provisionally agreed: update their estimate at least update their estimate at least 2. Member States shall update their every five years. every five years or when a estimate at least every five years or earlier significant change is observed. when a significant change is observed.
  • 194. 
    Article 11

    Dispatching of generation and demand response

  • 195. 
    1. Dispatching of power

    generation facilities and 1. Dispatching of power demand response shall be nongeneration facilities and demand discriminatory and market response shall be nonbased unless otherwise discriminatory, transparent provided under paragraphs 2 to and, unless otherwise provided

    • 4. 
      under Article 11 (2) to Article 11 (4), market based [ ].
  • 196. 
    2. When dispatching

    electricity generating 2. [ ] Without prejudice to installations, transmission Articles 107 to 109 TFEU system operators shall give Member States may provide priority to generating for electricity generated [ ] installations using renewable using renewable energy sources energy sources or highor high-efficiency cogeneration efficiency cogeneration from from small [ ] power small generating installations or generating facility or power generating installations using generating facility using emerging technologies to the emerging technologies to be

    following extent: granted priority dispatch up to the following extent:

ANNEX I TREE.2.B EN

  • 197. 
    (a) generating installations AM 51 (a) [ ] power generating using renewable energy sources (a) generating installations using facility using renewable energy or high-efficiency cogeneration renewable energy sources or highsources or high-efficiency

    with an installed electricity efficiency cogeneration with an cogeneration with an installed capacity of less than 500 kW; installed electricity capacity of less electricity capacity of less than [ or than 500 kW; [ ] ] 250 kW; or

  • 198. 
    (b) demonstration projects AM 52 (b) demonstration projects for for innovative technologies. (b) generating installations emerging [ ] technologies as

    which are demonstration projects defined in the network code on for innovative technologies; requirements for generators Member States may apply higher adopted on the basis of Article limits to local energy communities 6 of Regulation 714/2009 i. as established in the Directive (EU) ... [recast of Directive 2009/72/EC as proposed by COM(2016) 864 i/2].

  • 199. 
    3. Where the total capacity AM 53 [ ] of generating installations 3. A Member State which does

    subject to priority dispatch not at the time of entry into force under paragraph 2 is higher of this Regulation grant priority than 15 % of the total installed dispatch to any generating generating capacity in a installations may request to be Member State, point (a) of exempted from the provisions of paragraph 2 shall apply only to paragraph 2 if it can demonstrate additional generating to the Commission that all of the installations using renewable following conditions are met: energy sources or highefficiency cogeneration with an installed electricity capacity of less than 250 kW.

ANNEX I TREE.2.B EN

  • 200. 
    (a) no priority dispatch exists for installations other than those listed in paragraph 2 is in place;
  • 201. 
    (b) its liquid intraday, wholesale and balancing markets are fully accessible to all market players in accordance with the provisions of this Regulation;
  • 202. 
    (c) its curtailment rules and congestion management are transparent to all market parties and comply with the provisions of this Regulation;
  • 203. 
    (d) its renewable energy target for

    2030 is sufficient for the collective achievement of the Union’s binding overall target for share of energy from renewable sources pursuant to Article 3(2) of [Directive 2009/28/EC i as proposed by COM(2016) 767 i]and the Member State is expected to meet its target

ANNEX I TREE.2.B EN

  • 204. 
    The Commission shall approve or reject a request for exemption

    within six months of receipt of the request. Any exemption granted shall avoid retroactive changes for installations already benefiting from priority dispatch, notwithstanding any agreement between a Member State and an installation on a voluntary basis.

  • 205. 
    From 1 January 2026, point (a) From 1 January 2026, point (a) of 3a. For power generating of paragraph 2 shall apply only paragraph 2 shall apply only to facility commissioned as from to generating installations using generating installations using 1 January 2026, point (a) of

    renewable energy sources or renewable energy sources or highparagraph 2 shall apply only to high-efficiency cogeneration efficiency cogeneration with an power generating facilities [ ] with an installed electricity installed electricity capacity of less using renewable energy sources capacity of less than 250 kW or, than 250 kW [ ] . or high-efficiency cogeneration if the threshold under the first with an installed electricity sentence of this paragraph has capacity of less than [ ] 150 been reached, of less than 125 kW [ ]. Member States may kW. apply a lower threshold.

ANNEX I TREE.2.B EN

  • 206. 
    4. Generating installations AM 54 4. [ ] Without prejudice to using renewable energy sources 4. Without prejudice to contracts concluded before

    or high-efficiency cogeneration paragraph 3 of this Article, [entry into force of the which have been commissioned generating installations using legislation], power generating prior to [OP: entry into force] renewable energy sources or highfacility using renewable energy and have, when commissioned, efficiency cogeneration which have sources or high-efficiency been subject to priority dispatch been commissioned prior to [OP: cogeneration which have been under Article 15(5) of Directive entry into force] and have, when commissioned prior to [OP: 2012/27/EU of the European commissioned, been subject to entry into force] and have, when Parliament and of the Council priority dispatch under Article 15 commissioned, been subject to or Article 16(2) of Directive (5) of Directive 2012/27 i/EU of the priority dispatch under Article 2009/28/EC of the European European Parliament and of the 15(5) of Directive 2012/27 i/EU Parliament and of the Council 23 Council or Article 16 (2) Directive of the European Parliament and shall remain subject to priority 2009/28/EC of the European of the Council or Article 16(2) dispatch. Priority dispatch shall Parliament and of the Council 39 of Directive 2009/28/EC i of the no longer be applicable from shall remain subject to priority European Parliament and of the the date where the generating dispatch. Priority dispatch shall no Council 24 shall [ ] continue to installation is subject to longer be applicable from the date benefit from priority dispatch. significant modifications, which where the generating installation is Priority dispatch shall no longer shall be the case at least where subject to significant modifications, be applicable from the date a new connection agreement is which shall be the case at least where the [ ] power generating required or the generation where a new connection agreement facility is subject to significant capacity is increased. is required or the generation modifications, which shall be the capacity is increased. case at least where a new 1. __________________ connection agreement is

    35

     Directive 2009/28/EC i of the required or the generation European Parliament and of the capacity is increased.

    Council of 23 April 2009 on the promotion of the use of energy from renewable sources and

23 Directive 2009/28/EC i of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources and amending and subsequently repealing Directives 2001/77/EC i and 2003/30/EC (OJ L 140, 5.6.2009, p. 16).

24 Directive 2009/28/EC i of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources and amending and subsequently repealing Directives 2001/77/EC i and 2003/30/EC (OJ L 140, 5.6.2009, p. 16).

ANNEX I TREE.2.B EN

amending and subsequently repealing Directives 2001/77/EC i and 2003/30/EC (OJ L 140, 5.6.2009, p. 16).

  • 207. 
    5. Priority dispatch shall not

    endanger the secure operation 5. Priority dispatch shall not of the electricity system, shall endanger the secure operation of not be used as a justification for the electricity system, shall not curtailment of cross-border be used as a justification for capacities beyond what is curtailment of cross-border provided for in Article 14 and capacities beyond what is shall be based on transparent provided for in Article 14 and

    and non-discriminatory criteria. shall be based on transparent and non-discriminatory criteria.

  • 208. 
    Article 12 Article 12

    Redispatching and curtailment Redispatching [ ]

  • 209. 
    1. Curtailment or

    redispatching of generation and 1. [ ] Redispatching of redispatching of demand generation and redispatching of response shall be based on demand response shall be based objective, transparent and nonon objective, transparent and

    discriminatory criteria. non-discriminatory criteria. It shall be open to all generation

    technologies, storage and demand response, including operators located in other Member States unless technically not feasible.

ANNEX I TREE.2.B EN

  • 210. 
    2. The resources curtailed AM 55 2. The resources [ or redispatched shall be 2. The resources curtailed or ]redispatched shall be selected selected amongst generation or redispatched shall be selected amongst generation, storage or demand facilities submitting amongst generation, energy demand facilities [ ] using offers for curtailment or storage, and/or demand response market-based mechanisms and redispatching using marketfacilities submitting offers for be financially compensated. [ ] based mechanisms and be curtailment or redispatching using Balancing energy bids used for financially compensated. Nonmarket-based mechanisms and be redispatching shall not set the market-based curtailment or financially compensated. Nonbalancing energy price in redispatching of generation or market-based curtailment or accordance with the Balancing redispatching of demand redispatching of generation or Guideline adopted on the basis response shall only be used redispatching of energy storage of Article 18 of the Regulation where no market-based and/or demand response shall only 714/2009.

    alternative is available, where be used for operational security all available market-based reasons and where no marketresources have been used, or based alternative is available or (part of 2, moved as 2a) where the number of generation where all available market-based or demand facilities available in resources have been used, or where the area where suitable the number of generation, energy generation or demand facilities storage or demand facilities for the provision of the service available in the area where suitable are located is too low to ensure generation, energy storage or effective competition. The demand facilities for the provision provision of market-based of the service are located is too low resources shall be open to all to ensure effective competition. generation technologies, storage The provision of market-based and demand response, including resources shall be open to all operators located in other generation technologies, storage Member States unless and demand response, including technically not feasible. operators located in other Member States unless technically not feasible.

ANNEX I TREE.2.B EN

  • 211. 
    2a. Without prejudice to

    Articles 107 to 109 TFEU nonmarket-based [ ] redispatching of generation or redispatching of demand response [ ] may only be used [ ] subject to the following conditions:

  • 212. 
    (a) no market-based alternative is available,
  • 213. 
    (b) [ ] all available marketbased resources have been used, or
  • 214. 
    (c) [ ] the number of generation or demand facilities available in the area where suitable generation or demand facilities for the provision of the service are located is too low to ensure effective competition. [ ]
  • 215. 
    (d) the current grid situation leads to congestion in such a regular and predictable way that market-based redispatch would lead to regular strategic bidding which would increase the level of internal congestion and the Member State concerned has adopted an action plan to address this congestions or ensures that

    minimum available capacity for cross-zonal trade is in accordance with Article 14 (7).

ANNEX I TREE.2.B EN

  • 216. 
    3. The responsible system AM 56 3. The responsible system operators shall report at least 3. The responsible system operators shall report at least once per year to the competent operators shall report at least once once per year to the competent regulatory authority on per year to the competent regulatory authority on [ ]

    curtailment or downward regulatory authority, which shall downward redispatching of redispatching of generating be transmitted to the Agency, on: power generating facility [ ] installations using renewable using renewable energy sources energy sources or highor high-efficiency cogeneration [ efficiency cogeneration and on ]. measures taken to reduce the need for such curtailment or downward redispatching in the future. Curtailment or redispatching of generating installations using renewable energy sources or highefficiency cogeneration shall be subject to compensation pursuant to paragraph 6.

  • 217. 
    (a) the level of development and effectiveness of market-based

    curtailment or redispatching mechanisms for generation and demand facilities;

ANNEX I TREE.2.B EN

  • 218. 
    (b) the reasons, volumes in MWh and type of generation source

    subject to curtailment or downward redispatching;

  • 219. 
    (c) the measures taken to reduce the need for the curtailment or

    downward redispatching of generating installations using renewable energy sources or highefficiency cogeneration in the future including investments in digitalisation of the grid infrastructure and in services that increase flexibility;

  • 220. 
    (d) requests and contractual arrangements made with

    generating units for them to operate at a certain level of electricity infeed, the necessity of which the system operators shall justify,, specifying to what extent those services could not be provided by other units.

  • 221. 
    The competent regulatory authority shall publish the data referred to in paragraphs (a) to (d) together with recommendations for improvement where necessary.

ANNEX I TREE.2.B EN

  • 222. 
    Curtailment or redispatching of generating installations using

    renewable energy sources or highefficiency cogeneration shall be subject to compensation pursuant to paragraph 6.

  • 223. 
    4. Subject to requirements 4. Subject to requirements relating to the maintenance of relating to the maintenance of the reliability and safety of the the reliability and safety of the grid, based on transparent and grid, based on transparent and non-discriminatory criteria non-discriminatory criteria

    defined by the competent defined by the competent national authorities, national authorities, transmission transmission system operators system operators and and distribution system distribution system operators operators shall: shall:

  • 224. 
    (a) guarantee the capability AM 57 (a) guarantee the capability of

    of transmission and distribution (a) guarantee the capability of transmission and distribution networks to transmit electricity transmission and distribution networks to transmit electricity produced from renewable networks to transmit electricity produced from renewable energy energy sources or highproduced from renewable energy sources or high-efficiency efficiency cogeneration with sources, energy storage, demandcogeneration with minimum minimum possible curtailment response or high-efficiency possible [ ] redispatching. That or redispatching. That shall not cogeneration with minimum shall not prevent network prevent network planning from possible curtailment or planning from taking into taking into account limited redispatching. That shall not account limited [ ] redispatching curtailment or redispatching prevent network planning from where this is shown to be more where this is shown to be more taking into account limited economically efficient and, [ ] economically efficient and does curtailment or redispatching where does not exceed 5 % of [ ] the not exceed 5 % of installed they can demonstrate in a annual generated electricity in capacities using renewable transparent way that this is more installations using renewable energy sources or higheconomically efficient and does not energy sources [ ] and which efficiency cogeneration in their exceed 5 % of installed capacities are directly connected to their area; using renewable energy sources, respective grid, unless energy storage, demand-response otherwise provided by a or high-efficiency cogeneration in Member State in which their area; electricity from power

ANNEX I TREE.2.B EN

generating facility using renewable energy sources or high-efficiency cogeneration represents more than 50 % of annual gross final consumption of electricity;

  • 225. 
    (b) take appropriate grid and

    market-related operational (b) take appropriate grid and measures in order to minimise market-related operational the curtailment or downward measures in order to minimise redispatching of electricity the [ ] downward redispatching produced from renewable of electricity produced from energy sources or highrenewable energy sources or efficiency cogeneration. high-efficiency cogeneration.

  • 226. 
    AM 58

    Article 12 – paragraph 4 – point b (new)

    (ba) ensure that their networks are sufficiently flexible such that they are in a position to manage them.

  • 227. 
    5. Where non-market-based 5. Where non-market-based downward redispatching or downward redispatching [ ] is curtailment is used, the used, the following principles

    following principles shall shall apply: apply:

ANNEX I TREE.2.B EN

  • 228. 
    (a) generating installations AM 59 (a) [ ] power generating using renewable energy sources (a) generating installations using facilities using renewable shall only be subject to renewable energy sources shall energy sources shall only be downward redispatching or only be subject to downward subject to downward

    curtailment if no other redispatching or curtailment if no redispatching [ ]if no other alternative exists or if other other alternative exists or if other alternative exists or if other solutions would result in solutions would result in solutions would result in disproportionate costs or risks significantly disproportionate costs disproportionate costs or severe to network security; or significant risks to network risks to network security; security;

  • 229. 
    (b) generating installations AM 60 (b) electricity generated in a [ using high-efficiency (b) electricity generated in a ] high-efficiency cogeneration cogeneration shall only be high-efficiency cogeneration process shall only be subject to subject to downward process shall only be subject to downward redispatching [ ] if, redispatching or curtailment if, downward redispatching or other than [ ] downward other than curtailment or curtailment if, other than redispatching of [ ] power downward redispatching of curtailment or downward generating facilities using generating installations using redispatching of generating renewable energy sources, no renewable energy sources, no installations using renewable other alternative exists or if other alternative exists or if energy sources, no other alternative other solutions would result in other solutions would result in exists or if other solutions would disproportionate costs or severe disproportionate costs or risks result in disproportionate costs or risks to network security;

    to network security; risks to network security;

ANNEX I TREE.2.B EN

  • 230. 
    (c) self-generated electricity [ ] from generating installations

    using renewable energy sources or high-efficiency cogeneration which is not fed into the transmission or distribution network shall not be curtailed unless no other solution would resolve network security issues;

  • 231. 
    (d) downward redispatching (d) downward redispatching [ or curtailment under letters a to ] under letters a [ ] and b [ ] it

    c shall be duly and shall be duly and transparently transparently justified. The justified. The justification shall justification shall be included in be included in the report under the report under paragraph 3. paragraph 3.

  • 232. 
    6. Where non-market based AM 61 6. Where non-market based [ curtailment or redispatching is 6. Where non-market based ] redispatching is used, it shall

    used, it shall be subject to curtailment or redispatching is be subject to financial financial compensation by the used, it shall be subject to financial compensation by the system system operator requesting the compensation by the system operator requesting the [ ] curtailment or redispatching to operator requesting the curtailment redispatching to the [ ] the owner of the curtailed or or redispatching to the owner of the operator of the [ ] redispatched redispatched generation or curtailed or redispatched generation or demand facility demand facility. Financial generation, energy storage or except in the case of compensation shall at least be demand facility. Financial generators accepting equal to the highest of the compensation shall at least be connection agreement in which following elements: equal to the highest of the firm delivery of energy is not following elements: guaranteed. Financial compensation at least be equal to the highest of the following elements or a combination of them if applying one of the elements would lead to an unjustifiably low or unjustifiably high compensation:

ANNEX I TREE.2.B EN

  • 233. 
    (a) additional operating cost (a) additional operating cost caused by the curtailment or caused by the [ ] redispatching, redispatching, such as such as additional fuel costs in additional fuel costs in case of case of upward redispatching, or upward redispatching, or backup heat provision in case of backup heat provision in case of downward redispatching or downward redispatching or curtailment of [ ] power curtailment of generating generating facility using highinstallations using highefficiency cogeneration;

    efficiency cogeneration; 234. (b) 90 % of the net revenues AM 62 (b) [ ] Net revenues from the

    from the sale of electricity on (b) [ ] net revenues from the sale of electricity on the daythe day-ahead market that the sale of electricity on the day-ahead ahead market that the generating generating or demand facility market that the generating or or demand facility would have would have generated without demand facility would have generated without the [ ] the curtailment or redispatching generated without the redispatching redispatching request. Where request. Where financial request, including lost financial financial support is granted to support is granted to generating support where financial support is generating or demand facilities or demand facilities based on granted to generating or demand based on the electricity volume the electricity volume generated facilities based on the electricity generated or consumed, lost or consumed, lost financial volume generated or consumed [ ] . financial support shall be support shall be deemed part of deemed part of the net revenues. the net revenues.

ANNEX I TREE.2.B EN

  • 235. 
    Chapter III

    Network access and congestion management 236. S ECTION 1

    C APACITY ALLOCATION

  • 237. 
    Article 13 Article 13 Compromise proposal: to divide article 13,

    Definition of bidding zones Measures to address congestion into 13 and 13a. Due to changing of and definition of bidding zones structure and shifting parts of paragraphs please note that the comparison with first three columns may not be exact and/or possible. A consolidated version of 13 and 13a can be found in Annex II.

    Article 13 Bidding Zone Review Article 13a Action plans

  • 238. 
    1. Bidding zone borders AM 63 1. Member States shall Compromise proposal: shall be based on long-term, 1. The configuration of take all appropriate measures Following adoption this will be paragraph 1 structural congestions in the bidding zones in the Union shall to address congestions. Bidding of Article 13:

    transmission network and be designed in such a way as to zone borders shall be based on 1. Member States shall take all bidding zones shall not contain ensure liquidity of day-ahead and long-term, structural congestions appropriate measures to address such congestions. The intraday markets, and thus to in the transmission network [ ]. congestions. Bidding zone borders shall be configuration of bidding zones maximise economic efficiency and Bidding zones shall not based on long-term, structural congestions in in the Union shall be designed cross-border trading opportunities contain such structural the transmission network [ ]. Bidding zones in such a way as to maximise while maintaining security of congestions unless they have shall not contain such structural economic efficiency and crosssupply. Bidding zone borders shall no impact, or their impact on congestions unless they have no impact, or border trading opportunities be based on long-term, structural neighbouring bidding zones is their impact on neighbouring bidding while maintaining security of congestions in the transmission mitigated through the use of zones is mitigated through the use of supply. network and bidding zones shall remedial actions and they do remedial actions and they do not lead to not contain such congestions not lead to reductions of cross reductions of cross zonal trading capacity unless they have no impact on zonal trading capacity. The in accordance with the requirements of neighbouring bidding zones, or configuration of the bidding Art 14. The configuration of the bidding their impact is mitigated by zones in the Union shall be zones in the Union shall be designed in such remedial actions. designed in such a way as to a way as to maximise economic efficiency maximise economic efficiency and in order to maximise cross-border and in order to maximise crosstrading opportunities, while maintaining border trading opportunities, [ ] security of supply with due respect to the

ANNEX I TREE.2.B EN

with due respect to the provisions in Article 14. provisions in Article 14.

  • 239. 
    2. Each bidding zone should AM 64 [ ] Compromise proposal: be equal to an imbalance price 2. Each bidding zone should be [ ]

    area. equal to an imbalance price area, (covered in line 152) except where an imbalance price

    area may constitute a part of a bidding zone.

239a. Compromise proposal:

Following adoption this will be paragraph 2 of Article 13: 2. Every three years, the ENTSO for Electricity shall report on structural congestion and other major physical congestion between and within bidding zones, including location and frequency of such congestion in accordance with the capacity allocation and congestion management guideline adopted on the basis of Article 18 of Regulation (EU) 714/2009 and an assessment of whether the cross-zonal trade capacity reached the minimum threshold pursuant to Article 14.

  • 240. 
    3. In order to ensure an AM 65 3. In order to ensure an Compromise proposal: optimal bidding zone definition 3. In order to ensure an optimal optimal bidding zone [ ] Following adoption this will be paragraph 3 in closely interconnected areas, bidding zone definition in closely configuration [ ] a bidding of Article 13:

    a bidding zone review shall be interconnected areas, a bidding zone review shall be carried out. carried out. That review shall zone review shall be carried out. That review shall identify all 3. In order to ensure an optimal bidding include analysis of the That review shall include analysis structural congestion and zone [ ] configuration [ ] a bidding zone configuration of bidding zones of the configuration of bidding include analysis of [ ] different review shall be carried out. That review shall in a coordinated manner with zones in a coordinated manner with configurations of bidding zones identify all structural congestion and the involvement of affected the involvement of affected in a coordinated manner with the include analysis of [ ] different stakeholders from all affected stakeholders from all affected involvement of affected configurations of bidding zones in a Member States, following the Member States, following the stakeholders from all [ ] coordinated manner with the involvement of

ANNEX I TREE.2.B EN

process in accordance with process in accordance with Articles relevant Member States, affected stakeholders from all [ ] relevant Articles 32 to 34 of Regulation 32 to 34 of Regulation (EU) following the process in Member States, following the process in (EU) 2015/1222. The Agency 2015/1222. Current bidding zones accordance with [ ] the accordance with [ ] the capacity allocation shall approve and may request shall be assessed based on their capacity allocation and and congestion management guideline amendments to the ability to create a reliable market congestion management adopted on the basis of Article 18 of methodology and assumptions environment, ensure sufficient guideline adopted on the basis Regulation (EU) 714/2009 i. Current bidding that will be used in the bidding flexible generation and load of Article 18 of Regulation zones shall be assessed based on their zone review process as well as capacity, which is crucial for (EU) 714/2009. All relevant ability to create a reliable market the alternative bidding zone avoiding grid bottlenecks, transmission system operators environment, ensure sufficient including configurations considered. balancing electricity demand and shall submit a proposal to the for flexible generation and load capacity, supply securing the long-term relevant national regulatory which is crucial for avoiding grid security of investments and the authorities for approval. The bottlenecks, balancing electricity demand grid. The Agency shall approve relevant national regulatory and supply, securing the long-term security and may request amendments to authorities shall come to an of investments and the grid in network the methodology and assumptions unanimous decision on the infrastructure. that will be used in the bidding proposal within [3 month]. In zone review process as well as the case they do not agree within (ex part of line 242) In this article and in alternative bidding zone this time frame, the Agency article 13a, relevant Member States, configurations considered. The shall [ ] decide on the transmission system operators or national methodology shall take due methodology and assumptions regulatory authorities refer to those account of infrastructure that will be used in the bidding Member States, transmission system development projects that are zone review process as well as operators or national regulatory expected to be realised within the the alternative bidding zone authorities participating in the review of next 5 years. configurations considered. The the bidding zone configuration and also methodology shall be based on those in the same capacity calculation structural congestions which region pursuant to the capacity allocation are not expected to be and congestion management guideline overcome within the next five adopted on the basis of Article 18 of years, for example taking due Regulation (EU) 714/2009 i. account of tangible progress on infrastructure development projects, that are expected to be realised within the next five years.

ANNEX I TREE.2.B EN

240a. Compromise proposal:

Following adoption this will be paragraph 4 of Article 13: (based on para 3 Council) (ex part of line 240) All relevant transmission system operators shall submit a proposal for the methodology and assumptions that will be used in the review process as well as the alternative bidding zone configurations considered to the relevant national regulatory authorities for approval. The relevant national regulatory authorities shall come to a unanimous decision on the proposal within [3 months]. In case they do not agree within this time frame, the Agency shall [ ] decide on the methodology and assumptions [ ] as well as the alternative bidding zone configurations considered. The methodology shall be based on structural congestions which are not expected to be overcome within the next five years, [for example] taking due account of tangible progress on infrastructure development projects, that are expected to be realised within the next five years.

  • 241. 
    3a. Irrespective of the Compromise proposal: concrete outcome of the [ ]

    infrastructure development projects, Article 14 shall apply to the calculation of the available capacity for crosszonal exchanges. Where an action plan is implemented pursuant to paragraph 4a, the threshold referred to in Article 14(7) shall be reached not later than end of 2025.

ANNEX I TREE.2.B EN

  • 242. 
    4. The transmission system AM 66 4. The transmission system Compromise proposal: operators participating in the 4. The transmission system operators participating in the Partially incorporated in second part of bidding zone review shall operators participating in the bidding zone review shall paragraph 3 above.

    submit a proposal to the bidding zone review shall submit a submit a joint proposal to the Commission regarding whether proposal to the relevant Member [ ] relevant Member States or Following adoption this will be paragraph 5 to amend or maintain the States whether to amend or designated competent of Article 13: bidding zone configuration. maintain the bidding zone authorities of the relevant Based on that proposal, the configuration. The relevant Member States [no later than 4. Based on the methodology and Commission shall adopt a Member States shall be those 12 months after entry into force assumptions approved pursuant to decision whether to amend or participating in the review of this Regulation, specific date paragraph 3, the transmission system maintain the bidding zone pursuant to Article 32(2) of to be inserted by OJ]. In this operators participating in the bidding zone configuration, [no later than 6 Regulation (EU) 2015/1222 and article, relevant Member review shall submit a joint proposal to the [ months after entry into force of those in the same Capacity States refer to those Member ] relevant Member States or designated this Regulation, specific date to Calculation Region(s) pursuant to States participating in the competent authorities of the relevant be inserted by OP] or by six Regulation (EU) 2015/1222. Based review of the bidding zone Member States whether to amend or months after the conclusion of on the proposal, the relevant configuration and also those in maintain the bidding zone configuration the bidding zone configuration Member States shall come to a the same capacity calculation no later than 12 months after [entry into launched in accordance with unanimous decision within six region pursuant to the force of this Regulation, specific date to be points (a), (b) or (c) of Article months on whether to amend or capacity allocation and inserted by OJ]. Other Member States, 32(1) of Regulation (EU) maintain the bidding zone congestion management Energy Community Contracting Parties or 2015/1222, whichever comes configuration. Other Member guideline adopted on the basis other third countries sharing the same later. States, Energy Community of Article 18 of Regulation synchronous area with any Member State Contracting Parties or other third (EU) 714/2009. may submit comments. countries sharing the same synchronous area with any Member State may submit comments. The decision shall be reasoned, in accordance with relevant Union law and shall take account of any observations of other Member States, Energy Community Contracting Parties and other third countries sharing the same synchronous area with any Member State, as well as of

ANNEX I TREE.2.B EN

commitments on addressing existing congestion made by the relevant Member States. The relevant Member States shall notify the Commission and the Agency of their decision and any cross-border agreements entered into by the Member States, the regulatory authorities or the transmission system operators for the purpose of achieving consensus. Agreements entered into by the relevant Member States shall not deviate from coordinated capacity calculation processes as set out in Article 14 of this Regulation nor from the relevant provisions of Regulation (EU) 2015/1222.

  • 243. 
    AM 67 Compromise proposal:

Article 13 – paragraph 4 a(new) [ ]

4 a. Where the relevant Member States fail to come to a unanimous decision within the deadline referred to in paragraph 4, or where the Member States become aware of the fact that commitments on which a previous unanimous decision was based were not complied with, they shall immediately notify the Commission.

ANNEX I TREE.2.B EN

  • 244. 
    The Commission shall initiate a Compromise proposal: conciliation procedure and shall [ ]

    act as a mediator between the relevant Member States. In the conciliation procedure, the relevant Member States shall, within six months of such initiation, adopt a unanimous decision on whether to amend or maintain the bidding zone configuration.

  • 245. 
    Where the relevant Member States Compromise proposal: in the conciliation fail to adopt a [ ]

    unanimous decision within six months, the Member State with the internal structural congestion shall have the choice to either amend its bidding zone or establish a roadmap with concrete measures on how to overcome the congestions in its national territory in due time. That Member State shall immediately notify its choice to the Commission.

  • 246. 
    For those Member States that

    choose to amend their bidding zones, the Commission shall adopt a decision within six months of that notification, after a thorough evaluation of all the issues at stake, together with an assessment of all available solutions.

ANNEX I TREE.2.B EN

  • 247. 
    4a. Where structural Compromise proposal: congestion has been identified Following adoption this will be paragraph 6 by one or more transmission of Article 13:

    system operator or where the Where structural congestion has been bidding zone review identified in the report pursuant to recommends a bidding zone paragraph 2 or by one or more change of one or more transmission system operators in their Member States, the concerned control areas in a report approved by the Member States in cooperation relevant national regulatory authorities by with their transmission system one or more transmission system operator operators have the possibility, or where the bidding zone review within 6 months, to define recommends a bidding zone change of one action plans, national or or more Member States, the concerned multinational. Member States in cooperation with their transmission system operators have the possibility shall decide, within 6 months, to either define national or multinational action plans, national or multinational pursuant to Art 13a, or to review their bidding zone configuration. The decision shall be immediately notified to the Commission and the Agency.

    Compromise proposal: Following adoption this will be paragraph 1 of Article 13a:

    Following a decision pursuant to Article 13(6), Member States shall develop action plans in cooperation with national

    These action plans shall regulatory authorities. These action plans contain a concrete timetable shall contain a concrete timetable for for adopting measures to adopting measures to reduce the reduce the structural structural congestions identified within congestions identified within the period of [no later than [4] years after

ANNEX I TREE.2.B EN

the period of [no later than [4] entry into force of this Regulation, specific years after entry into force of date to be inserted by OJ] [ ] this Regulation, specific date to be inserted by OJ], including for example acceleration of network development, more efficient use of existing infrastructure, a review of current system operation practices, increased coordination of system operation with relevant neighbouring transmission system operators, review of regulation regarding remedial actions and barriers to increased flexibility and national energy policy measures that shift the location of production and consumption.

  • 248. 
    4b. Member State Compromise proposal: implementing the actions plans Following adoption this will be paragraph 2 pursuant to paragraph 4a of Article 13a:

    shall ensure that without Irrespective of the concrete progress of prejudice to derogations under the action plan, Member States [ ] shall Articles 14(7a) and 14(7b), the ensure that without prejudice to the level of allocated capacity set derogation under Article [ ] 14 (7b), the out in Article 14(7) is achieved cross-border trade capacities are in the last year of the action increased every year up to the benchmark plan, and in no case later than level [ ] calculated in accordance with end of 2025, the minimum Article 14 (7), which is to be achieved by allocated capacity. Member the end of 2025. The yearly increase shall States shall achieve the be achieved by means of a linear capacity referred to in this trajectory. The starting of this trajectory

ANNEX I TREE.2.B EN

paragraph by means of a shall be either the capacity allocated at this linear trajectory. This linear border in the year before adoption of the trajectory and the starting of roadmap or the average of the three last this trajectory, which shall be years before the adoption of the roadmap, either the capacity allocated at whatever is higher. This linear trajectory [ this border in the year before ] shall be agreed with the Member States implementation of the action of the same capacity calculation region. plan or the average of the For the period when a Member State is three last years before the implementing an action plan, the Member action plan, whatever is State shall ensure that the capacity made higher, shall be agreed with available for cross-zonal trade to be the Member States of the same compliant with Article 14 (7) is at least capacity calculation region. equal to the values of the trajectory, For the period when a including by use of remedial actions in the Member State is implementing capacity calculation region but the an action plan, the Member decisions of the regulatory authorities State shall ensure that the referred to in paragraphs 7a and 7b of capacity made available for article 14 are not applicable to such a cross-zonal trade to be Member State. compliant with paragraph 7 is at least equal to the values of the trajectory, including by use of remedial actions in the capacity calculation region, but the decisions of the regulatory authorities referred to in paragraphs 7a and 7b are

not applicable to such a Compromise proposal: Member State. Costs of Following adoption this will be paragraph 3 remedial actions required to of Article 13a: follow the trajectory or make Costs of remedial actions required to available cross-zonal capacity follow the trajectory or make available at the borders concerned by cross-zonal capacity at the borders the action plan shall be borne concerned by the action plan shall be

by the Member State or borne by the Member State or Member States implementing the action plan.

ANNEX I TREE.2.B EN

Member States implementing the action plan.

  • 249. 
    4c. Six months before the Compromise proposal: expiry of the action plan, Following adoption this will be paragraph 6 Member States shall decide of Article 13a:

    whether to split their bidding Six months before the expiry of the action zone to address remaining plan, Member States shall decide whether congestions or whether to to amend their bidding zone to address address remaining internal remaining congestions or whether to congestions with remedial address remaining internal congestions actions for which they shall with remedial actions for which they shall cover the costs. Yearly, during cover the costs. the implementation of the action plan and within six months after the expiry of the action plan, the transmission system operators participating in the bidding zone review shall assess the available crosszonal capacity calculated in accordance with the methodology referred to in Article 14(7) for the period of the last 12 months, and determine in a report whether the cross-border trade Compromise proposal: capacity reached the minimum Following adoption this will be paragraph 7 level outlined in Article 14(7). of Article 13a: Where a structural congestion Where a structural congestion has been has been identified pursuant to identified pursuant to paragraph 4 but no paragraph 4a but no action action plan was defined within 6 months, plan was defined within 6 the relevant transmission system months, the relevant operators shall within twelve months after transmission system operators a structural congestion has been identified shall within twelve months assess [ ] whether the available cross

ANNEX I TREE.2.B EN

after a structural congestion border capacity has reached the minimum has been identified assess the level outlined in Article 14(7) for the available cross-zonal capacity period of the last 12 months and report to calculated in accordance with relevant national regulatory authorities and the methodology referred to in the Agency. For those Member States for Article 14(7) for the period of which the assessment demonstrates that a the last 12 months, and transmission system operator has not been determine in a report whether compliant with the minimum level, the cross-border trade paragraph 5 applies. capacity reached its minimum level outlined in Article 14(7). The assessments under this paragraph shall be continuously reiterated every 24 months for the period of the last 24 months.

  • 250. 
    4d. For those Member Compromise proposal:

    States for which the Following adoption this will be paragraph 5 assessment following of Article 13a: paragraph 4c demonstrates For those Member States for which the that a transmission system assessment following paragraph 4 operator has not been demonstrates that a transmission system compliant with the level operator has not been compliant with the outlined in Article 14(7) or for level outlined in Article 14(7) linear those Member States that have trajectory [ ] the relevant Member States opted for a bidding zone split, shall come to a unanimous decision within the relevant Member States 6 months from receiving the assessment shall come to a unanimous referred in paragraph 4 on whether to decision within 6 months from maintain or amend the bidding zone receiving the report referred configuration. Other Member States may in paragraph 4c on whether to submit comments to the relevant Member maintain or amend the States who should take account of these bidding zone configuration. comments when coming to their decision. Other Member States may The decision shall be justified and shall submit comments to the notified to the Commission and the

ANNEX I TREE.2.B EN

relevant Member States who Agency. Should the relevant Member should take account of these States fail to come to a unanimous comments when coming to decision within the allowed timeframe, their decision. The decision they shall immediately notify the shall be justified, and shall Commission. [The Commission may make notified to the Commission further proposals and may invite the and the Agency. relevant Member States for consultation aiming at fostering a balanced solution within three months.] As a measure of last resort, the Commission after consultation with the Agency and the relevant stakeholders shall adopt a decision whether to amend or maintain the bidding zone configuration in and between those Member States [ ], by six months after receiving of such a notification. [ ]

  • 251. 
    4e. Should the relevant Compromise proposal:

    Member States fail to come to Following adoption this will be paragraph 7 an unanimous decision within of Article 13: the allowed timeframe, they For those Member States for which the shall immediately notify the assessment following paragraph 4c Commission. The Commission demonstrates that a transmission system may make further proposals operator has not been compliant with the and may invite the relevant level outlined in Article 14(7) or for For Member States for those Member States that have opted for a consultation aiming at proposal to amend the bidding zone fostering a balanced solution configuration split, the relevant Member within three months. As a States shall come to a unanimous decision measure of last resort, the within 6 months after the notification Commission after consultation pursuant to paragraph 4 from receiving with the Agency and the the report referred in paragraph 4c on relevant stakeholders shall whether to maintain or amend the bidding adopt a decision whether to zone configuration. Other Member States amend or maintain the may submit comments to the relevant bidding zone configuration in Member States who should take account

ANNEX I TREE.2.B EN

and between those Member of these comments when coming to their States that are subject to the decision. The decision shall be justified decision according to and notified to the Commission and the paragraph 4d, by six months Agency. (ex 4e) Should the relevant after receiving of such a Member States fail to come to a notification. unanimous decision within the allowed timeframe, they shall immediately notify the Commission. [The Commission may make further proposals and may invite the relevant Member States for consultation aiming at fostering a balanced solution within three months.] As a measure of last resort, the Commission after consultation with the Agency and the relevant stakeholders shall adopt a decision whether to amend or maintain the bidding zone configuration in and between those Member States that are subject to the decision according to paragraph 4d, by six months after receiving such a notification.

ANNEX I TREE.2.B EN

  • 252. 
    4f. In case one of the Compromise proposal: consecutive reassessments [ ]

    referred to in paragraph 4c demonstrates that a transmission system operator has not been compliant with the provisions from Article 14(7c) the procedure under paragraphs 4d and 4e shall apply.

  • 253. 
    5. The decision referred to AM 68 5. The decision referred to in Compromise proposal: in paragraph 4 shall be based on 5. Where the relevant Member paragraph 4d or 4e shall be Following adoption this will be paragraph 6 the result of the bidding zone State chooses to establish a based on the report identifying of Article 13a:

    review and the transmission detailed road map with concrete structural congestion or the Six months before the expiry of the action system operators' proposal milestones on how the congestion result of the bidding zone review plan, Member States shall decide whether concerning its maintenance or issues will be resolved, that and the transmission system to amend their bidding zone to address amendment. The decision shall Member State shall, within six operators' proposal in remaining congestions or whether to be justified, in particular as months of the Commission paragraph 4a and the report address remaining internal congestions regards possible deviations decision, present that roadmap to in paragraph 4c concerning its with remedial actions for which they shall from the result of the bidding the Commission and other maintenance or amendment [ ]. cover the costs. zone review. relevant Member States. During The decision shall be justified, the implementation of the in particular as regards possible roadmap the relevant Member deviations from the result of the State shall regularly report to the bidding zone review and shall Commission on the progress take account of the positions made. and commitments of the concerned Member States and the comments provided by other Member States.

ANNEX I TREE.2.B EN

  • 254. 
    Irrespective of the concrete Compromise proposal: progress of the roadmap, the [ ]

    Member State that is (covered in line 248) implementing a roadmap shall ensure that the cross-border trade capacities are increased every year up to the benchmark level of at least 75% calculated in accordance with Article 14 paragraph 7, which is to be achieved by the end of 2025. The yearly increase shall be achieved by means of a linear trajectory.

  • 255. 
    The starting of this trajectory shall Compromise proposal: be either the capacity allocated at [ ]

    this border in the year before (covered in line 248) adoption of the roadmap or the average of the three last years before the adoption of the roadmap, whatever is higher.

  • 256. 
    Member States shall be considered Compromise proposal: to be in compliance with Article 14 [ ]

    paragraph 7 if the capacity made (covered in line 248) available for cross-zonal trade is at least equal to the values of the linear trajectory.

ANNEX I TREE.2.B EN

  • 257. 
    AM 69 Compromise proposal:

    Article 13 – paragraph 5 a (new) Following adoption this will be paragraph 4 of Article 13a:

    5a. The relevant transmission Yearly during the implementation of the system operators and national action plan and within six months after regulatory authorities shall assess the expiry of the action plan, the relevant yearly whether the available crosstransmission system operators border capacity has reached the participating in the bidding zone review linear trajectory or, as of the end shall [ ] assess whether the available of 2025, the minimum level cross-border capacity has reached the outlined in Article 14(7). linear trajectory or, as of the end of 2025, the minimum level outlined in Article 14 (7) for the period of the last 12 months [ ] and report to relevant national regulatory authorities and the Agency. [This assessment [ ] shall be continuously reiterated every 24 months for the period of the last 24 months.]

  • 258. 
    AM 70 Compromise proposal:

Article 13 – paragraph 5 b (new) [ ]

5b. For those Member States for which the assessment referred to in paragraph 5a demonstrates that a transmission system operator has not been compliant with the linear trajectory, or as of the end of 2025, with the level outlined in Article 14 (7), the Commission may recommend additional measures and as a measure of last resort, adopt a decision whether to amend or maintain the bidding zone configuration in and between those Member States.

ANNEX I TREE.2.B EN

  • 259. 
    6. Where further bidding AM 71 6. Where further bidding Compromise proposal: zone reviews are launched deleted zone reviews are launched under Following adoption this will be paragraph under Article 32(1)(a), (b) or [ ] the capacity allocation and 10 of Article 13:

    (c) of Regulation (EU) congestion management Where further bidding zone reviews are 2015/1222, the Commission guideline adopted on the basis launched under [ ] the capacity allocation may adopt a decision within six of Article 18 of Regulation and congestion management guideline months of the conclusion of that (EU) 714/2009 the procedure adopted on the basis of Article 18 of bidding zone review. outlined in this Article shall be Regulation (EU) 714/2009 i this Article followed. shall apply. the procedure outlined in this Article shall be followed.

  • 260. 
    7. The Commission shall AM 72 [ ] Compromise proposal: consult relevant stakeholders on 7. Member States and the Following adoption this will be paragraph 8 its decisions under this Article Commission shall consult relevant of Article 13:

    before they are adopted. stakeholders before adopting a Member States and the Commission shall decision under this Article. consult relevant stakeholders before

    adopting a decision under this Article.

  • 261. 
    8. The Commission AM 73 8. [ ] Any decision adopted Compromise proposal: decision shall specify the date 8. The decision adopted under according to this Article shall Following adoption this will be paragraph 9 of implementation of a change. this Article shall specify the date of specify the date of of Article 13:

    That implementation date shall implementation of a change. That implementation of a change. 8. [ ] Any decision adopted according to balance the need for expediency implementation date shall balance That implementation date shall this Article shall specify the date of with practical considerations, the need for expediency with balance the need for expediency implementation of a change. That including forward trade of practical considerations, including with practical considerations, implementation date shall balance the need electricity. The Commission forward trade of electricity. including forward trade of for expediency with practical considerations, may define appropriate Appropriate transitional electricity and shall not be less including forward trade of electricity and transitional arrangements as arrangements may be defined as than 12 months after the shall not be less than 12 months after the part of its decision. part of the decision. decision is published unless decision is published unless otherwise otherwise agreed with the agreed with the relevant Member States. relevant Member States. The [ The [ ] decision may define appropriate ] decision may define transitional arrangements [ ]. appropriate transitional arrangements [ ].

ANNEX I TREE.2.B EN

  • 262. 
    AM 74 Compromise proposal:

    Article 13 – paragraph 8 a (new) [ ] 8a. Where further bidding zone (covered by line 259) reviews are launched under point (a), (b) or (c) of Article 32(1) of Regulation (EU) 2015/1222, paragraphs 4 to 8 of this Article shall apply.

  • 263. 
    Article 14

    General principles of capacity allocation and congestion management

  • 264. 
    1. Network congestion

    problems shall be addressed 1. Network congestion

    Maintain General Approach

    with non-discriminatory problems shall be addressed

    (no agreement on the reference to the

    market-based solutions which with non-discriminatory market

    Guideline)

    give efficient economic signals based solutions which give to the market participants and efficient economic signals to the transmission system operators market participants and involved. Network congestion transmission system operators problems shall be solved with involved. Network congestion non-transaction based methods, problems shall be solved with i.e. methods that do not involve non-transaction based methods, a selection between the i.e. methods that do not involve contracts of individual market a selection between the contracts participants. When taking of individual market operational measures to ensure participants. When taking that its transmission system operational measures to ensure remains in the normal state, the that its transmission system transmission system operator remains in the normal state, the shall take into account the transmission system operator effect of those measures on shall take into account the effect neighbouring control areas and of those measures on coordinate such measures with neighbouring control areas and other affected transmission coordinate such measures with system operators as provided other affected transmission for in Regulation (EU) system operators [as provided 1222/2015. for in [ ] the capacity

ANNEX I TREE.2.B EN

allocation and congestion management guideline adopted on the basis of Article 18 of Regulation (EU) 714/2009].

  • 265. 
    2. Transaction curtailment 2. Transaction curtailment No change procedures shall only be used in procedures shall only be used in 2. Transaction curtailment procedures emergency situations where the emergency situations where the shall only be used in emergency situations transmission system operator transmission system operator where the transmission system operator must must act in an expeditious must act in an expeditious act in an expeditious manner and remanner and re-dispatching or manner and re-dispatching or dispatching or countertrading is not possible. countertrading is not possible. countertrading is not possible. Any such procedure shall be applied in a Any such procedure shall be Any such procedure shall be non-discriminatory manner. Except in cases applied in a non-discriminatory applied in a non-discriminatory of force majeure, market participants who manner. Except in cases of manner. Except in cases of force have been allocated capacity shall be force majeure, market majeure, market participants compensated for any curtailment. participants who have been who have been allocated

    allocated capacity shall be capacity shall be compensated compensated for any for any curtailment. curtailment.

  • 266. 
    2a. Transmission system Council compromise (new text): operators may decide not to

    implement the coordinated 2a. Regional coordination centres shall actions issued by the regional perform coordinated capacity calculation security coordinator of the as provided for in article 34(1)(a) in system operation region, or the accordance with paragraphs 3 and 7 regional security coordinator pursuant to the process set out in Article himself may reduce the 38(1). capacities calculated in the coordinated capacity In this process they shall assess whether calculation in their the outcome of the coordinated capacity coordinated actions where the calculation would result in a violation of outcome of the coordinated operational security limits, for example capacity calculation, carried due to insufficient availability of remedial out pursuant to the capacity actions, taking into account all remedial

ANNEX I TREE.2.B EN

allocation and congestion actions available in the capacity management guideline and calculation region including redispatch paragraphs 3 and 7, would and countertrading, except load shedding. result in a violation of the If this is the case, the regional operational security limits coordination centres may, as a measure of defined by the transmission last resort, set out coordinated actions system operator in accordance reducing the cross-zonal capacities with the System Operation accordingly. Guideline adopted on the basis of Article 18 of Regulation Transmission system operators may only 714/2009, for example in case deviate from coordinated actions in of insufficient redispatch respect of coordinated capacity potential within the capacity calculation and coordinated security calculation region. Such a analysis in accordance with Article 38(2). deviation shall be duly justified by the relevant Every three months, the regional transmission system operators. coordination centres shall report to the The relevant transmission relevant national regulatory authorities system operators shall inform and the Agency on reductions and the Regional Security deviations pursuant to this paragraph and Coordinators and the national shall assess the incidences and make regulatory authorities of the recommendations, if needed, on how to capacity calculation region of avoid such deviations in the future. If the such deviation without undue Agency concludes that the prerequisites delay in accordance with for a deviation pursuant to this paragraph Article 38(2a) of this were not fulfilled or are of a structural Regulation. Once a year, the nature, the Agency shall submit an Regional Security Coordinator opinion to the relevant national regulatory shall report to the relevant authorities and the Commission. The national regulatory authorities relevant national regulatory authorities and the Agency on the shall take appropriate action against deviations pursuant to this transmission system operators or regional paragraph and shall assess the coordination centres pursuant to articles incidences and analyse, if 59 or 62 of the [recast Electricity needed, how to avoid such Directive] if the prerequisites for a

ANNEX I TREE.2.B EN

deviations in the future. If the deviation pursuant to this paragraph were Agency comes to the not fulfilled. conclusion that the prerequisites for a deviation Deviations of a structural nature shall be pursuant to this paragraph taken into account in decisions pursuant were not fulfilled are of a to articles 13(6) and 13a(5), where structural nature, the Agency applicable. shall submit an opinion to the relevant regulatory authority and the Commission. The regulatory authority shall take appropriate action against the transmission system operators if the prerequisites for a deviation pursuant to this paragraph were not fulfilled.

  • 267. 
    3. The maximum capacity AM 75 3. Unless otherwise Council compromise: of the interconnections and/or 3. The maximum capacity of provided in paragraphs 7, 7a, 3. Unless otherwise provided in the transmission networks the interconnections and/or the 7b, 7d and 2a the maximum paragraphs 7, 7a, 7b, 7d and 2a The affecting cross-border flows transmission networks affecting level of capacity of the maximum level of capacity of the shall be made available to cross-border flows shall be made interconnections and/or the interconnections and/or the transmission market participants, complying available to market participants, transmission networks affected networks affected by cross-border [ ] with safety standards of secure complying with safety standards of by cross-border [ ] capacity capacity shall be made available to market network operation. Countersecure network operation. Countershall be made available to participants, complying with safety standards trading and redispatch, trading and redispatch, including market participants, complying of secure network operation. Counter-trading including cross-border cross-border redispatch, shall be with safety standards of secure and redispatch, including cross-border redispatch, shall be used to used to maximise available network operation. Counterredispatch, shall be used to optimize maximise available capacities capacities unless it is demonstrated trading and redispatch, including maximise available capacities to reach the unless it is demonstrated that it that it is not beneficial to economic cross-border redispatch, shall be minimum levels pursuant to paragraph 7 [ is not beneficial to economic efficiency at Union level. used to optimize available ] and a coordinated and nonefficiency at Union level. When allocating cost of remedial capacities [ ] and a discriminatory process for cross-border actions between transmission coordinated and nonremedial actions shall be applied to enable system operators, regulators shall discriminatory process for this, following the implementation of the a analyse to what extent cross-border remedial actions re-dispatching and counter-trading cost unscheduled flows leaving and reshall be applied to enable this, sharing methodology [in accordance with

ANNEX I TREE.2.B EN

entering a bidding zone contribute following the implementation the capacity allocation and congestion to the congestion observed of the re-dispatching and management guideline adopted on the between two bidding zones and countertrading cost sharing basis of Article 18 of Regulation (EU) allocate the counter-trading and methodology in accordance 714/2009]. redispatch costs in proportion to with the capacity allocation their contribution to the and congestion management congestion. guideline adopted on the basis of Article 18 of Regulation (EU) 714/2009.

  • 268. 
    4. Capacity shall be 4. Capacity shall be No change allocated only by means of allocated only by means of 4. Capacity shall be allocated only by explicit capacity auctions or explicit capacity auctions or means of explicit capacity auctions or implicit auctions including both implicit auctions including both implicit auctions including both capacity and capacity and energy. Both capacity and energy. Both energy. Both methods may coexist on the methods may coexist on the methods may coexist on the same interconnection. For intra-day trade same interconnection. For intrasame interconnection. For intracontinuous trading shall be used which may day trade continuous trading day trade continuous trading be complemented by auctions. shall be used, which may be shall be used which may be

    complemented by auctions. complemented by auctions.

ANNEX I TREE.2.B EN

  • 269. 
    5. The highest value bids, 5. In case of congestion, the Maintain General Approach whether implicit or explicit in a valid highest value bids for

    given timeframe, shall be network capacity, whether successful. Other than in the implicit or explicit, offering the case of new interconnectors highest value for the (scarce) which benefit from an transmission capacity in a exemption under Article 7 of given timeframe, shall be Regulation (EC) No 1228/2003 i, successful. Other than in the Article 17 Regulation 714/2009 i case of new interconnectors or Article 59, establishing which benefit from an reserve prices in capacityexemption under Article 7 of allocation methods shall not be Regulation (EC) No 1228/2003 i, allowed. Article 17 Regulation 714/2009 i or Article 59, establishing reserve prices in capacityallocation methods shall not be allowed.

  • 270. 
    6. Capacity shall be freely 6. Capacity shall be freely No change: tradable on a secondary basis, tradable on a secondary basis, 6. Capacity shall be freely tradable on a provided that the transmission provided that the transmission secondary basis, provided that the system operator is informed system operator is informed transmission system operator is informed sufficiently in advance. Where sufficiently in advance. Where a sufficiently in advance. Where a a transmission system operator transmission system operator transmission system operator refuses any refuses any secondary trade refuses any secondary trade secondary trade (transaction), this shall be (transaction), this shall be (transaction), this shall be clearly and transparently communicated and clearly and transparently clearly and transparently explained to all the market participants by communicated and explained to communicated and explained to that transmission system operator and all the market participants by all the market participants by notified to the regulatory authority. that transmission system that transmission system

    operator and notified to the operator and notified to the regulatory authority. regulatory authority.

ANNEX I TREE.2.B EN

  • 271. 
    7. Transmission system AM 76 7. Transmission system Council compromise: operators shall not limit the 7. Transmission system operators shall not limit the 7. Transmission system operators shall not volume of interconnection operators shall not limit the volume volume of interconnection limit the volume of interconnection capacity capacity to be made available to of interconnection capacity to be capacity to be made available to to be made available to [ ] market other market participants in made available to other market [ ] market participants in order participants in order to solve congestion order to solve congestion inside participants in order to solve to solve congestion inside their inside their own bidding zone or as a their own control area or as a congestion inside their own control own bidding zone or as a means of managing flows leaving and remeans of managing flows on a area or as a means of managing means of managing flows entering the same bidding zone without border between two control flows on a border between two leaving and re-entering the being scheduled unless otherwise provided areas observed even without control areas observed even same bidding zone without under paragraph 7a or 7b. any transaction, that is to say without any transaction, that is to being scheduled unless

    flows over control areas caused say flows over control areas caused otherwise provided under by origin and destination within by origin and destination within paragraph 7a or 7b. one control area. one control area.

ANNEX I TREE.2.B EN

  • 272. 
    Without prejudice to the forth Without prejudice to the Council compromise: subparagraph of Article 13(5), this application of the derogations Without prejudice to the application of paragraph shall be considered to under paragraph 7a and 7b, the derogations under paragraphs 27a and be complied with if the following this paragraph shall be 7b and to the application of article 13a(2), minimum levels of available considered to be complied with this paragraph shall be considered to be capacity for cross-zonal trade, if the following minimum complied with if the following minimum which is calculated pursuant to levels of available capacity for levels of available capacity for cross-zonal the capacity allocation and cross-zonal trade, which is trade, which is calculated pursuant to the congestion management guideline calculated pursuant to the capacity allocation and congestion adopted on the basis of Article 18 capacity allocation and management guideline adopted on the of Regulation (EU) 714/2009 i congestion management basis of Article 18 of Regulation (EU) taking account of contingencies, guideline adopted on the basis 714/2009 taking account of N-1 criterion, are reached: of Article 18 of Regulation are reached:

    (EU) 714/2009 taking account of N-1 criterion, are reached:

  • 273. 
    (i) for borders using a (i) For borders using a Council compromise: coordinated net transfer capacity coordinated net transmission (i) For borders using a coordinated net approach, if at least 75 % of the capacity approach, 75% of the transmission capacity approach, the net transfer capacity pursuant to net transfer capacity pursuant minimum level shall be 75% of the net capacity allocation and congestion to capacity allocation and transfer capacity pursuant respecting management guideline are made congestion management operational security limits after deduction available for cross-border trade; guideline adopted on the basis of contingencies and reliability margins, of Article 18 of the Regulation as determined according to the capacity 714/2009; allocation and congestion management

    guideline adopted on the basis of Article 18 of the Regulation 714/2009 i;

  • 274. 
    (ii) for borders using a flow(ii) For borders using a Council compromise: based approach, if on cross-zonal flow-based approach, 75% of (ii) For borders using a flow-based and internal critical network the remaining available approach, the minimum level shall be elements considered in the flowmargin on internal and cross 75% of the remaining available margin based calculation at least 75 % of border critical network capacity respecting operational security the thermal capacity after elements made available for limits of internal and cross-zonal border reduction of the amount required cross border flows pursuant to critical network elements made available to secure the N-1 principle capacity allocation and for cross border flows pursuant after pursuant to the capacity allocation congestion management deduction of reliability margins and

ANNEX I TREE.2.B EN

and congestion management guideline adopted on the basis taking into account contingencies, as guideline is used as an input for of Article 18 of the Regulation determined according to the capacity capacity allocation. 714/2009. allocation and congestion management guideline adopted on the basis of Article 18 of the Regulation 714/2009 i.

  • 275. 
    The derogations pursuant to Council compromise (new text): paragraph 7a shall not result For the purpose of this paragraph the with a value below this reliability margins shall not be higher threshold. than [10]%.
  • 276. 
    7a. Based on a proposal by Provisionally agreed in TM: all transmission system [ ]

    operators of a capacity calculation region , the relevant regulatory authorities by way of derogation from paragraph 7 shall approve the level of total available crosszonal capacity at each bidding zone border, which shall be used in the capacity calculation methodology, to take account of cross-zonal unscheduled flows to the extent that could be expected without structural congestions in a bidding zone.

  • 277. 
    Upon request by a transmission 7b. Upon request by [ ] Council compromise: system operator, the relevant transmission system operators of 7b. Upon request by [ ] transmission system regulatory authority may grant a capacity calculation region [ operators of a capacity calculation region [ a derogation from the first ] the relevant regulatory ] the relevant regulatory authorities may

    subparagraph where it is

    necessary for maintaining authorities may grant a grant a derogation from [ ] paragraph 7 for operational security or where it derogation from [ ] paragraph foreseeable reasons where it is necessary is beneficial to economic 7 for foreseeable reasons where for maintaining operational security [ ] efficiency at Union level. Such it is necessary for maintaining other than the ones covered under

ANNEX I TREE.2.B EN

a derogation, which may not operational security [ ] other paragraph 7a, for instance in case of grid relate to curtailment of already than the ones covered under maintenance measures. Such a derogation, allocated capacities pursuant to paragraph 7a, for instance in which may not relate to curtailment of paragraph 5, shall be limited in case of grid maintenance already allocated capacities pursuant to

time, strictly limited to what is

necessary, and avoid measures. Such a derogation, paragraph 52, shall be limited [ ] to one discrimination between internal which may not relate to year at a time, or up to maximum two and cross-zonal exchanges. curtailment of already allocated years with a significantly decreasing level Before granting a derogation, capacities pursuant to paragraph of the derogation each year, be strictly

the relevant regulatory authority 5, shall be limited [ ] to one limited to what is necessary, and avoid shall consult the regulatory year at a time, or up to discrimination between internal and crossauthorities of other Member maximum two years with a zonal exchanges. Before granting a

States forming part of an significantly decreasing level derogation, the relevant regulatory affected capacity calculation of the derogation each year, be authority shall consult the regulatory region. In case a regulatory strictly limited to what is authorities of other Member States authority disagrees with the necessary, and avoid forming part of an affected capacity proposed derogation, the discrimination between internal calculation region. In case a regulatory Agency shall decide on the and cross-zonal exchanges. [ ] authority disagrees with the proposed derogation pursuant to Article The justification and reasons for derogation, the Agency shall decide on the 6(8)(a) [recast of Regulation the derogation shall be derogation pursuant to Article 6(8)(a)

(EC) No 713/2009 as proposed published. Where a derogation is [recast of Regulation (EC) No 713/2009 i as

by COM(2016) 863 i/2]. The

justification and reasons for the granted, the relevant proposed by COM(2016) 863 i/2]. [ ] The derogation shall be published. transmission system operators justification and reasons for the derogation Where a derogation is granted, shall develop and publish a shall be published. Where a derogation is the relevant transmission methodology and projects [ ] granted, the relevant transmission system system operators shall develop that shall provide a long-term operators shall develop and publish a

and publish a methodology and solution to the issue that the methodology and projects that shall provide projects that shall provide a derogation seeks to address. The a long-term solution to the issue that the long-term solution to the issue derogation shall expire when the derogation seeks to address. The derogation that the derogation seeks to time limit is reached or, once the shall expire when the time limit is reached address. The derogation shall solution is applied, whichever is or, once the solution is applied, whichever is expire when the time limit is earlier. earlier.

reached or, once the solution is applied, whichever is earlier.

ANNEX I TREE.2.B EN

  • 278. 
    8. Market participants shall 8. Market participants shall No change: inform the transmission system inform the transmission system . Market participants shall inform the operators concerned a operators concerned a transmission system operators concerned a reasonable time in advance of reasonable time in advance of reasonable time in advance of the relevant the relevant operational period the relevant operational period operational period whether they intend to use whether they intend to use whether they intend to use allocated capacity. Any allocated capacity allocated capacity. Any allocated capacity. Any that will not be used shall be reattributed to allocated capacity that will not allocated capacity that will not the market, in an open, transparent and nonbe used shall be reattributed to be used shall be reattributed to discriminatory manner. the market, in an open, the market, in an open,

    transparent and nontransparent and nondiscriminatory manner. discriminatory manner.

  • 279. 
    9. Transmission system 9. Transmission system No change: operators shall, as far as operators shall, as far as 9. Transmission system operators shall, technically possible, net the technically possible, net the as far as technically possible, net the capacity requirements of any capacity requirements of any capacity requirements of any power flows in power flows in opposite power flows in opposite opposite direction over the congested direction over the congested direction over the congested interconnection line in order to use that line interconnection line in order to interconnection line in order to to its maximum capacity. Having full regard use that line to its maximum use that line to its maximum to network security, transactions that relieve capacity. Having full regard to capacity. Having full regard to the congestion shall never be denied. network security, transactions network security, transactions

    that relieve the congestion shall that relieve the congestion shall never be denied. never be denied.

  • 280. 
    10. The financial 10. The financial No change: consequences of failure to consequences of failure to 10. The financial consequences of failure honour obligations associated honour obligations associated to honour obligations associated with the with the allocation of capacity with the allocation of capacity allocation of capacity shall be attributed to shall be attributed to those who shall be attributed to those who those who are responsible for such a failure. are responsible for such a are responsible for such a Where market participants fail to use the failure. Where market failure. Where market capacity that they have committed to use, or, participants fail to use the participants fail to use the in the case of explicitly auctioned capacity, capacity that they have capacity that they have fail to trade on a secondary basis or give the committed to use, or, in the committed to use, or, in the case capacity back in due time, they shall lose the case of explicitly auctioned of explicitly auctioned capacity, rights to such capacity and pay a cost

ANNEX I TREE.2.B EN

capacity, fail to trade on a fail to trade on a secondary basis reflective charge. Any cost-reflective charges secondary basis or give the or give the capacity back in due for the non-use of capacity shall be justified capacity back in due time, they time, they shall lose the rights to and proportionate. If a transmission system shall lose the rights to such such capacity and pay a costoperator does not fulfil its obligation, it shall capacity and pay a costreflective charge. Any costbe liable to compensate the market reflective charge. Any costreflective charges for the nonparticipant for the loss of capacity rights. reflective charges for the nonuse of capacity shall be justified Consequential losses shall not be taken into use of capacity shall be justified and proportionate. If a account for that purpose. The key concepts and proportionate. If a transmission system operator and methods for the determination of transmission system operator does not fulfil its obligation, it liabilities that accrue upon failure to honour does not fulfil its obligation, it shall be liable to compensate the obligations shall be set out in advance in shall be liable to compensate market participant for the loss of respect of the financial consequences, and the market participant for the capacity rights. Consequential shall be subject to review by the relevant [ ] loss of capacity rights. losses shall not be taken into regulatory authority or authorities. Consequential losses shall not account for that purpose. The be taken into account for that key concepts and methods for purpose. The key concepts and the determination of liabilities methods for the determination that accrue upon failure to of liabilities that accrue upon honour obligations shall be set failure to honour obligations out in advance in respect of the shall be set out in advance in financial consequences, and respect of the financial shall be subject to review by the consequences, and shall be relevant [ ] regulatory authority subject to review by the or authorities. relevant national regulatory authority or authorities.

ANNEX I TREE.2.B EN

  • 281. 
    11. When allocating costs of Council compromise: remedial actions between 11. When allocating costs of remedial transmission system operators, actions between transmission system regulators shall analyse to operators, regulators national regulatory what extent flows leaving and authorities shall analyse to what extent re-entering a bidding zone flows leaving and re-entering a bidding without being scheduled zone without being scheduled contribute contribute to the congestion to the congestion between two bidding between two bidding zones zones observed, and allocate the costs in observed, and allocate the proportion to the contribution to the costs in proportion to the congestion in line with re-dispatching and contribution to the congestion countertrading cost sharing methodology in line with re-dispatching and in accordance with the capacity allocation countertrading cost sharing and congestion management guideline methodology in accordance adopted on the basis of Article 18 of with the capacity allocation Regulation (EU) 714/2009 i and Article 76 and congestion management of Commission Regulation (EU) guideline adopted on the basis 2017/XYZZ. This shall not apply to the of Article 18 of Regulation threshold pursuant to paragraph 7a , (EU) 714/2009 and Article 76 except for costs induced by flows leaving of Commission Regulation and re-entering a bidding zone without (EU) 2017/XYZZ. This shall being scheduled to the extent that could be not apply to the threshold expected without structural congestion in pursuant to paragraph 7a. a bidding zone.

ANNEX I TREE.2.B EN

  • 282. 
    Article 15

    Allocation of cross-zonal capacity across timeframes

  • 283. 
    1. Transmission system

    operators shall recalculate 1. Transmission system available cross-zonal capacity operators shall recalculate at least after day-ahead and available cross-zonal capacity at after intraday cross-zonal gate least after day-ahead and after closure times. Transmission intraday cross-zonal gate closure system operators shall allocate times. Transmission system the available cross-zonal operators shall allocate the capacity plus any remaining available cross-zonal capacity cross-zonal capacity not plus any remaining cross-zonal previously allocated and any capacity not previously allocated cross-zonal capacity released by and any cross-zonal capacity physical transmission right released by physical holders from previous transmission right holders from allocations in the next crossprevious allocations in the next zonal capacity allocation cross-zonal capacity allocation process. process.

  • 284. 
    1a. Transmission system operators shall define an

    appropriate structure for the allocation of cross-zonal capacity across timeframes, including day-ahead, intraday and balancing. Such an allocation structure shall be subject to review by the respective regulatory authorities. In drawing up their proposal, the TSOs shall take into account:

ANNEX I TREE.2.B EN

  • 285. 
    a) the characteristics of the markets;
  • 286. 
    b) the operational condition, such as the implications of netting firmly declared schedules;
  • 287. 
    c) the level of harmonisation of the percentages and timeframes adopted for the different cross-zonal capacity allocation mechanisms in place.
  • 288. 
    2. When cross-zonal 2. When cross-zonal capacity is available after the capacity is available after the intraday cross-zonal gate intraday cross-zonal gate closure closure time, transmission time, transmission system system operators shall use the operators shall use the crosscross-zonal capacity for the zonal capacity for the exchange exchange of balancing energy of balancing energy or for or for operating the imbalance operating the imbalance netting netting process. process.

ANNEX I TREE.2.B EN

  • 289. 
    3. Transmission system 3. Where cross-zonal operators shall use the capacity is allocated for the methodologies developed in exchange of balancing capacity network codes and guidelines or sharing of reserves

    on balancing, where applicable, pursuant to Article 5(8), to allocate cross-zonal capacity transmission system operators for the exchange of balancing shall use the methodologies capacity or sharing of reserves developed in [ ] accordance pursuant to Article 5(4) and (7). with the balancing guideline adopted on the basis of Article 18 of the Regulation 714/2009 i.

  • 290. 
    4. Transmission system

    operators shall not increase the 4. Transmission system reliability margin calculated operators shall not increase the pursuant to Regulation (EU) reliability margin calculated 2015/1222 due to the exchange pursuant to Regulation (EU) of balancing capacity or sharing 2015/1222 due to the exchange

    of reserves. of balancing capacity or sharing of reserves.

ANNEX I TREE.2.B EN

  • 291. 
    Section 2

    Network charges and congestion income

  • 292. 
    Article 16 AM 77 Article 16

    Charges for access to networks Charges for access to networks, use Charges for connection and of networks and reinforcement access to networks

  • 293. 
    1. Charges applied by AM 78

    network operators for access to 1. Charges applied by network 1. Charges applied by networks, including charges for operators for access to networks , network operators for access to connection to the networks, including charges for connection to networks, including charges for charges for use of networks, the networks, charges for use of connection to the networks, and, where applicable, charges networks, and, where applicable, charges for use of networks, and, for related network charges for related network where applicable, charges for reinforcements, shall be reinforcements, shall be fair, costrelated network reinforcements, transparent, take into account reflective, transparent, take into shall be transparent, take into the need for network security account the need for network account the need for network and flexibility and reflect actual security and flexibility and reflect security and flexibility and costs incurred insofar as they actual costs incurred insofar as they reflect actual costs incurred correspond to those of an correspond to those of an efficient insofar as they correspond to efficient and structurally and structurally comparable those of an efficient and comparable network operator network operator and are applied in structurally comparable network and are applied in a nona non-discriminatory manner. Grid operator and are applied in a discriminatory manner. In tariffs shall not include unrelated non-discriminatory manner. [ ] particular, they shall be applied costs supporting other policy Without prejudice to Article in a way which does not objectives, such as taxes or levies, 15(1) and (6) and the criteria discriminate between as this would distort production, in Annex XI of Directive production connected at the consumption and investment 2012/27/EU the method used distribution level and decisions. In particular, they shall to develop the network production connected at the neutrally support overall system charges shall in particular be transmission level, either efficiency in the long run through applied in a way which does not positively or negatively. They price signals to consumers and discriminate between production shall not discriminate against producers and they shall as far as connected at the distribution energy storage and shall not possible be applied in a way which level and production connected create disincentives for does not discriminate between at the transmission level, either participation in demand production connected at the positively or negatively. They

    response. Without prejudice to distribution level and production shall not unduly discriminate either positively or negatively

ANNEX I TREE.2.B EN

paragraph 3, those charges shall connected at the transmission level, against energy storage and shall not be distance-related. either positively or negatively. not create disincentives for They shall not discriminate against participation in demand energy storage and aggregation response. Without prejudice to and shall not create disincentives paragraph 3, those charges shall for self-generation, selfnot be distance-related. consumption and for participation in demand response. Without prejudice to paragraph 3, those charges shall not be distancerelated.

  • 294. 
    2. Tariffs shall grant AM 79

    appropriate incentives to 2. Tariffs shall grant 2. Tariff methodologies transmission and distribution appropriate incentives to shall [ ] reflect appropriate system operators, over both the transmission and distribution incentives and fixed costs of short and long term, to increase system operators, over both the transmission and distribution efficiencies, including energy short and long term, to increase system operators. The allowed efficiency, foster market efficiencies, including energy revenues to be recovered integration and security of efficiency, foster market through tariffs shall reflect supply, and support investments integration and security of supply, appropriate incentives to and the related research and global competitiveness, and transmission and distribution activities. support efficient investments, in system operators over both the particular in digitalisation, short and long term, to increase flexibility services and efficiencies, including energy interconnections, and the related efficiency, foster market research activities. Tariffs shall integration, [ ] security of not create disincentives for energy supply, and support investments, storage, demand response or self[ ] the related research

    generation production. activities and facilitate innovation in the consumer's

    interest.

ANNEX I TREE.2.B EN

  • 295. 
    3. Where appropriate, the 3. Where appropriate, the level of the tariffs applied to level of the tariffs applied to producers and/or consumers producers and/or consumers shall provide locational signals shall provide locational signals at Union level, and take into at Union level, and take into account the amount of network account the amount of network losses and congestion caused, losses and congestion caused, and investment costs for and investment costs for

    infrastructure. infrastructure. 296. 4. When setting the charges 4. When setting the charges

    for network access, the for network access, the following shall be taken into following shall be taken into account: account:

  • 297. 
    (a) payments and receipts (a) payments and receipts resulting from the interresulting from the intertransmission

    system operator transmission system operator compensation mechanism; compensation mechanism;

  • 298. 
    (b) actual payments made (b) actual payments made and and received as well as received as well as payments

    payments expected for future expected for future periods of periods of time, estimated on time, estimated on the basis of the basis of past periods. past periods.

  • 299. 
    5. Setting the charges for 5. Setting the charges for network access under this network access under this

    Article shall be without Article shall be without prejudice to charges resulting prejudice to charges resulting from congestion management from congestion management referred to in Article 14. referred to in Article 14.

  • 300. 
    6. There shall be no specific

    network charge on individual 6. There shall be no specific transactions for cross-border network charge on individual

    trade of electricity. transactions for cross-[ ] zonal trade of electricity.

ANNEX I TREE.2.B EN

  • 301. 
    7. Distribution tariffs shall AM 80

    reflect the cost of use of the 7. Transmission and 7. Distribution tariffs shall distribution network by system distribution tariffs shall be costreflect the cost of use of the users including active reflective by taking into account distribution network by system customers, and may be the investment cost, added value of users including active differentiated based on system distributed generation, flexibility, customers, and may be users' consumption or digitalisation, demand response, differentiated based on system generation profiles. Where storage and use of the users' consumption or generation Member States have transmission and distribution profiles. Where Member States implemented the deployment of network by system users including have implemented the smart metering systems, active customers, may contain grid deployment of smart metering regulatory authorities may connection capacity elements and systems, [ ] time differentiated introduce time differentiated may be differentiated based on network tariffs may be network tariffs, reflecting the system users' consumption or introduced, reflecting the use of use of the network, in a generation profiles. Where Member the network, in a transparent and transparent and foreseeable way States have implemented the foreseeable way for the for the consumer. deployment of smart metering consumer.

    systems, competent regulatory authorities shall introduce time differentiated network tariffs, reflecting the use of the network, in a transparent and foreseeable and cost efficient way for the consumer. Member States shall ensure that tariffs are not discriminatory.

ANNEX I TREE.2.B EN

  • 302. 
    8. Regulatory authorities AM 81

    shall provide incentives to 8. Regulatory authorities shall 8. [ ] The allowed revenues distribution system operators to provide incentives to distribution to be covered through procure services for the system operators for the most distribution tariffs may include operation and development of efficient operation and performance targets in order to their networks and integrate development of their networks and incentivise distribution system innovative solutions in the integrate innovative solutions in the operators [ ] to operate their distribution systems. For that distribution systems, including networks as efficiently as purpose regulatory authorities through the procurement of possible.

    shall recognise as eligible and services. For that purpose include all relevant costs in regulatory authorities shall distribution tariffs and recognise as eligible and include all introduce performance targets relevant costs in distribution tariffs in order to incentivise and introduce performance targets distribution system operators to in order to incentivise distribution raise efficiencies, including system operators to raise energy efficiency, in their efficiencies, including energy networks. efficiency, flexibility and the digitalisation of the distribution networks including the deployment of smart grids and intelligent metering systems, in their networks.

ANNEX I TREE.2.B EN

  • 303. 
    9. By [OP: please add AM 82 9. By [OP: please add specific date – three months 9. By [OP: please add specific specific date – three months after entry into force] the date – three months after entry into after entry into force] to

    Agency shall provide a force] the Agency shall evaluate mitigate the risk of market recommendation addressed to the feasibility on the convergence fragmentation the Agency shall regulatory authorities on the of transmission and distribution provide a [ ] best practice progressive convergence of tariff methodologies. The report on [ ] transmission and transmission and distribution feasibility study shall address at distribution tariff methodologies tariff methodologies. That least: while leaving sufficient room recommendation shall address to take national specificities at least: into account. That [ ] best practice report shall address at least:

  • 304. 
    (a) the ratio of tariffs applied (a) the ratio of tariffs applied to producers and to consumers; to producers and to consumers;
  • 305. 
    (b) the costs to be recovered (b) the costs to be recovered by tariffs; by tariffs;
  • 306. 
    (c) time differentiated (c) time differentiated network tariffs; network tariffs;
  • 307. 
    (d) locational signals; (d) locational signals;
  • 308. 
    (e) the relationship between (e) the relationship between transmission and distribution transmission and distribution

    tariffs, including principles tariffs, [ ] relating to non-discrimination;

  • 309. 
    (f) methods to ensure (f) methods to ensure transparency in the setting and transparency in the setting and structure of tariffs; structure of tariffs;
  • 310. 
    (g) groups of network users AM 83 (g) groups of network users subject to tariffs, including (g) groups of network users subject to tariffs, including tariff tariff exemptions. subject to tariffs according to exemptions.

    characteristics and forms of consumption, including tariff exemptions

ANNEX I TREE.2.B EN

  • 311. 
    The Agency shall update its report at least once every two years.
  • 312. 
    AM 84

    Article 16 – paragraph 9 a (new) 9a. Regulatory authorities shall adopt a set of indicators for measuring the performance of transmission and distribution system operators, which should at least include all of the following:

  • 313. 
    (a) volume of curtailed energy in

    MWh, disaggregated per type of generation source;

  • 314. 
    (b) percentage of the length of

    lines operated under dynamic line ratings;

  • 315. 
    (c) percentage of substations remotely monitored and controlled in real-time;
  • 316. 
    (d) percentage of the length of lines operated under dynamic line ratings;
  • 317. 
    (e) losses in high, medium and low-voltage grids;
  • 318. 
    (f) the frequency and duration of power interruptions on the grid.

ANNEX I TREE.2.B EN

  • 319. 
    By [two years after the entry into force of this Regulation], and

    every two years thereafter, regulatory authorities shall publish a report on the performance of transmission and distribution system operators, together with recommendations for improvement where necessary.

  • 320. 
    10. Without prejudice to [ ] further harmonisation by way

    of delegated acts pursuant to Article 55(1)(k), regulatory authorities shall take the Agency's recommendation duly into consideration when approving or fixing transmission tariffs or their methodologies in accordance with Article 59(6)(a) of [recast of Directive 2009/72/EC i as proposed by COM(2016) 864 i/2].

  • 321. 
    11. The Agency shall [ ] monitor the implementation of

    its recommendation and provide a report to the Commission by 31st January each year. It shall update the recommendation at least once every two years.

ANNEX I TREE.2.B EN

  • 322. 
    Article 17

    Congestion income

  • 323. 
    1. Congestion-management 1. Congestion-management procedures associated with a procedures associated with a

    pre-specified timeframe may pre-specified timeframe may generate revenue only in the generate revenue only in the event of congestion which event of congestion which arises arises for that timeframe, except for that timeframe, except in the in the case of new case of new interconnectors interconnectors which benefit which benefit from an from an exemption under exemption under Article 7 of Article 7 of Regulation (EC) No Regulation (EC) No 1228/2003 i, 1228/2003, Article 17 of Article 17 of Regulation (EC) Regulation (EC) No 714/2009 i No 714/2009 or Article 59. The or Article 59. The procedure for procedure for the distribution of the distribution of those those revenues shall be subject revenues shall be subject to to review by the regulatory review by the regulatory authorities and shall neither authorities and shall neither distort the allocation process in distort the allocation process in favour of any party requesting favour of any party requesting capacity or energy nor provide a capacity or energy nor provide disincentive to reduce a disincentive to reduce congestion. congestion.

ANNEX I TREE.2.B EN

  • 324. 
    2. Any revenues resulting AM 85 2. Any revenues resulting from the allocation of 2. Any revenues resulting from from the allocation of

    interconnection capacity shall the allocation of interconnection interconnection capacity shall be be used for the following capacity shall be used for the used for the following purposes: purposes: following purposes:

  • 325. 
    (a) guaranteeing the actual (a) guaranteeing the actual (a) guaranteeing the actual availability of the allocated availability of the allocated availability of the allocated

    capacity; capacity; or capacity including firmness compensation;

  • 326. 
    (b) maintaining or increasing (b) maintaining or increasing (b) maintaining or increasing interconnection capacities interconnection capacities through interconnection capacities

    through network investments, optimisation of the usage of through network investments, in in particular in new existing interconnectors by particular in new interconnectors interconnectors. coordinated remedial and and internal lines and internal countertrading actions or network lines which are listed in Ten investments, up to the target value Years Network Development for transfer capacity at cross Plan of the ENTSO for border boundaries. Electricity as being relevant to reduce interconnector congestion,

  • 327. 
    (c) or if applicable, cross border remedial actions such as redispatch and countertrading.
  • 328. 
    If the revenues cannot be Where the objectives set out in 2a. [ ] The revenues [ ] may efficiently used for the purposes points (a) and (b) of the first be used, subject to the

    set out in points (a) or (b) of the subparagraph are fulfilled, the approval by the regulatory first subparagraph, they shall be residual revenues may be used as authorities of the Member placed on a separate internal income to be taken into account by States concerned, as income to account line for future use on the national regulatory authorities be taken into account by the these purposes. when approving the methodology regulatory authorities when for calculating network tariffs approving the methodology for and/or fixing network tariffs. calculating network tariffs and/or fixing network tariffs.

ANNEX I TREE.2.B EN

  • 329. 
    3. The use of revenues in AM 86 3. The use of revenues in accordance with points (a) and 3. The use of revenues in accordance with points (a) [ ] (b) of paragraph 2 shall be accordance with [ ] paragraph 2 (b) or (c) of paragraph 2 shall be subject to a methodology shall be subject to a methodology subject to a methodology

    proposed by the Agency and proposed by the Agency and proposed [ ] by the approved by the Commission. approved by the Commission. The transmission system operators The Agency's proposal shall be Agency's proposal shall be in consultation with regulatory submitted to the Commission submitted to the Commission by authorities and approved by by [OP: 12 months after entry [OP: 12 months after entry into the Agency. The transmission into force] and be approved force] and be approved within six system operators shall submit within six months. months. the proposal to the Agency by [OP: 12 months after entry into force] and the Agency shall decide on it within six months.

  • 330. 
    The Agency may, at its own [ ] initiative or upon a request from

    the Commission update the methodology and the Commission shall approve the updated methodology not later than six months from its submission.

  • 332. 
    The methodology shall detail as The methodology shall detail as a 3a. The methodology shall a minimum the conditions minimum the conditions under detail as a minimum the

    under which the revenues can which the revenues can be used for conditions under which the be used for points (a) and (b) of [ ] paragraph 2 and the conditions revenues [ ] are deemed to paragraph 2 and the conditions under which, and for how long, have fulfilled the objectives under which, and for how long, they may be placed on a separate expressed in points (a) [ ] (b) they may be placed on a internal account line for future use or (c) of paragraph 2 [ ].

ANNEX I TREE.2.B EN

separate internal account line on those purposes. for future use on those purposes.

  • 333. 
    4. Transmission system AM 87 3b. Transmission system operators shall clearly establish 4. Transmission system operators shall clearly establish beforehand how any congestion operators shall clearly establish beforehand how any congestion income will be used, and report beforehand how any congestion income will be used, and report on the actual use of that income will be used, and report on on the actual use of that income. income. On an annual basis, the actual use of that income. On On an annual basis, and by [ ] 1 and by 31 July each year, the an annual basis, and by 31 July March each year, the [ ]

    national regulatory authorities each year, the national regulatory regulatory authorities shall shall publish a report setting out authorities shall publish a report publish a report setting out the the amount of revenue collected setting out the amount of revenue amount of revenue collected for for the 12-month period ending collected for the 12-month period the 12-month period ending on on 30 June of the same year and ending on 30 June of the same year 31 [ ] December of the [ ] how that revenue was used, and how that revenue was used, previous calendar year and including the specific projects including the specific projects the how that revenue was used the income has been used for or income has been used for the pursuant to paragraph 2, the amount placed on a separate amount placed on a separate including the specific projects account line, together with account line, or the amount that the income has been used for or verification that that use has been used when calculating the amount placed on a separate complies with this Regulation network tariffs, together with account line or the amount that and the methodology developed verification that that use complies has been used when pursuant to paragraph 3. with this Regulation. Where some calculating network tariffs, of the congestion revenues are together with verification that used when calculating network that use complies with this tariffs, the report may set out the Regulation and the methodology fulfilment by the transmission developed pursuant to paragraph system operator of the 3. In such cases where some of commitment and balance sheet the congestion revenues are criteria pursuant to paragraph 2. used when calculating network tariffs, the report shall set out how the TSOs fulfilled the priority objectives in Article 2 where applicable.

ANNEX I TREE.2.B EN

  • 334. 
    Chapter IV

    Resource adequacy

  • 335. 
    AM 88 Article 18

    Resource adequacy and capacity Resource adequacy mechanisms

  • 336. 
    1. Member States shall AM 89 1. Member States shall monitor resource adequacy 1. Member States shall monitor monitor resource adequacy within their territory based on resource adequacy within their within their territory [ ] based the European resource territory based on the European on the European resource adequacy assessment pursuant resource adequacy assessment adequacy assessment pursuant to to Article 19. pursuant to Article 19 and shall Article 19 and may perform in publish a report on the results of addition national resource the monitoring. adequacy assessment pursuant to Article 19a.
  • 337. 
    2. Where the European AM 90 2. Where the European or resource adequacy assessment 2. Where the European the national resource adequacy identifies a resource adequacy resource adequacy assessment assessments identify a resource concern Member States shall identifies a resource adequacy adequacy concern Member

    identify any regulatory concern Member States shall States shall identify any distortions that caused or identify any regulatory distortions regulatory distortions or market contributed to the emergence of and/or market failures that caused distortions, or system the concern. or contributed to the emergence of bottlenecks such as insufficient the concern. infrastructure, that caused or contributed to the emergence of the concern.

  • 338. 
    3. Member States shall AM 91 3. Member States shall Council compromise (3 (a) - (f)): publish a timeline for adopting 3. A Member State with publish roadmap with a 3. A Member State with identified adequacy

measures to eliminate any identified adequacy concerns shall concrete timeline for adopting concerns shall publish a market reform

identified regulatory distortions. publish an implementation plan measures to eliminate any

When addressing resource with a timeline for adopting identified regulatory distortions [ plan with a timeline for adopting measures

adequacy concerns Member measures to eliminate any ] or market distortions, or to eliminate any identified regulatory

States shall in particular identified regulatory distortions system bottlenecks. When distortions and/or market failures. When

consider removing regulatory and/or market failures. When addressing resource adequacy addressing resource adequacy concerns, the

distortions, enabling scarcity addressing resource adequacy concerns Member States shall in Member States shall build on the principles pricing, developing concerns, the Member States shall particular take into account the set out in Article 3 and in particular:

ANNEX I TREE.2.B EN

interconnection, energy storage, build on the principles set out in principles defined in Article 3 demand side measures and Article 3 and in particular: and consider removing energy efficiency. regulatory distortions, enabling scarcity pricing via free price formation , developing interconnections with other Member States, allowing for undistorted market access for all market participants including, but not limited to energy storage, demand side measures and energy efficiency.

  • 339. 
    (a) remove regulatory distortions; (a) remove regulatory distortions;
  • 340. 
    (b) remove price caps; (b) remove price caps in accordance with article 9;
  • 341. 
    (c) introduce an administrative (c) introduce a shortage pricing

    shortage pricing for balancing function for balancing energy as

    energy; referred in Article 44(3) of

    Regulation 2017/2195;

  • 342. 
    (d) increase interconnection and (d) increase interconnection and internal grid capacity; internal grid capacity;
  • 343. 
    (e) enable self-generation, energy (e) enable self-generation, energy

    storage, demand side measures and storage, demand side measures and

    energy efficiency by removing

    regulatory obstacles; energy efficiency by removing regulatory obstacles by adopting

    measures to eliminate any identified

    regulatory distortions;

ANNEX I TREE.2.B EN

  • 344. 
    (f) ensure cost-efficient and (f) ensure cost-efficient and marketmarket-based procurement of based procurement of balancing balancing and ancillary services; and ancillary services;
  • 346. 
    AM 92 Council compromise:

    Article 18 – paragraph 3 a (new) 3 a. The Member States shall submit the 3 a. The Member States shall implementation plan to the Agency for submit the implementation plan to review. the Commission for review.

  • 347. 
    AM 93 Council compromise:

    Article 18 – paragraph 3 b (new) 3 b. The Agency shall provide an opinion 3 b. The Commission may [ ] within two months of receipt of the decide, within two months of implementation plan, whether the measures receipt of the implementation are sufficient to eliminate the regulatory plan, whether the measures are distortions and/or market failures. [ ] sufficient to eliminate the Member States shall adapt their regulatory distortions and/or implementation plan taking due account of market failures and may require the Agency's opinion. the Member State to amend the implementation plan accordingly.

ANNEX I TREE.2.B EN

  • 348. 
    AM 94 Council compromise (accept AM 94):

    Article 18 – paragraph 3 c (new) 3 c. The Member State shall 3 c. The Member State shall monitor the monitor the application of the application of the implementation plan and implementation plan and shall shall publish the results in an annual publish the results in an annual report. report.

  • 349. 
    AM 95 Council compromise:

    Article 18 – paragraph 3 d (new) 3 d. The Member State shall submit the 3 d. The Member State shall annual report [ ] to the Agency for an submit a report relating to their opinion. monitoring of the application of the implementation plan to the Agency for an opinion.

  • 350. 
    AM 96

    Article 18 – paragraph 3 e (new) 3 e. The Agency shall submit its opinion under paragraph 3d to the Commission. The Commission shall decide whether the reforms have been sufficiently implemented.

ANNEX I TREE.2.B EN

  • 351. 
    3a. Where the national

    resource adequacy assessment identifies a concern with regards to a bidding zone and the European resource adequacy assessment has not identified a concern with regards to the same bidding zone, the body governing the national resource adequacy assessment shall consult the ENTSO for Electricity and request for an opinion of the Agency. To this extent the body governing the national resource adequacy assessment shall, within one month from the publication of the national resource adequacy assessment, submit to the ENTSO for Electricity and the Agency a report reasoning the occurring divergence between the two resource adequacy assessments. Within one month from the date of the submission of the report the ENTSO for Electricity shall provide its assessment on these divergences and within two months from the date of the submission of the report the Agency shall provide an opinion. The concerned Member State shall take due notice of the assessment and the opinion.

ANNEX I TREE.2.B EN

  • 352. 
    AM 97

    Article 18 a (new) General principles for capacity mechanisms

  • 353. 
    1. To address residual Council compromise (accept para 1): concerns that cannot be 1. To address residual concerns that eliminated by the measures cannot be eliminated by the measures pursuant to Article 18(3), Member pursuant to Article 18(3), Member States States may, as a last resort and may, as a last resort and subject to this subject this Article and to Union Article and to Union State aid rules, State aid rules, introduce capacity introduce capacity mechanisms.

    mechanisms 354. 2. Before introducing capacity Council compromise (accept para 2):

    mechanisms under paragraph, as 2. Before introducing capacity referred to in paragraph 1, mechanisms under paragraph, as referred Member States shall conduct a to in paragraph 1, Member States shall comprehensive study of their conduct a comprehensive study of their possible effects on the possible effects on the neighbouring neighbouring Member States by Member States by consulting, at least, its consulting, at least, its electrically electrically connected neighbouring connected neighbouring Member Member States and the stakeholders of States and the stakeholders of those Member States. those Member States.

ANNEX I TREE.2.B EN

  • 355. 
    3. Member States shall assess whether a capacity mechanism in the form of strategic reserve can address the adequacy concerns.

    Where this is not the case, Member States may implement a different type of capacity mechanism. The parameters determining the amount of capacity procured in the capacity mechanism shall be approved by the national regulatory authority.

  • 356. 
    4. Member States shall not introduce capacity mechanisms where one or both of the following applies: (a) the European resource adequacy assessment has not identified a resource adequacy concern; (b) the detailed

    implementation plan as referred to in Article 18(3) has not received a positive decision by the Commission as referred to in Article 18(3b).

  • 357. 
    5. Where a Member State

    already applies a capacity mechanism, it shall review that mechanism and shall provide that no new contracts are concluded under that mechanism where one or both of the following applies:

  • 358. 
    (a) the European resource adequacy assessment has not identified a resource adequacy concern;

ANNEX I TREE.2.B EN

  • 359. 
    (b) the detailed implementation plan as referred to in Article 18(3) has not received a positive

    decision by the Commission as referred to in Article 18(3b).

  • 360. 
    6. Capacity mechanisms shall be temporary. They shall be

    approved by the Commission for no longer than five years. They shall be phased out or the amount of the committed capacities shall be reduced based on the implementation plan pursuant to Article 18(3). Member States shall continue the application of the implementation plan after the introduction of the capacity mechanism.

  • 361. 
    7. Generation capacity which has started commercial production after [OP: date of entry into force of this Regulation] shall be

    eligible to participate in a capacity mechanism only if its emissions are below 550 gr CO2/kWh. With the exception of strategic reserves generation capacity emitting 550 gr CO2/kWh or more shall not be committed in capacity mechanisms after [OP: 5 years after the entry into force of this Regulation]

ANNEX I TREE.2.B EN

  • 362. 
    Article 19

    European resource adequacy assessment

  • 363. 
    1. The European resource AM 98 1. The European resource adequacy assessment shall 1. The European resource adequacy assessment shall

    cover the overall adequacy of adequacy assessment shall cover the overall adequacy of the electricity system to supply determine resource adequacy the electricity system to supply current and projected demands concerns by assessing the overall current and projected demands for electricity for a ten-year adequacy of the electricity system for electricity for every single period from the date of that to supply current and projected year within for a ten-year assessment, in a yearly demands for electricity in the period from the date of that resolution. Union, within the relevant assessment [ ]. Member States in the region, for each Member State and down to each bidding zone where relevant, for a ten-year period from the date of that assessment, in a yearly resolution.

  • 364. 
    AM 99

    Article 19 – paragraph 1 a (new) 1a. The European resource assessment shall be conducted by the ENTSO for Electricity.

  • 365. 
    2. By [OP: six months after 2. By [OP: six months after entry into force of this entry into force of this

    Regulation], the ENTSO for Regulation], the ENTSO for Electricity shall submit to the Electricity shall submit to the Agency a draft methodology for Electricity Coordination the European resource Group and the Agency a draft adequacy assessment based on methodology for the European the principles provided for in resource adequacy assessment paragraph 4. based on the principles provided for in paragraph 4.

ANNEX I TREE.2.B EN

  • 366. 
    3. Transmission system AM 100 3. Transmission system operators shall provide the 3. Transmission system operators shall provide the ENTSO for Electricity with the operators shall provide the ENTSO ENTSO for Electricity with the data it needs to carry out, every for Electricity with the necessary data it needs to carry out [ ] the year, the European resource data. The transmission system European resource adequacy adequacy assessment. The operators shall have the right to assessment. The ENTSO for ENTSO for Electricity shall request relevant data not Electricity shall carry out the carry out the assessment every containing commercially sensitive assessment every year.

    year. information, and not already Generators and other market collected by the relevant DSO, participants shall provide

    from generators and other market transmission system operators participants. with data regarding expected utilization of the generation resources, considering the availability of primary resources and appropriate scenarios of projected demand and supply.

  • 367. 
    4. The European resource AM 101 4. The European resource adequacy assessment shall be Article 19 – paragraph 4 – adequacy assessment shall be based on a methodology which introductory part based on a methodology which shall ensure that the 4. The European resource shall [ ] make possible that the assessment: adequacy assessment shall be based assessment:

    on a transparent methodology which shall ensure that the assessment:

  • 368. 
    (a) is carried out on bidding (a) is carried out on each zone level covering at least all respective bidding zone level Member States; covering at least all Member States;
  • 369. 
    (b) is based on appropriate AM 102 (b) is based on appropriate scenarios of projected demand (b) is based on appropriate central scenarios of projected and supply including an scenarios of projected demand and demand and supply including an economic assessment of the supply including an economic economic assessment of the

    likelihood of retirement, newassessment of the likelihood of likelihood of retirement, newbuild of generation assets and retirement, mothballing, new-build build of generation assets and

ANNEX I TREE.2.B EN

measures to reach energy of generation assets and measures measures to reach energy efficiency targets and to reach energy efficiency and efficiency targets and appropriate sensitivities on electricity interconnection targets appropriate sensitivities on wholesale prices and carbon and appropriate sensitivities on extreme weather events, price developments; wholesale prices and carbon price hydrological conditions, developments; wholesale prices and carbon price developments;

  • 370. 
    AM 103

    Article 19 – paragraph 4 – point b a (new) (ba) contains a worst case scenario which reflects the exceptionality and different likeliness of the rare events a strategic reserve is designed to address; the generation adequacy gap in such a worst case scenario shall only justify a strategic reserve with a size of not more than 5% of the peak load of the respective Member State;

  • 371. 
    (ba) reflects on how the different types of capacity mechanisms address adequacy concerns;
  • 372. 
    (c) appropriately takes AM 104 (c) appropriately takes account of the contribution of (c) appropriately takes account account of the contribution of all all resources including existing of the contribution of all resources resources including existing and and future generation, energy including existing and future future generation, energy storage, demand response, and generation, energy storage, sectoral storage, demand response, and import and export possibilities integration, demand response, and import and export possibilities and their contribution to import and export possibilities and and their contribution to flexible flexible system operation; their contribution to flexible system system operation;

    operation;

ANNEX I TREE.2.B EN

  • 373. 
    (d) anticipates the likely (d) anticipates the likely impact of the measures referred impact of the measures referred in Article 18(3); in Article 18(3);
  • 374. 
    (e) includes scenarios (e) includes scenarios without without existing or planned and where applicable with

    capacity mechanisms; existing or planned capacity mechanisms;

  • 375. 
    (f) is based on a market (f) is based on a market model using, where applicable, model using, where applicable, the flow-based approach; the flow-based approach;
  • 376. 
    (g) applies probabilistic (g) applies probabilistic calculations; calculations;
  • 377. 
    (ga) applies a single modelling tool with the possibility to use it for national scenarios, sensitivities and assumptions;
  • 378. 
    (h) applies at least the (h) applies at least the following indicators: following indicators referred to in Article 20:
  • 379. 
    – "expected energy not – "expected energy not served", and served", and
  • 380. 
    – "loss of load – "loss of load expectation"; expectation";
  • 381. 
    (i) identifies the sources of (i) identifies the sources of possible resource adequacy possible resource adequacy

    concerns, in particular whether concerns, in particular whether it it is a network or a resource is a network or a resource constraint, or both. constraint, or both.

ANNEX I TREE.2.B EN

  • 382. 
    AM 105

    Article 19 – paragraph 4 – point i a (new) (ia) respects real network development.

  • 383. 
    (j) ensures that national characteristics of generation, demand flexibility and storage, the availability of primary resources and the level of

    interconnection are properly taken into consideration;

  • 384. 
    5. By [OP: six months after 5. By [OP: six months after entry into force of this entry into force of this

    Regulation], the ENTSO for Regulation], the ENTSO for Electricity shall submit to the Electricity shall submit to the Agency a draft methodology for Agency a draft methodology for calculating: calculating:

  • 385. 
    (a) the value of lost load; (a) the value of lost load;
  • 386. 
    AM 106

    Article 19 – paragraph 5 – subparagraph 1 a (new) The methodology shall be based on a transparent, objective and verifiable criteria.

  • 387. 
    (b) the "cost of new entry" (b) the "cost of new entry" for for generation, or demand generation, or demand response; response; and and
  • 388. 
    (c) the reliability standard (c) the reliability standard [ ] expressed as "expected energy referred to in Article 20

    not served" and the "loss of load expectation".

ANNEX I TREE.2.B EN

  • 389. 
    6. The proposals under AM 107 6. The proposals under paragraphs 2 and 5 and the 6. The proposals under paragraphs 2 and 5 for the draft results of the European resource paragraphs 2 and 5 of this Article, methodology, the scenarios, adequacy assessment under the scenarios and assumptions on sensitivities and assumptions paragraph 3 shall be subject to which they are based, and the on which they are based, and prior consultation and approval results of the European resource the results of the European by the Agency under the adequacy assessment under resource adequacy assessment procedure set out in Article 22. paragraph 1a of this Article shall under paragraph 3 shall be be subject to prior consultation and subject to prior consultation approval by the Agency under the with Member States, the procedure set out in Article 22. Electricity Coordination Group and relevant

    stakeholders and approval by the Agency under the procedure set out in Article 22.

ANNEX I TREE.2.B EN

  • 390. 
    Article 19a

    National resource adequacy assessments

  • 391. 
    1. National resource adequacy assessment shall be based on the methodology referred in Article 19(2) in particular provisions provided in paragraph 4 (b) to (j); however, may provide

    additional scenarios, sensitivities and assumptions taking into account national considerations. The national resource adequacy assessment shall use the same modelling tools as used by the ENTSO for Electricity for the European resource adequacy assessment and the same input data and other data to reflect national scenarios, sensitivities and assumptions. In addition, national resource adequacy assessment, when assessing foreign contribution to the security of supply of the bidding zones they cover, shall apply the values for foreign contribution subject to provisions of Article 21.

ANNEX I TREE.2.B EN

  • 392. 
    1a. In addition to the national resource adequacy assessment performed

    pursuant to paragraph 1, Member States may perform a second assessment using different modelling tools than those used by the ENTSO for Electricity for the European resource adequacy assessment while following the remaining requirements of paragraph 1.

  • 393. 
    2. National resource adequacy assessments and, where applicable, the

    assessment of ENTSO for Electricity and the opinion of the Agency pursuant to paragraph 3a of article 18 shall be made publicly available.

  • 394. 
    Article 20

    Reliability standard

  • 395. 
    1. When applying capacity AM 108 1. When applying capacity Council compromise (Accept AM 108): mechanisms Member States 1. When applying capacity mechanisms Member States

    shall have a reliability standard mechanisms Member States shall shall have a reliability standard 1. When applying capacity mechanisms in place indicating their desired have a reliability standard in place. in place indicating their desired Member States shall have a reliability level of security of supply in a A reliability standard shall level of security of supply in a standard in place. A reliability standard transparent manner. indicate the necessary level of transparent manner. shall indicate the necessary level of security security of supply of the Member of supply of the Member State in a State in a transparent manner. In transparent manner. In the case of crossthe case of cross-border bidding border bidding zones, such reliability zones, such reliability standards standards shall be established jointly by the shall be established jointly by the relevant authorities. relevant authorities.

ANNEX I TREE.2.B EN

  • 396. 
    2. The reliability standard 2. The reliability standard Maintain GA shall be set by the national shall be set by the [ ] Member

    regulatory authority based on State or a competent authority the methodology pursuant to designated by the Member Article 19(5). State based on the methodology pursuant to Article 19(5)

  • 397. 
    3. The reliability standard 3. The reliability standard Maintain GA shall be calculated using the shall be calculated using at least

    value of lost load and the cost the value of lost load and the of new entry over a given cost of new entry over a given timeframe. timeframe and be expressed as "expected energy not served" and the "loss of load expectation".

  • 398. 
    4. The parameters AM 109 4. When applying capacity Maintain GA determining the amount of deleted mechanisms the parameters

    capacity procured in the determining the amount of capacity mechanism shall be capacity procured in the capacity approved by the national mechanism shall be approved by regulatory authority. the [ ] Member State or another competent authority designated by the Member State.

  • 399. 
    Article 21

    Cross-border participation in capacity mechanisms

  • 400. 
    1. Mechanisms other than 1. Mechanisms other than Maintain GA strategic reserves shall be open strategic reserves and where

    to direct participation of technically feasible, strategic capacity providers located in reserves, shall be open to direct another Member State provided cross-border participation of there is a network connection capacity providers located in between that Member State and another Member State [ ] the bidding zone applying the pursuant to the provisions of mechanism. this Article.

ANNEX I TREE.2.B EN

  • 401. 
    2. Member States shall 2. Member States shall ensure that foreign capacity ensure that foreign capacity capable of providing equivalent capable of providing equivalent technical performance to technical performance to

    domestic capacities has the domestic capacities has the opportunity to participate in the opportunity to participate in the same competitive process as same competitive process as domestic capacity. domestic capacity. In the case of capacity mechanisms in operation as of the [date of entry into force], Member States may allow direct participation in the same competitive process of interconnectors as foreign capacity for a maximum of four years after [entry into force] or two years following the approval of the methodologies referred to in paragraph 10 of this Article, whatever happens earlier. Member States may apply following requirements to the foreign capacity:

ANNEX I TREE.2.B EN

  • 402. 
    (a) the capacity is located in a Member State with a direct network connection between

    that Member State and the Member State applying the mechanism,

  • 403. 
    (b) the capacity is not participating in another capacity mechanism for which the capacity needs to be available,
  • 404. 
    3. Member States shall not 3. Member States shall not restrict capacity which is restrict capacity which is located located in their territory from in their territory from

    participating in capacity participating in capacity mechanisms of other Member mechanisms of other Member States. States.

  • 405. 
    4. Cross-border 4. Cross-border participation participation in market-wide in [ ] capacity mechanisms shall capacity mechanisms shall not not change, alter or otherwise

    change, alter or otherwise impact cross-zonal schedules impact cross-zonal schedules and physical flows between and physical flows between Member States which shall be Member States which shall be determined solely by the determined solely by the outcome of capacity allocation outcome of capacity allocation pursuant to Article 14. pursuant to Article 14.

ANNEX I TREE.2.B EN

  • 406. 
    5. Capacity providers shall AM 110 5. Capacity providers shall Council compromise: be able to participate in more 5. Capacity providers shall be be [ ] subject to nonthan

one mechanism for the able to participate in more than one availability payments in case 5. Capacity providers shall be [ ]

same delivery period. They mechanism for the same delivery of non-availability. In case subject to non-availability payments in

shall be subject to nonperiod. They shall be subject to capacity providers participate case of non-availability. In case capacity

availability payments in case of non-availability payments in case in more than one mechanism for providers participate in more than one

non-availability, and subject to of non-availability, and subject to the same delivery period, they mechanism for the same delivery period,

two or more non-availability two or more non-availability shall be subject to [ ] multiple they shall be subject to [ ] multiple nonpayments

where there is payments where there is concurrent non-availability payments availability payments when they are

concurrent scarcity in two or scarcity in two or more bidding when they are unable to fulfil unable to fulfil multiple commitments.

more bidding zones where the zones where the capacity provider multiple commitments. Capacity providers shall be able to

capacity provider is contracted. is contracted. Capacity providers participate with no more than their

shall be able to participate with no available maximum capacity.

more than their available

maximum capacity.

  • 407. 
    6. Regional operational AM 111 6. Where capacity

centres established pursuant to 6. Regional coordination mechanisms are applied,

Article 32 shall annually centres established pursuant to Transmission System

calculate the maximum entry Article 32 shall annually calculate Operators [ ] shall annually

capacity available for the the maximum entry capacity calculate the maximum entry

participation of foreign capacity available for the participation of capacity available for the

taking into account the foreign capacity taking into participation of foreign capacity

expected availability of account the expected availability of [ ] based on the methodology

interconnection and the likely interconnection and the likely referred in point (a) of

concurrence of system stress concurrence of system stress paragraph 10 and taking into

between the system where the between the system where the account the recommended

mechanism is applied and the mechanism is applied and the values calculated by the

system in which the foreign system in which the foreign Regional Security

capacity is located. A capacity is located. A calculation is Coordinators pursuant to

calculation is required for each required for each bidding zone Article 34(q), 38 and 39, the

bidding zone border. border. level of physical

interconnection between

Member States, expected

availability of interconnection

and the likely concurrence of

ANNEX I TREE.2.B EN

system stress between the system where the mechanism is applied and the system in which the foreign capacity is located. A calculation is required for each bidding zone border.

  • 408. 
    7. Member States shall 7. Member States shall ensure that the entry capacity ensure that the entry capacity referred to in paragraph 6 is referred to in paragraph 6 is allocated to eligible capacity allocated to eligible capacity providers in a transparent, nonproviders in a transparent, nondiscriminatory and marketdiscriminatory and market-based based manner. manner.
  • 409. 
    8. Any difference in the 8. [ ] If there are capacity cost of foreign capacity and mechanisms open for crossdomestic

    capacity arising border participation in two through the allocation referred neighbouring Member States, to in paragraph 7 shall accrue to any revenues arising through transmission system operators the allocation referred to in and be shared between them paragraph 7 shall accrue to according to the methodology transmission system operators referred in point (b) of and be shared between them paragraph 10. Transmission according to the methodology system operators shall use such referred in point (b) of paragraph revenues for the purposes set 10 or a common methodology out in Article 17(2). approved by both relevant regulatory authorities. If the neighbouring Member State is not applying a capacity mechanism, the share of revenues shall be approved by the competent national authority of the Member State where the capacity mechanism is implemented after seeking

ANNEX I TREE.2.B EN

the opinion of the regulatory authorities of the neighbouring Member States. Transmission system operators shall use such revenues for the purposes set out in Article 17(2).

  • 410. 
    9. The transmission system 9. The transmission system operator where the foreign operator where the foreign

    capacity is located shall: capacity is located shall: 411. (a) establish whether (a) establish whether

    interested capacity providers interested capacity providers can can provide the technical provide the technical performance as required by the performance as required by the capacity mechanism in which capacity mechanism in which the capacity provider intends to the capacity provider intends to participate and register the participate and register the capacity provider in the registry capacity provider in the registry as eligible capacity providers. as eligible capacity providers.

  • 412. 
    (b) carry out availability (b) carry out availability checks as appropriate. checks [ ]
  • 413. 
    (c) be notified by the respective capacity provider without delay about its participation in foreign capacity mechanism
  • 414. 
    (d) notify to the transmission system operator in the Member State applying the capacity mechanism the information received under paragraph 9a to 9c.

ANNEX I TREE.2.B EN

  • 415. 
    10. By [OP: twelve months 10. By [OP: twelve months after entry into force of this after entry into force of this

    Regulation] the ENTSO for Regulation] the ENTSO for Electricity shall submit to the Electricity shall submit to the Agency: Agency:

  • 416. 
    (a) a methodology for (a) a methodology calculating the maximum entry for calculating by the Regional capacity for cross-border Security Coordinator and

    participation as referred to in transmission system operators paragraph 6; the maximum entry capacity for cross-border participation as referred to in paragraph 6;

  • 417. 
    (b) a methodology for (b) a methodology for sharing sharing the revenues referred to the revenues referred to in

    in paragraph 8; paragraph 8; 418. (c) common rules to carry (c) common rules to carry out

    out availability checks referred availability checks referred to in to in point (b) of paragraph 9; point (b) of paragraph 9;

  • 419. 
    (d) common rules to (d) common [ ] principles to determine when a nondetermine when a nonavailability

    payment is due; availability payment is due; 420. (e) terms of the operation of (e) terms of the operation of

    the registry as referred to in the registry as referred to in point (a) of paragraph 9; point (a) of paragraph 9;

  • 421. 
    (f) common rules to identify (f) common rules to identify capacity eligible to participate capacity eligible to participate as as referred to in point (a) of referred to in point (a) of

    paragraph 9. paragraph 9.

ANNEX I TREE.2.B EN

  • 422. 
    The proposal shall be subject to The proposal shall be subject to prior consultation and approval prior consultation and approval by the Agency under the by the Agency under the

    procedure set out in Article 22. procedure set out in Article 22. 423. 11. The Agency shall verify 11. The [ ] national

    whether the capacities have regulatory authorities been calculated in line with the concerned shall verify whether methodology as referred to in the capacities have been point (a) of paragraph 10. calculated in line with the methodology as referred to in point (a) of paragraph 10.

  • 424. 
    12. National regulatory 12. [ ] Regulatory authorities authorities shall ensure that shall ensure that cross-border

    cross-border participation in participation in capacity capacity mechanisms is mechanisms is organised in an organised in an effective and effective and non-discriminatory non-discriminatory manner. manner. They shall in particular They shall in particular provide provide for adequate for adequate administrative administrative arrangements for arrangements for the the enforcement of nonenforcement of non-availability availability payments across payments across borders. borders.

ANNEX I TREE.2.B EN

  • 425. 
    13. Allocated capacities as 13. Allocated capacities as referred to in paragraph 7 shall referred to in paragraph 7 shall be transferable between eligible be transferable between eligible capacity providers. Eligible capacity providers. Eligible

    capacity providers shall notify capacity providers shall notify any transfer to the registry as any transfer to the registry as referred to in point (a) of referred to in point (a) of paragraph 9. paragraph 9.

  • 426. 
    14. No later than [OP: two 14. No later than [OP: two years after the entry into force years after the entry into force of of this Regulation] the ENTSO this Regulation] the ENTSO for for Electricity shall set up and Electricity shall set up and

    operate the registry as referred operate the registry as referred to to in point (a) of paragraph 9. in point (a) of paragraph 9. The The registry shall be open to all registry shall be open to all eligible capacity providers, the eligible capacity providers, the systems applying the systems applying the mechanisms and their mechanisms and their transmission system operators. transmission system operators.

ANNEX I TREE.2.B EN

  • 427. 
    Article 22

    Approval procedure 428. 1. Where reference is made 1. Where reference is made

    to this Article, the procedure set to this Article, the procedure set out in paragraphs 2 to 4 shall be out in paragraphs 2 to 4 shall be applicable to the approval of a applicable to the approval of a proposal submitted by the proposal submitted by the ENTSO for Electricity. ENTSO for Electricity.

  • 429. 
    2. Prior to submitting the 2. Prior to submitting the proposal, the ENTSO for proposal, the ENTSO for

    Electricity shall conduct a Electricity shall conduct a consultation process involving consultation process involving all relevant stakeholders, all relevant stakeholders, [ ] national regulatory authorities regulatory authorities and other and other national authorities. national authorities and shall take the results of a consultation process duly into consideration.

  • 430. 
    3. Within three months 3. Within three months from from the date of receipt, the the date of receipt, the Agency

    Agency shall either approve the shall either approve the proposal proposal or amend it. In the or amend it. In the latter case, latter case, the Agency shall the Agency shall consult the consult the ENTSO for ENTSO for Electricity before Electricity before adopting the adopting the amended proposal. amended proposal. The adopted The adopted proposal shall be proposal shall be published on published on the Agency's the Agency's website at the website at the latest three latest three months after the months after the date of receipt date of receipt of the proposed of the proposed documents. documents.

ANNEX I TREE.2.B EN

  • 431. 
    4. The Agency may request 4. The Agency may request changes to the approved changes to the approved

    proposal at any time. Within six proposal at any time. Within six months from the request, the months from the request, the ENTSO for Electricity shall ENTSO for Electricity shall submit to the Agency a draft of submit to the Agency a draft of the proposed changes. Within a the proposed changes. Within a period of three months from the period of three months from the date of receipt of the draft, the date of receipt of the draft, the Agency shall amend or approve Agency shall amend or approve the changes and publish it on its the changes and publish it on its website. website.

  • 432. 
    Article 23

    Design principles for capacity mechanisms

  • 433. 
    1. To address residual AM 112 1. To address residual Council compromise: concerns that cannot be 1. Any capacity mechanism concerns that cannot be 1. Any capacity mechanism shall: eliminated by the measures shall: eliminated by the measures

    pursuant to Article 18(3), pursuant to Article 18(3), Member States may introduce Member States may introduce capacity mechanisms, subject to capacity mechanisms, subject to the provisions of this Article the provisions of this Article and and to the Union State aid rules. [ ] without prejudice to the Union State aid rules pursuant to Articles 107 to 109 TFEU.

  • 434. 
    (a) not create undue market (a) not create undue market distortions and distortions and not limit crossnot limit cross-zonal trade;

    border trade; 435. (b) not go beyond what is (b) not go beyond what is necessary to

    necessary to address the adequacy address the adequacy concern; concern;

  • 436. 
    (c) select capacity providers by (c) select capacity providers by means of a means of a transparent, nontransparent, non-discriminatory and

    discriminatory and market-based competitive process; process;

ANNEX I TREE.2.B EN

  • 437. 
    (d) be technology neutral; [ ]
  • 438. 
    (e) provide incentives for capacity (e) provide incentives for capacity providers providers to be available in times to be available in times of expected system

    of expected system stress; stress; 439. (f) ensure that the remuneration is (f) ensure that the remuneration is

    determined through a marketdetermined through the competitive based process; process;

  • 440. 
    (g) set out the required technical (g) set out the required technical conditions conditions for the participation of for the participation of capacity providers in capacity providers in advance of advance of the selection process;

    the selection process; 441. (h) be open to participation of all (h) be open to participation of all resources,

    resources, including storage and including storage and demand side demand side management that are management that are capable of providing capable of providing the required the required technical performance; technical performance;

  • 442. 
    (i) apply appropriate penalties to (i) apply appropriate penalties to capacity capacity providers when not providers when not available in the event of available in the event of system system stress;

    stress; 443. (j) ensure that capacity contracts [ ]

    for existing installations are rewarded for a maximum length of 1 year.

  • 444. 
    2. Where a Member State AM 113 2. Where a Member State wishes to implement a capacity 2. Capacity mechanisms in the wishes to implement a capacity mechanism, it shall consult on form of strategic reserves shall: mechanism, it shall consult on the proposed mechanism at the proposed mechanism at least least with its electrically with its directly electrically connected neighbouring connected neighbouring

    Member States. Member States based on a comprehensive study on the possible effects on those

    Member States.

ANNEX I TREE.2.B EN

  • 445. 
    (a) be held outside the market;
  • 446. 
    (b) be dispatched only where dayahead and intraday markets have failed to clear and transmission system operators have exhausted their balancing resources to

    establish an equilibrium between demand and supply;

  • 447. 
    (c) ensure that during periods where strategic reserves were dispatched, imbalances are settled at the technical price limit applied by the market operators pursuant to Article 9 or at the value of lost load, whichever the higher.
  • 448. 
    (d) be limited to maximum

    emissions of 200kg/CO2/kW for the electricity production per year The electricity generated, or the load reduction achieved by resources in the strategic reserve shall not be sold through wholesale electricity markets.

  • 449. 
    2a. When a capacity Council compromise: mechanism is designed as a 2a.When a capacity mechanism is strategic reserve, resources in designed as a strategic reserve, resources the strategic reserve shall only in the strategic reserve shall only be be dispatched in case dispatched in case transmission system transmission system operators operators are likely to exhaust their

    are likely to exhaust their

    balancing resources to balancing resources to establish an establish an equilibrium equilibrium between demand and supply.

    between demand and supply.

    This requirement is without This requirement is without prejudice to prejudice to activating activating resources ahead of actual

    resources ahead of actual dispatch in order to respect their ramping constraints and operating requirements.

ANNEX I TREE.2.B EN

dispatch in order to respect Energy from resources in reserve that is their ramping constraints and released during activation shall be reoperating requirements. dispatched to avoid market distortion. During periods where The output of the strategic reserve during resources in the strategic activation shall not be attributed to

reserve were dispatched

imbalances in the market shall balance groups through wholesale be settled at least at the markets or shall not change their bidding limit pursuant to imbalances.

Article 9. The resources taking

part in the strategic reserve During imbalance settlement periods shall not get remunerated where resources in the strategic reserve through wholesale electricity were dispatched imbalances in the market

markets or balancing markets. shall be settled at [the value of lost load /at a value higher than the maximum clearing

price as referred in Article 54 of Regulation (EU) 2015/1222 [CACM]].

The output of the strategic reserve following dispatch shall be attributed to balance responsible parties through the imbalance settlement mechanism.

The resources taking part in the strategic reserve shall not get remunerated through wholesale electricity markets or balancing markets.

The plants in the strategic reserve shall be held outside of the market for the duration of the contractual period.

ANNEX I TREE.2.B EN

  • 450. 
    3. Capacity mechanisms AM 114 3. Capacity mechanisms Council compromise: shall not create unnecessary 3. In addition to the shall: 3. In addition to the requirements laid market distortions and not limit requirements laid down in down in paragraph 1, capacity mechanisms cross-border trade. The amount paragraph 1, capacity mechanisms other than strategic reserves shall: of capacity committed in the other than strategic reserves shall:

    mechanism shall not go beyond what is necessary to address the concern.

  • 451. 
    (a) be constructed so as to ensure (a) be constructed so as to ensure that the that the price paid for availability price paid for availability automatically

    automatically tends to zero when tends to zero when the level of capacity the level of capacity supplied is supplied is expected to be adequate to meet expected to be adequate to meet the level of capacity demanded the level of capacity demanded;

  • 452. 
    (b) remunerate the participating (b) remunerate the participating resources resources merely for their merely for their availability and ensure that availability and ensure that the the remuneration does not affect decisions remuneration does not affect of the capacity provider whether or not to decisions of the capacity provider generate;

    whether or not to generate;

ANNEX I TREE.2.B EN

  • 453. 
    (c) ensure that capacity (c) ensure that capacity obligations are obligations are transferable transferable between eligible capacity between eligible capacity providers.

    providers. 454. (a) not create [ ]

    unnecessary market distortions and not limit cross [ ] zonal trade;

  • 455. 
    (b) be market-based; [ ]
  • 456. 
    (c) be open to participation [ ] of all resources that are

    capable of providing the required technical performance in a technology neutral manner and through fair and transparent rules, including but not limited to participation of storage, energy efficiency and demand response;

  • 457. 
    (d) be temporary, but are [ ] permitted, in accordance with

    state aid rules, as long as the relevant resource adequacy assessment identifies a resource adequacy concern;

  • 458. 
    (e) [ ] not go beyond what is [ ] necessary to address the

    resource adequacy concern. 459. 4. Generation capacity for AM 115 4. In the design of a

    which a final investment capacity mechanism, Member decision has been made after deleted States shall apply the following [OP: entry into force] shall only requirements regarding CO2 be eligible to participate in a emission limits: capacity mechanism if its

ANNEX I TREE.2.B EN

emissions are below 550 gr CO2/kWh. Generation capacity emitting 550 gr CO2/kWh or more shall not be committed in capacity mechanisms 5 years after the entry into force of this Regulation.

  • 460. 
    (a) Generation capacity emitting more than 550 gr CO2/kWh of energy or more than 700 kg CO2 on average per year per installed kW for which a final investment

    decision has been made after [OP: date of entry into force] shall not receive payments or commitments for future payments under a capacity mechanism as of 31 December 2025.

  • 461. 
    (b) Generation capacity emitting more than 550 gr CO2/kWh of energy or more than 700 kg CO2 on average per year per installed kW for which a final investment

    decision has been made before [OP: date of entry into force] shall not receive payments or commitments for future payments under a capacity mechanism as of 31 December 2030, except for contracts with a remaining duration of not more than 5 years concluded

ANNEX I TREE.2.B EN

before 31 December 2030. Between 31 December 2025 and 31 December 2030, the capacity receiving remuneration for this participation should be reduced by 5% per year.

  • 462. 
    (c) The emission limit of 550 gr CO2/kWh of energy and the limit of 700 kg CO2 on

    average per year per installed kW shall be calculated based on the design efficiency of the generation unit as provided by an accredited certification organisation.

  • 463. 
    5. Where the European AM 116 [ ] resource adequacy assessment

    has not identified a resource deleted adequacy concern, Member States shall not apply capacity mechanisms.

ANNEX I TREE.2.B EN

  • 464. 
    5a. When designing capacity mechanisms, Member States

    shall include a provision allowing for efficient phase-out of a capacity mechanism within 4 years in case the resource adequacy concern is no longer present. This phaseout can be an administrative cessation of the mechanism, with a reasonable advance notice, or provisions in the design of the mechanism which would lead to the suspension of associated economic incentives when there is no adequacy concern.

  • 465. 
    Article 24

    Existing mechanisms

  • 466. 
    Member States applying AM 117 1. Member States applying capacity mechanisms on [OP: Member States applying capacity capacity mechanisms on [OP: entry into force of this mechanisms on [OP: entry into entry into force of this

    Regulation] shall adapt their force of this Regulation] shall Regulation] shall adapt their mechanisms to comply with adapt their mechanisms to comply mechanisms to comply with Articles 18, 21 and 23 of this with Articles 18, 18a, 21 and 23 of Articles 18, 21 and 23 of this Regulation. this Regulation. Regulation without prejudice to commitments or contracts, concluded before that date, and without prejudice to the Union State aid rules pursuant to Articles 107 to 109 TFEU, including state aid decisions taken thereafter before that date.

ANNEX I TREE.2.B EN

  • 467. 
    Chapter V

    Transmission system operation

  • 468. 
    Article 25

    European network of transmission system operators for electricity

  • 469. 
    1. Transmission system 1. Transmission system Maintain Council GA operators shall cooperate at operators shall cooperate at

    Union level through the Union level through the ENTSO ENTSO for Electricity, in order for Electricity, in order to to promote the completion and promote the completion and functioning of the internal functioning of the internal market in electricity and crossmarket in electricity and cross [ border trade and to ensure the ] zonal trade and to ensure the optimal management, optimal management, coordinated operation and coordinated operation and sound sound technical evolution of the technical evolution of the European electricity European electricity transmission network. transmission network.

  • 470. 
    2. In performing its

    functions under EU law, the 2. In performing its

    Provisionally agreed:

    ENTSO for Electricity shall act functions under EU law, the 2. In performing its functions under EU for the European good and ENTSO for Electricity shall [ ] law, the ENTSO for Electricity shall act in independent from individual contribute to the efficient and the interest of a well functioning and national interests or the national sustainable achievement of the integrated Internal Electricity market and interests of transmission system objectives set out in the policy shall [ ] contribute to the efficient and operators, and shall contribute framework for climate and sustainable achievement of the objectives set to the efficient and sustainable energy covering the period from out in the policy framework for climate and achievement of the objectives 2020 to 2030, in particular by energy covering the period from 2020 to set out in the policy framework contributing to the efficient 2030, in particular by contributing to the for climate and energy covering integration of electricity efficient integration of electricity generated the period from 2020 to 2030, generated from renewable from renewable energy sources and to in particular by contributing to energy sources and to increases increases in energy efficiency while the efficient integration of in energy efficiency while maintaining system security. The ENTSO electricity generated from maintaining system security. for Electricity shall have adequate human renewable energy sources and and financial resources to carry out its to increases in energy duties.

    efficiency.

ANNEX I TREE.2.B EN

  • 471. 
    Article 26

    Establishment of the ENTSO for Electricity

  • 472. 
    1. The transmission system 1. The transmission system No change operators for electricity shall operators for electricity shall 1. The transmission system operators for submit to the Commission and submit to the Commission and to electricity shall submit to the Commission to the Agency the draft statutes, the Agency the draft statutes, a and to the Agency the draft statutes, a list of a list of members and draft list of members and draft rules members and draft rules of procedure, rules of procedure, including of procedure, including the rules including the rules of procedures on the the rules of procedures on the of procedures on the consultation of other stakeholders, of the consultation of other consultation of other ENTSO for Electricity to be established. stakeholders, of the ENTSO for stakeholders, of the ENTSO for

    Electricity to be established. Electricity to be established. 473. 2. Within two months of the 2. Within two months of the No change

    day of the receipt, the Agency, day of the receipt, the Agency, 2. Within two months of the day of the after formally consulting the after formally consulting the receipt, the Agency, after formally organisations representing all organisations representing all consulting the organisations representing all stakeholders, in particular the stakeholders, in particular the stakeholders, in particular the system users, system users, including system users, including including customers, shall provide an customers, shall provide an customers, shall provide an opinion to the Commission on the draft opinion to the Commission on opinion to the Commission on statutes, list of members and draft rules of the draft statutes, list of the draft statutes, list of procedure. members and draft rules of members and draft rules of procedure. procedure.

ANNEX I TREE.2.B EN

  • 474. 
    3. The Commission shall 3. The Commission shall No change deliver an opinion on the draft deliver an opinion on the draft 3. The Commission shall deliver an statutes, list of members and statutes, list of members and opinion on the draft statutes, list of members draft rules of procedures taking draft rules of procedures taking and draft rules of procedures taking into into account the opinion of the into account the opinion of the account the opinion of the Agency provided Agency provided for in Agency provided for in for in paragraph 2 and within three months paragraph 2 and within three paragraph 2 and within three of the day of the receipt of the opinion of the months of the day of the receipt months of the day of the receipt Agency.

    of the opinion of the Agency. of the opinion of the Agency. 475. 4. Within three months of 4. Within three months of No change

the day of receipt of the the day of receipt of the 4. Within three months of the day of

Commission's favourable Commission's favourable receipt of the Commission's favourable

opinion, the transmission opinion, the transmission system opinion, the transmission system operators

system operators shall establish operators shall establish the shall establish the ENTSO for Electricity and

the ENTSO for Electricity and ENTSO for Electricity and adopt adopt and publish its statutes and rules of

adopt and publish its statutes and publish its statutes and rules procedure.

and rules of procedure. of procedure.

  • 476. 
    5. The documents referred 5. The documents referred to No change

to in paragraph 1 shall be in paragraph 1 shall be 5. The documents referred to in

submitted to the Commission submitted to the Commission paragraph 1 shall be submitted to the

and to the Agency in case of and to the Agency in case of Commission and to the Agency in case of

changes thereof or upon changes thereof or upon changes thereof or upon reasoned request of

reasoned request of the reasoned request of the the Commission or of the Agency. The

Commission or of the Agency. Commission or of the Agency. Agency and the Commission shall deliver an

The Agency and the The Agency and the opinion in accordance with paragraphs 2 to

Commission shall deliver an Commission shall deliver an 4.

opinion in accordance with opinion in accordance with

paragraphs 2 to 4. paragraphs 2 to 4.

ANNEX I TREE.2.B EN

  • 477. 
    Article 27

    Tasks of the ENTSO for Electricity

  • 478. 
    1. The ENTSO for Electricity 1. The ENTSO for No change shall : Electricity shall: 1. The ENTSO for Electricity shall:
  • 479. 
    (a) elaborate network codes (a) elaborate network codes No change in the areas set out in Article in the areas set out in Article (a) elaborate network codes in the areas 55(1) with a view to achieving 55(1) with a view to achieving set out in Article 55(1) with a view to the objectives set out in Article the objectives set out in Article achieving the objectives set out in Article 25 25 . 25
  • 480. 
    (b) adopt and publish a non(b) adopt and publish a non No change binding Union-wide ten-year binding Union-wide ten-year (b) adopt and publish a non-binding network development plan, network development plan, Union-wide ten-year network development (Union-wide network (Union-wide network plan, (Union-wide network development development plan), every two development plan), every two plan), every two years; years; years;
  • 481. 
    (c) prepare and adopt AM 118 (c) prepare and adopt Compromise proposal: (Seen by COREPER proposals related to the (c) prepare and adopt proposals proposals related to the on 7 September and 12 October) Still to be European resource adequacy related to the European resource European resource adequacy discussed with the EP

    assessment pursuant to Article adequacy assessment pursuant to assessment pursuant to Article c) prepare and adopt proposals related to 19(2), (3) and (5) and for the Article 19(1a) and for the technical 19(2), (3) and (5) and for the the European resource adequacy assessment technical specifications for specifications for cross-border technical specifications for pursuant to Article 19 [ ] and for the cross-border participation in participation in capacity cross-border participation in technical specifications for cross-border capacity mechanisms pursuant mechanisms pursuant to Article capacity mechanisms pursuant to participation in capacity mechanisms to Article 21(10); 21(10); Article 21(10); pursuant to Article 21(10);

  • 482. 
    (d) adopt recommendations (d) adopt recommendations No change relating to the coordination of relating to the coordination of (d) adopt recommendations relating to the technical cooperation between technical cooperation between coordination of technical cooperation Union and third-country Union and third-country between Union and third-country transmission system operators; transmission system operators; transmission system operators;
  • 483. 
    (e) adopt a framework for (e) adopt a framework for the Maintain Council GA the cooperation and cooperation and coordination

    coordination between regional between [ ] regional security operational centres; coordinators;

ANNEX I TREE.2.B EN

  • 484. 
    (f) adopt a proposal defining (f) adopt a proposal defining Maintain Council GA the system operation region the system operation region [ ]

    covered by each regional in accordance with the operational centre; provisions of Article 33;

  • 485. 
    (fa) cooperate with Provisionally agreed: distribution system operators (fa) cooperate with distribution system and the EU DSO entity. operators and the EU DSO entity
  • 486. 
    (fb) promote the Provisionally agreed: digitalisation of transmission (fb) promote the digitalisation of networks including transmission networks including deployment of smart grids and deployment of smart grids, efficient real intelligent metering systems; time data acquisition and intelligent metering systems;
  • 487. 
    (g) adopt common network (g) adopt common network No change operation tools to ensure operation tools to ensure (g) adopt common network operation coordination of network coordination of network tools to ensure coordination of network operation in normal and operation in normal and operation in normal and emergency emergency conditions, emergency conditions, including conditions, including a common incident including a common incident a common incident classification classification scale, and research plans, classification scale, and scale, and research plans, including the deployment of these plans research plans, including the including the deployment of through an efficient research programme. deployment of these plans these plans through an efficient These tools shall specify inter alia: through an efficient research research programme. These

    programme. These tools shall tools shall specify inter alia: specify inter alia:

  • 488. 
    (i) the information, (i) the information, including No change including appropriate day appropriate day ahead, intra-day (i) the information, including appropriate ahead, intra-day and real-time and real-time information, useful day ahead, intra-day and real-time information, useful for for improving operational information, useful for improving improving operational coordination, as well as the operational coordination, as well as the coordination, as well as the optimal frequency for the optimal frequency for the collection and optimal frequency for the collection and sharing of such sharing of such information; collection and sharing of such information;

    information;

ANNEX I TREE.2.B EN

  • 489. 
    (ii) the technological (ii) the technological platform No change platform for the exchange of for the exchange of information (ii) the technological platform for the information in real time and in real time and where exchange of information in real time and where appropriate, the appropriate, the technological where appropriate, the technological technological platforms for the platforms for the collection, platforms for the collection, processing and collection, processing and processing and transmission of transmission of the other information transmission of the other the other information referred to referred to in point (i), as well as for the information referred to in point in point (i), as well as for the implementation of the procedures capable of (i), as well as for the implementation of the increasing operational coordination between implementation of the procedures capable of increasing transmission system operators with a view to procedures capable of operational coordination such coordination becoming Union-wide; increasing operational between transmission system

    coordination between operators with a view to such transmission system operators coordination becoming Unionwith a view to such wide; coordination becoming Unionwide;

  • 490. 
    (iii) how transmission system (iii) how transmission system No change operators make available the operators make available the (iii) how transmission system operators operational information to other operational information to other make available the operational information transmission system operators transmission system operators or to other transmission system operators or any or any entity duly mandated to any entity duly mandated to entity duly mandated to support them to support them to achieve support them to achieve achieve operational coordination, and to the operational coordination, and to operational coordination, and to Agency; and the Agency; and the Agency; and
  • 491. 
    (iv) that transmission system (iv) that transmission system No change operators designate a contact operators designate a contact (iv) that transmission system operators point in charge of answering point in charge of answering designate a contact point in charge of inquiries from other inquiries from other answering inquiries from other transmission transmission system operators transmission system operators or system operators or from any entity duly or from any entity duly from any entity duly mandated mandated as referred to in point (iii), or from mandated as referred to in point as referred to in point (iii), or the Agency concerning such information. (iii), or from the Agency from the Agency concerning

    concerning such information. such information.

ANNEX I TREE.2.B EN

  • 492. 
    (h) adopt an annual work (h) adopt an annual work No change programme; programme; (h) adopt an annual work programme;
  • 493. 
    AM 119 Compromise proposal: (Seen by COREPER

    Article 27 – paragraph 1 – point on 7 September and 12 October) Still to be h a (new) discussed with the EP (h a) standardise, in cooperation h a (new) with the EU DSO entity, relevant (h a) contribute to the establishment of data formats and protocols to interoperability requirements and nonfacilitate cross-border exchange of discriminatory and transparent procedures data; for accessing data as provided for in Article 24 of the [Electricity Directive]

  • 494. 
    (i) adopt an annual report; (i) adopt an annual report; No change

    (i) adopt an annual report; 495. (j) carry out and adopt (j) carry out and adopt No change

    seasonal adequacy outlooks seasonal adequacy outlooks (j) carry out and adopt seasonal adequacy pursuant to Article 9(2) pursuant to Article 9(2) outlooks pursuant to Article 9(2) [Regulation [Regulation on risk [Regulation on risk preparedness on risk preparedness as proposed by preparedness as proposed by as proposed by COM(2016) COM(2016) 862 i] . COM(2016) 862 i]. 862] .

  • 496. 
    AM 120 Provisionally agreed to merge with (fb) line

    Article 27 – paragraph 1 – point j 486.) a (new) (j a) promote digitalisation of transmission systems to ensure, inter alia, efficient real time data acquisition and use and smart substations;

ANNEX I TREE.2.B EN

  • 497. 
    AM 121 Provisionally agreed:

    Article 27 – paragraph 1 – point j (j b) promote data management, cyber b (new) security and data protection in cooperation (j b) promote data management, with relevant authorities and regulated cyber security and data protection entities;

    in cooperation with relevant authorities and regulated entities;

  • 498. 
    AM 122 Provisionally agreed:

    Article 27 – paragraph 1 – point j c (new) (j c) develop take into account the (j c) develop demand response in development of demand response in cooperation with DSOs. fulfilling its tasks;

  • 499. 
    2. The ENTSO for AM 123 2. The ENTSO for Maintain Council GA

    Electricity shall report to the 2. The ENTSO for Electricity Electricity shall report to the Agency on shortcomings shall report to the Agency on Agency on shortcomings identified regarding the shortcomings identified regarding identified regarding the establishment and performance the establishment and performance establishment and performance of regional operational centres. of regional coordination centres. of [ ] Regional Security Coordinators.

  • 500. 
    3. The ENTSO for 3. The ENTSO for No change

    Electricity shall publish the Electricity shall publish the 3. The ENTSO for Electricity shall minutes of its Assembly, Board minutes of its Assembly, Board publish the minutes of its Assembly, Board and Committees meetings and and Committees meetings and and Committees meetings and provide the provide the public with regular provide the public with regular public with regular information on its information on its decisioninformation on its decisiondecision-making and activities. making and activities. making and activities.

ANNEX I TREE.2.B EN

  • 501. 
    4. The annual work 4. The annual work No change programme referred to in (h) of programme referred to in (h) of 4. The annual work programme referred paragraph 1 shall contain a list paragraph 1 shall contain a list to in (h) of paragraph 1 shall contain a list and description of the network and description of the network and description of the network codes to be codes to be prepared, a plan on codes to be prepared, a plan on prepared, a plan on coordination of operation coordination of operation of the coordination of operation of the of the network, and research and network, and research and network, and research and development activities, to be realised in that development activities, to be development activities, to be year, and an indicative calendar. realised in that year, and an realised in that year, and an

    indicative calendar. indicative calendar. 502. 5. The ENTSO for 5. The ENTSO for No change

    Electricity shall make available Electricity shall make available 5. The ENTSO for Electricity shall make all information required by the all information required by the available all information required by the Agency to fulfil its tasks under Agency to fulfil its tasks under Agency to fulfil its tasks under Article Article 29(1). Transmission Article 29(1). Transmission 29(1). Transmission system operators shall system operators shall make system operators shall make make available all information required for available all information available all information the ENTSO for Electricity to fulfil its task required for the ENTSO for required for the ENTSO for under sentence 1. Electricity to fulfil its task Electricity to fulfil its task under under sentence 1. sentence 1.

  • 503. 
    6. Upon request of the 6. Upon request of the No change

    Commission, the ENTSO for Commission, the ENTSO for 6. Upon request of the Commission, the Electricity shall give its views Electricity shall give its views to ENTSO for Electricity shall give its views to to the Commission on the the Commission on the adoption the Commission on the adoption of the adoption of the guidelines as of the guidelines as laid down in guidelines as laid down in Article 57. laid down in Article 57. Article 57.

ANNEX I TREE.2.B EN

  • 504. 
    Article 28

    Consultations

  • 505. 
    1. While preparing the AM 124 1. While preparing the Provisionally agreed:

    proposals pursuant to the tasks 1. While preparing the proposals pursuant to the tasks referred to in Article 27(1) , the proposals pursuant to the tasks referred to in Article 27(1), the 1. While preparing the proposals ENTSO for Electricity shall referred to in Article 27(1), the ENTSO for Electricity shall pursuant to the tasks referred to in Article conduct an extensive ENTSO for Electricity shall conduct an extensive 27(1), the ENTSO for Electricity shall consultation process, at an early conduct an extensive consultation consultation process, at an early conduct an extensive consultation process, at stage and in an open and process, at an early stage and stage and in an open and an early stage and structured in a way to transparent manner, involving structured in a way to enable transparent manner, involving enable accommodating stakeholder all relevant stakeholders , and, accommodating stakeholder all relevant stakeholders, and, in comments before final adoption and in an in particular, the organisations comments before final adoption particular, the organisations open and transparent manner, involving all representing all stakeholders, in and in an open and transparent representing all stakeholders, in relevant stakeholders, and, in particular, the accordance with the rules of manner, involving all relevant accordance with the rules of organisations representing all stakeholders, procedure referred to in Article stakeholders, and, in particular, the procedure referred to in Article in accordance with the rules of procedure 26 . That consultation shall also organisations representing all 26. That consultation shall also referred to in Article 26 . That consultation involve national regulatory stakeholders, in accordance with involve national regulatory shall also involve national regulatory authorities and other national the rules of procedure referred to in authorities and other national authorities and other national authorities, authorities, supply and Article 26 . That consultation shall authorities, supply and supply and generation undertakings, system generation undertakings, system also involve national regulatory generation undertakings, system users including customers and their users including customers, authorities and other national users including customers, representatives, distribution system distribution system operators, authorities, supply and generation distribution system operators, operators, including relevant industry including relevant industry undertakings, system users including relevant industry associations, technical bodies and associations, technical bodies including customers and their associations, technical bodies stakeholder platforms. It shall aim at and stakeholder platforms. It representatives, distribution system and stakeholder platforms. It identifying the views and proposals of all shall aim at identifying the operators, including relevant shall aim at identifying the relevant parties during the decision-making views and proposals of all industry associations, technical views and proposals of all process. relevant parties during the bodies and stakeholder platforms. relevant parties during the decision-making process. It shall aim at identifying the views decision-making process. and proposals of all relevant parties during the decision-making process.

ANNEX I TREE.2.B EN

  • 506. 
    2. All documents and 2. All documents and No change minutes of meetings related to minutes of meetings related to 2. All documents and minutes of the consultations referred to in the consultations referred to in meetings related to the consultations referred paragraph 1 shall be made paragraph 1 shall be made to in paragraph 1 shall be made public. public. public.
  • 507. 
    3. Before adopting the 3. Before adopting the No change proposals pursuant to Article proposals pursuant to Article 3. Before adopting the proposals 27(1) the ENTSO for 27(1) the ENTSO for Electricity pursuant to Article 27(1) the ENTSO for Electricity shall indicate how shall indicate how the Electricity shall indicate how the the observations received observations received during the observations received during the consultation during the consultation have consultation have been taken have been taken into consideration. It shall been taken into consideration. It into consideration. It shall provide reasons where observations have not shall provide reasons where provide reasons where been taken into account observations have not been observations have not been

    taken into account. taken into account.

  • 508. 
    Article 29

    Monitoring by the Agency

  • 509. 
    1. The Agency shall 1. The Agency shall monitor No change monitor the execution of the the execution of the tasks 1. The Agency shall monitor the tasks referred to in Article referred to in Article 27(1), (2) execution of the tasks referred to in Article 27(1), (2) and (3) of the and (3) of the ENTSO for 27(1), (2) and (3) of the ENTSO for ENTSO for Electricity and Electricity and report to the Electricity and report to the Commission. report to the Commission. Commission.

ANNEX I TREE.2.B EN

  • 510. 
    The Agency shall monitor the The Agency shall monitor the No change implementation by the ENTSO implementation by the ENTSO The Agency shall monitor the for Electricity of network codes for Electricity of network codes implementation by the ENTSO for elaborated under Article 55(14) elaborated under Article 55(14). Electricity of network codes elaborated . Where the ENTSO for Where the ENTSO for under Article 55(14). Where the ENTSO for Electricity has failed to Electricity has failed to Electricity has failed to implement such implement such network codes, implement such network codes, network codes, the Agency shall request the the Agency shall request the the Agency shall request the ENTSO for Electricity to provide a duly ENTSO for Electricity to ENTSO for Electricity to reasoned explanation as to why it has failed provide a duly reasoned provide a duly reasoned to do so. The Agency shall inform the explanation as to why it has explanation as to why it has Commission of that explanation and provide failed to do so. The Agency failed to do so. The Agency shall its opinion thereon. shall inform the Commission of inform the Commission of that

    that explanation and provide its explanation and provide its opinion thereon. opinion thereon.

  • 511. 
    The Agency shall monitor and The Agency shall monitor and No change analyse the implementation of analyse the implementation of The Agency shall monitor and analyse the the network codes and the the network codes and the implementation of the network codes and the guidelines adopted by the guidelines adopted by the guidelines adopted by the Commission as Commission as laid down in Commission as laid down in laid down in Article 54(1), and their effect Article 54(1) , and their effect Article 54(1), and their effect on on the harmonisation of applicable rules on the harmonisation of the harmonisation of applicable aimed at facilitating market integration as applicable rules aimed at rules aimed at facilitating market well as on non-discrimination, effective facilitating market integration integration as well as on noncompetition and the efficient functioning of as well as on nondiscrimination, effective the market, and report to the Commission. discrimination, effective competition and the efficient

    competition and the efficient functioning of the market, and functioning of the market, and report to the Commission. report to the Commission.

ANNEX I TREE.2.B EN

  • 512. 
    2. The ENTSO for 2. The ENTSO for No change

Electricity shall submit the draft Electricity shall submit the draft 2. The ENTSO for Electricity shall

Union-wide network Union-wide network submit the draft Union-wide network

development plan, the draft development plan, the draft development plan, the draft annual work

annual work programme, annual work programme, programme, including the information

including the information including the information regarding the consultation process, and the

regarding the consultation regarding the consultation other documents referred to in Article 27(1)

process, and the other process, and the other to the Agency for its opinion.

documents referred to in Article documents referred to in Article

27(1) to the Agency for its 27(1) to the Agency for its

opinion. opinion.

  • 513. 
    Within two months from the Within two months from the day No change

day of receipt, the Agency shall of receipt, the Agency shall Within two months from the day of receipt,

provide a duly reasoned opinion provide a duly reasoned opinion the Agency shall provide a duly reasoned

as well as recommendations to as well as recommendations to opinion as well as recommendations to the

the ENTSO for Electricity and the ENTSO for Electricity and to ENTSO for Electricity and to the

to the Commission where it the Commission where it Commission where it considers that the draft

considers that the draft annual considers that the draft annual annual work programme or the draft Unionwork

programme or the draft work programme or the draft wide network development plan submitted

Union-wide network Union-wide network by the ENTSO for Electricity do not

development plan submitted by development plan submitted by contribute to non-discrimination, effective

the ENTSO for Electricity do the ENTSO for Electricity do competition, the efficient functioning of the

not contribute to nonnot contribute to nonmarket or a sufficient level of cross-border

discrimination, effective discrimination, effective interconnection open to third-party access.

competition, the efficient competition, the efficient

functioning of the market or a functioning of the market or a

sufficient level of cross-border sufficient level of cross-border

interconnection open to thirdinterconnection open to thirdparty

access. party access.

ANNEX I TREE.2.B EN

  • 514. 
    Article 30

    Costs

  • 515. 
    The costs related to the The costs related to the activities No change activities of the ENTSO for of the ENTSO for Electricity The costs related to the activities of the Electricity referred to in referred to in Articles 25 to 29 ENTSO for Electricity referred to in Articles Articles 25 to 29 and 54 to 57 and 54 to 57 of this Regulation, 25 to 29 and 54 to 57 of this Regulation, and of this Regulation, and in and in Article 11 of Regulation in Article 11 of Regulation (EU) No Article 11 of Regulation (EU) (EU) No 347/2013 shall be 347/2013 shall be borne by the transmission No 347/2013 shall be borne by borne by the transmission system operators and shall be taken into the transmission system system operators and shall be account in the calculation of tariffs. operators and shall be taken taken into account in the Regulatory authorities shall approve those into account in the calculation calculation of tariffs. Regulatory costs only if they are reasonable and of tariffs. Regulatory authorities authorities shall approve those appropriate. shall approve those costs only if costs only if they are reasonable

    they are reasonable and and appropriate. appropriate.

ANNEX I TREE.2.B EN

  • 516. 
    Article 31

    Regional cooperation of transmission system operators

  • 517. 
    1. Transmission system 1. Transmission system No change operators shall establish operators shall establish regional 1. Transmission system operators shall regional cooperation within the cooperation within the ENTSO establish regional cooperation within the ENTSO for Electricity to for Electricity to contribute to ENTSO for Electricity to contribute to the contribute to the activities the activities referred to in activities referred to in Article 27(1), (2) and referred to in Article 27(1), (2) Article 27(1), (2) and (3). In (3). In particular, they shall publish a and (3). In particular, they shall particular, they shall publish a regional investment plan every two years, publish a regional investment regional investment plan every and may take investment decisions based on plan every two years, and may two years, and may take that regional investment plan. The ENTSO take investment decisions based investment decisions based on for Electricity shall promote cooperation on that regional investment that regional investment plan. between transmission system operators at plan. The ENTSO for The ENTSO for Electricity shall regional level ensuring interoperability, Electricity shall promote promote cooperation between communication and monitoring of regional cooperation between transmission system operators at performance in those areas which are not yet transmission system operators regional level ensuring harmonised at Union level. at regional level ensuring interoperability, communication

    interoperability, communication and monitoring of regional and monitoring of regional performance in those areas performance in those areas which are not yet harmonised at which are not yet harmonised at Union level. Union level.

ANNEX I TREE.2.B EN

  • 518. 
    2. Transmission system 2. Transmission system No change operators shall promote operators shall promote 2. Transmission system operators shall operational arrangements in operational arrangements in promote operational arrangements in order to order to ensure the optimum order to ensure the optimum ensure the optimum management of the management of the network and management of the network and network and shall promote the development shall promote the development shall promote the development of energy exchanges, the coordinated of energy exchanges, the of energy exchanges, the allocation of cross-border capacity through coordinated allocation of crosscoordinated allocation of crossnon-discriminatory market-based solutions, border capacity through nonborder capacity through nonpaying due attention to the specific merits of discriminatory market-based discriminatory market-based implicit auctions for short-term allocations, solutions, paying due attention solutions, paying due attention and the integration of balancing and reserve to the specific merits of implicit to the specific merits of implicit power mechanisms.

    auctions for short-term auctions for short-term allocations, and the integration allocations, and the integration of balancing and reserve power of balancing and reserve power mechanisms. mechanisms.

  • 519. 
    3. For the purposes of AM 125 3. For the purposes of Maintain Council GA achieving the goals set in 3. For the purposes of achieving the goals set in

    paragraphs 1 and 2 of this achieving the goals set in paragraphs 1 and 2 of this Article, the geographical area paragraphs 1 and 2 of this Article, Article, the geographical area covered by each regional the geographical area covered by covered by each regional cooperation structure may be each regional cooperation structure cooperation structure may be defined by the Commission, may be defined by the defined by the Commission, taking into account existing Commission, taking into account taking into account existing regional cooperation structures. existing regional cooperation regional cooperation structures. Each Member State shall be structures. Each Member State Each Member State shall be allowed to promote cooperation shall be allowed to promote allowed to promote cooperation in more than one geographical cooperation in more than one in more than one geographical area. The Commission is geographical area. The area. The Commission is empowered to adopt delegated Commission is empowered to empowered to adopt [ ] acts in accordance with Article adopt delegated acts in accordance implementing acts in 63 concerning the geographical with Article 63 concerning the accordance with Article [ ] area covered by each regional geographical area covered by each 62(2) concerning the cooperation structure. For that regional cooperation structure. For geographical area covered by purpose, the Commission shall that purpose, the Commission shall each regional cooperation consult the Agency and the consult the regulatory authorities, structure. The decisions and

ANNEX I TREE.2.B EN

ENTSO for Electricity. the Agency and the ENTSO for empowerment referred to in Electricity. this paragraph are without prejudice to Article 33 and shall be subject to

consultations. For that purpose, the Commission shall consult the Agency and the ENTSO for Electricity.

  • 520. 
    Article 32 Article 32 Provisionally agreed:

    Establishment and mission of Establishment and mission of [ ] Article 32 regional operational centres Regional Security Coordinators Establishment and mission of Regional Coordination Centres

  • 521. 
    1. By [OP: twelve months AM 126 1. By [OP: twelve months Provisionally agreed: after entry into force], all 1. By [OP: twelve months after after entry into force], all

    transmission system operators entry into force], regional transmission system operators of 1. By [OP: twelve months after entry into shall establish regional coordination centres shall in a [ ] system operation region force], all transmission system operators of a operational centres in addition to other tasks that are shall submit a proposal for the system operation region shall submit to accordance with the criteria set laid out in Article 34 of this enhancement of Regional the respective regulatory authorities a out in this chapter. Regional Regulation, replace and cover the Security Coordinators proposal for the establishment of Regional operational centres shall be functions of regional security established pursuant to the Coordination Centres in accordance with established in the territory of coordinators established in System Operation Guideline the criteria set out in this chapter. one of the Member States of the accordance with the adopted on the basis of Article region where it will operate. Regulation...[the Commission 18 of Regulation 714/2009 i for Regulation establishing a approval by the respective guideline on Electricity regulatory authorities. Transmission System Operation] pursuant to the criteria set out in this chapter.

ANNEX I TREE.2.B EN

  • 522. 
    If a region is not covered by an Provisionally agreed to delete, and introduce existing or a planned regional a new recital (line 46)

    security coordinator, the transmission system operators of that region shall establish a regional coordination centre.

  • 523. 
    All transmission system operators Provisionally agreed to delete, in line with shall adhere to a single regional the compromise in line 542

    coordination centre. 524. All transmission system operators Provisionally agreed to delete

    of a system operation region shall submit to the regulatory authorities of the system operation region for a review a proposal for the establishment of regional coordination centres in accordance with the criteria set out in this chapter.

  • 525. 
    The regulatory authorities of the Provisionally agreed: system operation region shall The regulatory authorities of the system review and approve the proposal operation region shall review and approve in compliance with the procedures the proposal in compliance with the established pursuant to Article 8 procedures established pursuant to Article 8 of Regulation (EU) ... [recast of of Regulation (EU) ... [recast of Regulation Regulation (EC) No 713/2009 i as (EC) No 713/2009 as proposed by proposed by COM(2016) 863 i] COM(2016) 863 i]
  • 526. 
    The proposals referred to the forth The proposal shall contain the Provisionally agreed: subparagraph shall include the following elements: The proposal shall at least include the following information: following elements:

ANNEX I TREE.2.B EN

  • 527. 
    (a) Member State where the a) the participating Provisionally agreed: regional coordination centre are Member States and TSOs;

    to be located; a) the participating Member State where the seat of the Regional Coordination

    Centres will be located and the participating TSOs;

  • 528. 
    (b) the organisational, financial b) the organisational, Provisionally agreed: (identical texts) and operational arrangements financial and operational b) the organisational, financial and necessary to ensure the efficient, arrangements necessary to operational arrangements necessary to secure and reliable operation of ensure the efficient, secure and ensure the efficient, secure and reliable the interconnected transmission reliable operation of the operation of the interconnected

    system; interconnected transmission transmission system; system;

  • 529. 
    (c) an implementation plan for the c) an implementation plan Provisionally agreed: (identical texts) entry into operation of the for the entry into operation of c) an implementation plan for the regional coordination centres; the Regional Security entry into operation of the Regional Coordinators; Coordination Centres
  • 530. 
    (d) the statutes and rules of d) the statutes and rules of Provisionally agreed: (identical texts) procedure of regional procedure of Regional d) the statutes and rules of procedure coordination centres; Security Coordinators; of Regional Coordination Centres
  • 531. 
    (e) a description of cooperative e) a description of Provisionally agreed: (identical texts) processes in accordance with cooperative processes in e) a description of cooperative

    Article 35; accordance with Article 35; processes in accordance with Article 35; 532. (f) a description of the f) a description of the Provisionally agreed: (identical texts)

    arrangements concerning the arrangements concerning the f) a description of the arrangements liability of regional coordination liability of Regional Security concerning the liability of Regional centres in accordance with Article Coordinators in accordance Coordination Centres in accordance with 44. with Article 44. Article 44.

ANNEX I TREE.2.B EN

532a. Provisionally agreed: g) (new) where two Regional Coordination Centres are maintained on a rotational basis, a description of the arrangements to provide clear responsibilities and procedures on the execution of their tasks.

  • 533. 
    2. Regional operational 2. [ ] Regional Security Provisionally agreed: centres shall be organised in a Coordinators shall be

    legal form as referred to in established in the system 2. Regional Coordination Centres shall be Article 1 of Directive operation region where it will established in the system operation region 2009/101/EC of the European carry out its tasks and shall be where it will carry out its tasks and shall Parliament and of the Council. 25 organised in a legal form as be organised in a legal form as referred to in referred to in [ ] Annex II of [ ] Annex II of Directive [ ] (EU) Directive [ ] (EU) 2017/1132 2017/1132 of the European Parliament and of the European Parliament and of the Council 27 . of the Council 26 .

  • 534. 
    AM 127 Provisionally agreed:

    Article 32 – paragraph 1 a (new) 1a (new) Following the approval by 1 a. Regional coordination national regulatory authorities of the centres shall enter into operation proposal in paragraph 1, Regional by [OP: twelve months after entry Coordination Centres shall replace into force of this Regulation]. Regional Security Coordinators established pursuant to the System Operation Guideline adopted on the basis of Article 18 of Regulation 714/2009 i and enter into operation by 1 July 2022.

25 Directive 2009/101/EC i of the European Parliament and of the Council of 16 September 2009 on coordination of safeguards which, for the protection of the interests of members and third parties, are required by Member States of companies within the meaning of the second paragraph of Article 48 of the Treaty, with a view to making such safeguards equivalent (OJ L 258, 1.10.2009, p. 11).

26 Directive (EU) 2017/1132 of the European Parliament and of the Council of 14 June 2017 relating to certain aspects of company law (OJ L 169,

30.6.2017, p. 46). 27 Directive (EU) 2017/1132 of the European Parliament and of the Council of 14 June 2017 relating to certain aspects of company law (OJ L 169,

30.6.2017, p. 46).

ANNEX I TREE.2.B EN

  • 535. 
    AM 128 Provisionally agreed:

    Article 32 – paragraph 2 a (new) 2 a. In performing its functions 2 a. In performing its [ ] tasks under under Union law, the regional Union law, the Regional Coordination coordination centres shall act Centres shall act independently from independently from individual individual national interests and from the national interests and from the interests of transmission system operators. interests of transmission system operators.

  • 536. 
    3. Regional operational AM 129 3. [ ] Transmission system Provisionally agreed:

    centres shall complement the 3. Regional coordination operators shall be responsible role of transmission system centres shall complement the role for managing electricity flows Regional Coordination Centres shall operators by performing of transmission system operators and ensure a secure, reliable complement the role of transmission system functions of regional relevance. by performing functions of regional and efficient electricity system operators by performing the tasks of They shall establish operational relevance. The transmission system in accordance with Article 40 regional relevance assigned to them in arrangements in order to ensure operators shall be responsible for of the [recast of Directive accordance with Article 34. Transmission the efficient, secure and reliable managing electricity flows and 2009/72/EC as proposed by system operators shall be responsible for operation of the interconnected ensuring a secure, reliable and COM(2016) 864 i/2] and with managing electricity flows and ensuring a transmission system. efficient electricity system in national legislation. Regional secure, reliable and efficient electricity accordance with Article 40 of the Security Coordinators shall system in accordance with Article 40 of Directive (EU) [recast of Directive complement the role of the Directive (EU) [recast of Directive 2009/72/EC as proposed by transmission system operators 2009/72/EC as proposed by COM(2016) COM(2016) 864 i/2]. by performing [ ] tasks of 864/2]. regional relevance [ ] assigned to them in accordance with Article 34.

  • 537. 
    4a. Regional Security Provisionally agreed to delete.

    Coordinators shall take up their new tasks set out in [ ] Article 34(1) by 1 January 2025. All Member States of the same system operation region, can jointly decide on earlier operation of the respective Regional Security Coordinator [+].

ANNEX I TREE.2.B EN

  • 538. 
    Article 33 AM 130 Article 33 Provisionally agreed:

    Geographical scope of regional Article 33 – title Geographical scope of [ ] Article 33 operational centres Geographical scope of regional Regional Security Coordinators Geographical scope of Regional coordination centres Coordination Centres

  • 539. 
    0a. For the purpose of this Provisionally agreed to delete. This

    Regulation, the geographical paragraph is covered in row 541. areas covered by each of the

    transmission system operators [ ]

    sharing the same regional security coordinators established pursuant to the System Operation Guideline adopted on the basis of Article 18 of Regulation 714/2009 i shall be referred to as system operation regions.

  • 540. 
    0b. Regional security Provisionally agreed: coordinators may encompass

    larger or smaller geographical The concerned transmission system areas than those existing operators may submit a proposal to the pursuant to the System Agency for the amendment of system Operation Guideline adopted operation regions defined pursuant to on the basis of Article 18 of paragraph 1. The process in paragraph 2 Regulation 714/2009 i. In such shall apply. instance, the respective transmission system operators shall submit a proposal to the Agency defining the system operation regions covered by the Regional security coordinator.

ANNEX I TREE.2.B EN

  • 541. 
    1. By [OP: six months after AM 131

    entry into force of this 1. By [OP: six months after 1. By [OP: six months after

    Provisionally agreed:

    Regulation] the ENTSO for entry into force of this Regulation] entry into force of this Electricity shall submit to the the ENTSO for Electricity shall Regulation] the ENTSO for

    By [OP: six months after entry into force of

    Agency a proposal defining submit to the Agency a proposal Electricity shall submit to the

    this Regulation] the ENTSO for Electricity

    system operation regions defining system operation regions Agency a proposal [ ]

    shall submit to the Agency a proposal[ ] specifying which transmission system

    covered by regional operational covered by regional coordination specifying which transmission operators, bidding zones, bidding zone centres, taking into account centres, taking into account system operators, bidding borders, capacity calculation regions and existing regional security existing regional security zones, bidding zone borders, outage coordination regions are covered coordinators, on the basis of the coordinators, on the basis of the capacity calculation regions by each of the system operation regions.

    following criteria: following criteria: and outage coordination regions are covered by each of The proposal shall take into account the

    the system operation regions. grid topology, including the degree of interconnection and of interdependency of

    the power system in terms of flows and the size of the region which shall cover at least one capacity calculation region.

  • 542. 
    1a. Where a Member State Provisionally agreed: is part of multiple different 1a. The transmission system operators of a synchronous areas, the system operation region shall adhere to transmission system operator the Regional Coordination Centres may be coordinated by two established in that region. regional security coordinators. Exceptionally, where the control area of a For the bidding zone borders transmission system operator is part of adjacent to system operation multiple different synchronous areas, the regions, the proposal in transmission system operator may be paragraph 1 shall specify how coordinated by two Regional the coordination between Coordination Centres. For the bidding regional security coordinators zone borders adjacent to system operation for these borders is to take regions, the proposal in paragraph 1 shall place. specify how the coordination between Regional Coordination Centres for these borders is to take place. For the Continental Europe synchronous area, where the activities of two Regional Coordination Centres may overlap in a

ANNEX I TREE.2.B EN

system operation region, the TSOs of that system operation region shall decide to either designate a single Regional Coordination Centre in that region or that the two Regional Coordination Centres perform some or all of the tasks of regional relevance in the entire system operation region on a rotational basis and other tasks by a single designated Regional Coordination Centre.

  • 543. 
    1b. Each of the Regional

    Security Coordinators shall Provisionally agreed to delete perform the tasks listed in Article 34(1) for the [ ] transmission system operators of the system operation region where it is established.

ANNEX I TREE.2.B EN

  • 544. 
    (a) The grid topology, [ ] Provisionally agreed to delete including the degree of

    interconnection and of [ ] interdependency of the power systems in terms of flows;

  • 545. 
    (b) the synchronous [ ] Provisionally agreed to delete connection of the systems;

    [ ]

  • 546. 
    (c) the size of the region, [ ] Provisionally agreed to delete which shall cover at least one

    capacity calculation region; [ ]

  • 547. 
    (d) the geographical [ ] Provisionally agreed to delete optimization of balancing

    reserves. [ ]

  • 548. 
    2. Within three months of 2. Within three months of Provisionally agreed: receipt, the Agency shall either receipt of the proposal in

    approve the proposal defining paragraph 1, the Agency shall 2. Within three months of receipt of the the system operation regions or either approve the proposal proposal in paragraph [1], the Agency propose amendments. In the defining the system operation shall either approve the proposal [ ] or latter case, the Agency shall regions or propose amendments. propose amendments. In the latter case, the consult the ENTSO for In the latter case, the Agency Agency shall consult the ENTSO for Electricity before adopting the shall consult the ENTSO for Electricity before adopting the amendments. amendments. The adopted Electricity before adopting the The adopted proposal shall be published on proposal shall be published on amendments. The adopted the Agency's website. the Agency's website. proposal shall be published on the Agency's website.

ANNEX I TREE.2.B EN

  • 549. 
    Article 34 AM 132 Article 34 Provisionally agreed:

    Tasks of regional operational Article 34 – title Tasks of [ ] Regional Security Article 34 centres Tasks of regional coordination Coordinators Tasks of Regional Coordination Centres centres

  • 550. 
    1. Each regional operational AM 133 1. Each Regional [ ] Provisionally agreed:

    centre shall perform all the 1. Each regional coordination security coordinator shall following functions in the centre shall perform all the perform [ ] the following [ ] 1. Each Regional Coordination Centre system operation region where following functions in the system tasks of regional relevance for shall perform at least all the following tasks it is established and regional operation region where it is transmission system operators of regional relevance for transmission operational centres shall established and regional in the system operation region [ system operators in the entire system perform at least the following coordination centres shall perform ] set out in more detail in Annex operation region where it is established, set functions, set out in more detail at least the following functions, set I: out in more detail in Annex I: in Annex I: out in more detail in Annex I:

  • 551. 
    (a) coordinated capacity (a) coordinated capacity (a) coordinated capacity Maintain Council GA calculation; calculation in accordance with the calculation in accordance with (no agreement on the reference to the methodologies developed pursuant the methodologies developed Guideline)

    to Articles 21, 26, 29 and 30 of pursuant to the Capacity Regulation (EU) 2015/1222; Allocation and Congestion Management Guideline adopted on the basis of Article 18 of Regulation 714/2009 i;

  • 552. 
    (b) coordinated security (b) coordinated security analysis (b) coordinated security Maintain Council GA analysis; in accordance with the analysis in accordance with the (no agreement on the reference to the methodologies developed pursuant methodologies developed Guideline)

    to Articles 75 and 76 of pursuant to the System Commission Regulation (EU) Operation Guideline adopted 2017/1485 1a ; on the basis of Article 18 of

    1a

     Commission Regulation (EU) Regulation 714/2009 i; 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (OJ L 220, 25.8.2017, p.

    1).

ANNEX I TREE.2.B EN

  • 553. 
    (c) creation of common (c) creation of common system (c) creation of common [ ] Maintain Council GA system models; models in accordance with the grid models in accordance with (no agreement on the reference to the methodologies and procedures the methodologies and Guideline)

    developed pursuant to Articles 67, procedures developed 70 and 79 of Commission pursuant to the System Regulation (EU) 2017/1485; Operation Guideline adopted on the basis of Article 18 of Regulation 714/2009 i;

  • 554. 
    (d) consistency assessment (d) consistency assessment of (d) support the consistency Maintain Council GA of transmission system transmission system operators' assessment of transmission (no agreement on the reference to the operators' defense plans and defense plans and restoration plans system operators' defence plans Guideline)

    restoration plans; in accordance with the procedure and restoration plans in set out in Article 6 of Commission accordance with the procedure Regulation (EU) 2017/2196 b ; set out in the Emergency and 1b Commission Regulation (EU) Restoration Network Code 2017/2196 of 24 November 2017 adopted on the basis of Article establishing a network code on 6 of Regulation 714/2009 i; electricity emergency and

    restoration (OJ L 312, 28.11.2017, p. 54)

  • 555. 
    (da) regional week ahead to Provisionally agreed to modified EP text, day-ahead system adequacy and to adapt it after conclusion of

    forecasts and assessments of negotiations on the Risk preparedness risk reducing actions in regulation:

    accordance with the

    procedures set out in the (da) regional week ahead to [day-ahead / System Operation Guideline intraday] system adequacy forecasts and adopted on the basis of Article preparation assessments of risk reducing 18 of Regulation 714/2009 i; actions in accordance with the

    methodology set out in Article 8 of Regulation (EU) [Regulation on risk preparedness as proposed by COM(2016)862 i] and the procedures set out in the System Operation Guideline adopted on the basis of Article 18 of Regulation 714/2009 i;

ANNEX I TREE.2.B EN

  • 556. 
    (db) regional outage planning Provisionally agreed (Without the agreement coordination in accordance on the reference to the Guideline, which will with the procedures set out in be decided horizontally)

    the System Operation (db) regional outage planning Guideline adopted on the basis coordination in accordance with the of Article 18 of Regulation procedures set out in the System 714/2009; Operation Guideline adopted on the basis of Article 18 of Regulation 714/2009 i;

  • 557. 
    (dc) training and Provisionally agreed: certification of staff working (dc) training and certification of staff for Regional Security working for Regional Coordination Coordinators[+]; Centres;
  • 558. 
    (e) coordination and (e) support the coordination Provisionally agreed: optimization of regional and optimization of regional (e) support the coordination and restoration; restoration as requested by optimization of regional restoration as transmission system operators; requested by transmission system operators;
  • 559. 
    (f) post-operation and post(f) post-operation and post No change: disturbances analysis and disturbances analysis and (f) post-operation and post-disturbances reporting; reporting; analysis and reporting;
  • 560. 
    (g) regional sizing of reserve [ ] Provisionally agreed (revert to original capacity; COM proposal):

    (g) regional sizing of reserve capacity;

  • 561. 
    (h) facilitate the regional (h) calculation of the regional [ ] Provisionally agreed (revert to original procurement of balancing balancing capacity; COM proposal):

    capacity; (h) facilitate the regional procurement of balancing capacity;

ANNEX I TREE.2.B EN

  • 562. 
    (i) regional week ahead to (i) regional week ahead to [ ] Provisionally agreed: intraday system adequacy intraday system adequacy forecasts [ ]

    forecasts and preparation of risk and preparation of risk reducing reducing actions; actions in accordance with the (included in line 555) methodology set out in Article 8 of Regulation (EU) ... [Regulation on risk preparedness as proposed by COM(2016) 862 i] and the procedures set out in Article 81 of Commission Regulation (EU) 2017/1485[The Commission Regulation establishing a Guideline on electricity transmission system operation];

  • 563. 
    (j) outage planning (j) outage planning coordination [ ] Provisionally agreed: coordination; in accordance with the procedures [ ]

    set out in Article 80 of Commission Regulation (EU) (included in line 556) 2017/1485 ;

  • 564. 
    (k) optimisation of (k) optimisation of [ ] Provisionally agreed: compensation mechanisms compensation mechanisms between (k) Support transmission system between transmission system transmission system operators; operators, at their request, in the operators; optimization of inter- transmission system operators settlements
  • 565. 
    (l) training and certification; (l) training and certification; [ ] Provisionally agreed (covered by line 557):

    [ ]

  • 566. 
    (m) identification of regional deleted (m) identification of regional Provisionally agreed: crisis scenarios according to crisis scenarios if and to the (m) identification of regional crisis Article 6(1) of [Regulation on extent they are requested scenarios if and to the extent they are risk preparedness as proposed pursuant to Article 6(1) of requested pursuant to Article 6(1) of by COM(2016) 862 i] if this task [Regulation on risk preparedness [Regulation on risk preparedness as proposed is delegated by ENTSO for as proposed by COM(2016) 862 i; by COM(2016) 862 i; Electricity;

ANNEX I TREE.2.B EN

  • 567. 
    (n) preparation and carrying (n) preparation and carrying No change out of yearly crisis simulations out of yearly crisis simulations

    in cooperation with competent in cooperation with competent (n) preparation and carrying out of yearly authorities pursuant to Article authorities pursuant to Article crisis simulations in cooperation with 12(3) of [Regulation on risk 12(3) of [Regulation on risk competent authorities pursuant to Article preparedness as proposed by preparedness as proposed by 12(3) of [Regulation on risk preparedness as COM(2016) 862 i]; COM(2016) 862 i]; proposed by COM(2016) 862 i];

  • 568. 
    (o) tasks related to the (o) tasks related to the [ ] Provisionally agreed: identification of regional crisis identification of regional crisis [ ]

    scenarios if and to the extent scenarios if and to the extent they they are delegated to the are delegated to the regional regional operational centres coordination centres pursuant to pursuant to Article 6(1) of Article 6(1) of [Regulation on risk [Regulation on risk preparedness as proposed by preparedness as proposed by COM(2016) 862 i]; COM(2016) 862 i];

  • 569. 
    (p) tasks related to the (p) tasks related to the seasonal (p) tasks related to the Provisionally agreed: seasonal adequacy outlooks if adequacy outlooks if and to the seasonal adequacy outlooks if (p) tasks related to the seasonal adequacy and to the extent they are extent they are delegated to the and to the extent they are outlooks if and to the extent they are delegated to the regional regional coordination centres requested [ ] pursuant to Article delegated to the regional coordination operational centres pursuant to pursuant to Article 9(2) of 9([ ] 3) of [Regulation on risk centres pursuant to Article 9(2) of Article 9(2) of [Regulation on [Regulation on risk preparedness as preparedness as proposed by [Regulation on risk preparedness as proposed risk preparedness as proposed proposed by COM(2016) 862 i]; COM(2016) 862 i]; by COM(2016) 862 i]; by COM(2016) 862 i];
  • 570. 
    (q) calculate the maximum (q) calculate the value for Provisionally agreed: entry capacity available for the the maximum entry capacity

    participation of foreign capacity available for the participation of (q) calculate the value for the maximum in capacity mechanisms foreign capacity in capacity entry capacity available for the participation pursuant to Article 21(6). mechanisms [ ] for the purpose of foreign capacity in capacity mechanisms [ to issue an recommendation ] for the purposes to of issue issuing an pursuant to Article 21(6). recommendation pursuant to Article 21(6).

ANNEX I TREE.2.B EN

  • 571. 
    (qa) tasks related to support Provisionally agreed: transmission system operators in (qa) tasks related to support transmission the identification of needs for new system operators in the identification of capacity, for upgrade of existing needs for new transmission capacity, for capacity or their alternatives, to be upgrade of existing transmission capacity submitted to the regional groups or their alternatives, to be submitted to the established pursuant to regional groups established pursuant to Regulation (EU) 347/2013 i and Regulation (EU) 347/2013 i and included in included in the ten-year network the ten-year network development plan development plan referred to in referred to in Article 51 of the Directive Article 51 of the Directive (EU) ... (EU) ... [recast of Directive 2009/72/EC i as [recast of Directive 2009/72/EC i as proposed by COM(2016) 864 i/2]. proposed by COM(2016) 864 i/2].
  • 572. 
    2. The Commission may AM 134 2. [ ] Provisionally agreed: add other functions to the 2. The Commission may add Upon joint proposal of (Exact wording still to be finalised) regional operational centres, not other functions to the regional regulatory authorities,

involving decision making coordination centres, not involving following consultation with the [Upon a request by the European

power, pursuant to Chapter VII decision making power, pursuant to transmission system operators Commission or by a Member State, the

of this Regulation. Chapter VII of this Regulation. and the Regional Security Electricity Cross-Border Committee set

Coordinators, the Member up pursuant to Article 62(1) shall issue an

States of the system operation opinion on the assignation of new advisory

region may jointly decide to tasks to the regional coordination centres.

provide for additional

advisory coordination tasks, Where the Electricity Cross-Border

on the basis of which Regional Committee has issued an opinion in

Security Coordinators will favour of assigning new advisory tasks to

issue recommendations the regional coordination centres, the

pursuant to Article 38. In such Commission, taking into account the

instance, Regional Security opinion of the Electricity Cross-Border

Coordinators shall execute Committee, may, by means of

those tasks on the basis of the implementing act, assign advisory tasks to

methodologies drafted by the regional coordination centres.]

transmission system operators

and agreed by the relevant

regulatory authorities.

ANNEX I TREE.2.B EN

  • 573. 
    3. Transmission system AM 135 3. Transmission system Provisionally agreed: operators shall provide their 3. Transmission system operators shall provide their [ ] 3. Transmission system operators shall regional operational centre with operators shall provide their Regional Security provide their Regional Coordination the information necessary to regional coordination centre with Coordinators with the Centres with the information necessary to carry out its functions. the information necessary to carry information necessary to carry carry out its [ ] tasks. out its functions. out its [ ] tasks.
  • 574. 
    4. Regional operational AM 136 4. [ ] Regional Security Provisionally agreed: centres shall provide 4. Regional coordination Coordinators shall provide 4. Regional Coordination Centres shall transmission system operators centres shall provide transmission transmission system operators of provide transmission system operators of the of the system operation region system operators of the system the system operation region with system operation region with all the with all the information operation region with all the all the information necessary to information necessary to implement the [ ] necessary to implement the information necessary to ensure implement the [ ] coordinated coordinated actions and recommendations decisions and recommendations system stability and security of actions and recommendations proposed by the Regional Coordination proposed by the regional supply. proposed by the [ ] Regional Centres.

    operational centres. Security Coordinators. 575. For the functions set out in this Provisionally agreed:

    Article and not already covered by For the tasks set out in this Article and not the relevant guidelines, the already covered by the relevant network ENTSO for Electricity shall codes or guidelines, the ENTSO for develop a proposal in accordance Electricity shall develop a proposal in with the procedure set out in accordance with the procedure set out in Article 22. Regional coordination Article 22. Regional coordination centres centres shall execute those shall execute those functions on the basis of functions on the basis of a a proposal that has been approved by the proposal that has been approved Agency by the Agency.

ANNEX I TREE.2.B EN

  • 576. 
    Article 35 AM 137 Article 35 Provisionally agreed:

    Cooperation within regional Cooperation within and among Cooperation within [ ] and Article 35 operational centres regional coordination centres between Regional Security Cooperation within and between Regional Coordinators Coordination Centres

  • 577. 
    1. The day-to-day operation The day-to-day operation of 1. The day-to-day [ ] Provisionally agreed: of regional operational centres regional coordination centres shall coordination within and

    shall be managed through be managed through cooperative between Regional Security 1. The day-to-day [ ] coordination within cooperative decision-making. decision making amongst the Coordinators shall be managed and between Regional Coordination The cooperative-decision transmission system operators of through cooperative [ ] Centres shall be managed through making process shall be based the region, including processes [ ] based on: cooperative [ ] processes amongst the on: arrangements for coordination transmission system operators of the region, between regional coordination including arrangements for coordination centres where relevant. The between Regional Coordination Centres cooperative process shall be based where relevant. The cooperative process on: shall be based on:

  • 578. 
    (a) working arrangements to (a) working arrangements to Provisionally agreed: address planning and address planning and operational (a) working arrangements to address operational aspects related to aspects [ ] relevant for the planning and operational aspects [ ] the functions, in accordance tasks referred to in Article relevant for the tasks referred to in Article with Article 36; 34(1); 34(1);
  • 579. 
    (b) a procedure for (b) a procedure for consulting, (b) a procedure for sharing Provisionally agreed: consulting the transmission in an efficient and inclusive analysis and consulting (b) a procedure for sharing analysis and system operators of the system manner, the transmission system Regional Security consulting Regional Coordination Centres' operation region in the exercise operators and relevant Coordinators proposals with proposals with the transmission system of its operational duties and stakeholders of the system the transmission system operators of the system operation region and tasks, in accordance with operation region in accordance operators of the system relevant stakeholders, in an efficient and Article 37; with Article 37; operation region in the exercise inclusive manner, in the exercise of the of the operational duties and operational duties and tasks in accordance tasks in accordance with Article with Article 37 and with other Regional 37 and with other Regional Coordination Centres; Security Coordinators;

ANNEX I TREE.2.B EN

  • 580. 
    (c) a procedure for the (c) a procedure for the adoption (c) a procedure for the Provisionally agreed for Council text and adoption of decisions and and revision of decisions and adoption of [ ] coordinated amend line 530 (Article 32(1)(d)):

    recommendations in accordance recommendations in accordance actions and recommendations in with Article 38; with Article 38 that ensures accordance with Article 38; (c) a procedure for the adoption of equitable treatment between coordinated actions and recommendations members of the regional in accordance with Article 38; operational centre;

  • 581. 
    (d) a procedure for the deleted (d) a procedure for the Provisionally agreed to delete revision of decisions and revision of [ ] coordinated

    recommendations adopted by actions and recommendations [ regional operational centres in ] issued by Regional Security accordance with Article 39. Coordinators in accordance with Article 39.

  • 582. 
    Article 36

    Working arrangements

  • 583. 
    1. Regional operational AM 138 1. [ ] Regional Security Provisionally agreed: centres shall develop working 1. Regional coordination Coordinators shall develop

    arrangements to address centres shall develop working working arrangements to address 1. Regional Coordination Centres planning and operational arrangements that are efficient, planning and operational aspects shall develop working arrangements that are aspects related to the functions inclusive, transparent and related to the [ ] tasks to be efficient, inclusive, transparent and to be performed, taking into facilitate consensus, to address performed taking into account, facilitate consensus, to address planning and account, in particular, the planning and operational aspects in particular, the specificities operational aspects related to the [ ] tasks to specificities and requirements related to the functions to be and requirements of those [ ] be performed taking into account, in of those functions as specified performed, taking into account, in tasks as specified in Annex I. particular, the specificities and requirements in Annex I. particular, the specificities and Regional Security of those [ ] tasks as specified in Annex I. requirements of those functions as Coordinators shall also Regional Coordination Centres shall also specified in Annex I. develop a process for any develop a process for any revision of these revision of these working working arrangements. arrangements.

ANNEX I TREE.2.B EN

  • 584. 
    2. Regional operational AM 139 2. [ ] Regional Security Provisionally agreed: centres shall ensure that the 2. Regional coordination Coordinators shall ensure that 2. Regional Coordination Centres shall working arrangements contain centres shall ensure that the the working arrangements ensure that the working arrangements rules for the notification of working arrangements contain contain rules for the notification contain rules for the notification of parties parties concerned. rules for the notification of parties of parties concerned. concerned.

    concerned.

  • 585. 
    Article 37

    Consultation procedure

  • 586. 
    Regional operational centres AM 140 1. [ ] Regional Security Provisionally agreed: shall develop a procedure to Regional coordination centres Coordinators shall develop a 1. Regional Coordination Centres shall organise, in the exercise of their shall develop a procedure to procedure to organise, in the develop a procedure to organise, in the daily operational duties and organise, in the exercise of their exercise of their daily exercise of their daily operational duties and tasks, the appropriate and daily duties and tasks, the operational duties and tasks, the tasks, the appropriate and regular regular consultation of appropriate and regular appropriate and regular consultation of transmission system transmission system operators consultation of transmission system consultation of transmission operators of the system operation region, and of relevant stakeholders. In operators and of relevant system operators of the system other Regional Coordination Centres and order to ensure that regulatory stakeholders. In order to ensure that operation region, other of relevant stakeholders. In order to ensure issues can be addressed, regulatory issues can be addressed, Regional Security that regulatory issues can be addressed, regulatory authorities shall be regulatory authorities shall be Coordinators and of relevant regulatory authorities shall be involved when involved when required. involved when required. stakeholders. In order to ensure required.

    that regulatory issues can be addressed, regulatory authorities shall be involved when required.

ANNEX I TREE.2.B EN

  • 587. 
    2. If necessary, the Provisionally agreed:

    Regional Security Coordinators may consult the 2. If necessary, the Regional Member States of the system Coordination Centres may shall consult operation region and, where the Member States of the system applicable, their regional operation region and, where there is a forums on matters of political regional forum applicable, their regional relevance excluding the dayforums on matters of political relevance to-day activities of Regional excluding the day-to-day activities of Security Coordinators and the Regional Coordination Centres and the implementation of their tasks. implementation of their tasks. The The Regional Security Regional Coordination Centres shall take Coordinators shall take due due account of the recommendations given account of the by the Member States and where recommendations given by the applicable, by their regional forums. Member States and where applicable, by their regional forums.

ANNEX I TREE.2.B EN

  • 588. 
    AM 141 Provisionally agreed:

    Article 37 a (new) Article 37a Transparency Transparency 1. Regional Coordination Centres shall 1. Regional coordination organise a process for stakeholder centres shall organise a process involvement and organise regular meetings for stakeholder involvement and with stakeholders to discuss matters relating organise regular meetings with to the efficient, secure and reliable stakeholders to discuss matters operation of the interconnected system as relating to the efficient, secure well as to identify shortcomings and and reliable operation of the propose improvements; interconnected system as well as to identify shortcomings and propose improvements;

  • 589. 
    2. ENTSO for Electricity and Provisionally agreed: regional operational centres shall

    operate in full transparency 2. ENTSO for Electricity and Regional towards stakeholders and the Coordination Centres shall operate in full general public. All relevant transparency towards stakeholders and the documentation shall be published general public. All relevant documentation on the website of the respective shall be published on the website of regional coordination centre. This ENTSO-E and of the respective Regional paragraph shall apply to the Coordination Centre. proposals, justifications and decisions adopted pursuant to Articles 32 and 33, Article 35(a) and Article 38 of this Regulation.

ANNEX I TREE.2.B EN

  • 590. 
    Article 38 AM 142 Article 38 Provisionally agreed to merge articles 38

    Adoption of decisions and Article 38 – title [ ] Coordinated actions and and 39 recommendations Adoption and revisions of recommendations Adoption and revision of coordinated decisions and recommendations actions and recommendations

  • 591. 
    1. Regional operational AM 143 1. [ ] The transmission Provisionally agreed:

    centres shall develop a 1. The transmission system system operators of a system (Following adoption this will be paragraph 1 procedure for the adoption of operators of each regional operation region shall develop of the merged article) decisions and coordination centre shall develop a procedure for the adoption of [ 1. [ ] The transmission system recommendations. procedures for the adoption and ] coordinated actions and operators of a system operation region revision of decisions and recommendations put forward shall develop a procedure for the adoption recommendations that ensures by Regional Security and revision of coordinated actions and geographically balanced Coordinators in accordance recommendations put forward by Regional representation and equitable with the criteria set out in Coordination Centres in accordance with treatment of members of the paragraphs 2 to 4. the criteria set out in paragraphs 2 to 4. regional coordination centre.

  • 592. 
    2. Regional operational AM 144 2. [ ] Regional Security Provisionally agreed: centres shall adopt binding 2. Regional coordination Coordinators shall [ ] set-out (Following adoption this will be paragraph 2 decisions addressed to the centres shall adopt binding coordinated actions addressed of the merged article) transmission system operators decisions addressed to the to the transmission system The reference to System Operation Guideline in respect of the functions transmission system operators in operators in respect of the [ ] still to be agreed horizontally. referred to in points (a), (b), (g) respect of the functions referred to tasks referred to in points (a) 2. Regional Coordination Centres shall and (q) of Article 34(1). in (a) and (b) of Article 34(1). and (b), [ ] of Article 34(1). adopt issue binding coordinated actions Transmission system operators Transmission system operators Transmission system operators addressed to the transmission system shall implement the binding shall implement the binding may decide not to [ ] operators in respect of the functions tasks decisions issued by the regional decisions issued by the regional implement the coordinated referred to in points (a), (b) [ ] of Article operational centres except in coordination centres except in actions [ ] issued by the [ ] 34(1). Transmission system operators shall cases when the safety of the cases where the implementation of Regional Security implement the binding coordinated actions system will be negatively the decision would result in a Coordinators where the issued by the regional operational centres affected. violation of operational security implementation of the except in cases when the safety of the system limits defined by each coordinated actions would will be negatively affected. where the transmission system operator result in a violation of the implementation of the coordinated actions pursuant to Article 25 of operational security limits would result in a violation of the Commission Regulation (EU) defined by each transmission operational security limits defined by each 2017/1485. system operator in accordance transmission system operator [in with [ ] the System Operation accordance with [ ] the System Operation Guideline adopted on the basis Guideline adopted on the basis of Article of Article 18 of Regulation 18 of Regulation 714/2009 i]. 714/2009.

ANNEX I TREE.2.B EN

  • 593. 
    2a. Where following the Provisionally agreed: revision triggered in (Following adoption this will be the second accordance with Article 39, a part of paragraph 5 of the merged article) transmission system operator

    decides not to implement a Where following the revision triggered in coordinated action for the accordance with Article [39] [paragraph reasons set out in paragraph 2, X], a transmission system operator it shall transparently report decides not to implement a coordinated the detailed reasons to the action for the reasons set out in paragraph Regional Security Coordinator [2], it shall transparently report the and the transmission system detailed reasons to the Regional operators of the system Coordination Centre and the transmission operation region without system operators of the system operation undue delay. In such cases, the region without undue delay. In such cases, Regional Security Coordinator the Regional Coordination Centre shall shall assess the impact on the assess the impact on the other other transmission system transmission system operators of the operators of the system system operation region and may propose operation region and may a different set of coordinated actions propose a different set of subject to a procedure in paragraph 2. coordinated actions subject to a procedure in paragraph 2.

  • 594. 
    3. Regional operational AM 145 3. [ ] Regional Security Provisionally agreed: centres shall adopt 3. Regional coordination Coordinators shall adopt (Following adoption this will be paragraph 3 recommendations addressed to centres shall adopt recommendations addressed to of the merged article) the transmission system recommendations addressed to the the transmission system 3. Regional Coordination Centres shall operators for the functions transmission system operators for operators for the [ ] tasks adopt issue recommendations addressed to referred to in points (c) to (f) the functions listed in Article 34(1) referred to in [ ] Article 34(1) the transmission system operators for the [ ] and (h) to (p) of Article 34(1). which are not referred to in except for tasks covered in tasks listed in Article 34(1) which are not paragraph 2 of this Article. paragraph 2 of this Article. referred to in paragraph 2 of this Article. .

ANNEX I TREE.2.B EN

  • 595. 
    AM 146 Provisionally agreed to delete

    Article 38 – paragraph 3 a (new) 3 a. Where a transmission system operator decides to deviate from the decision or recommendation issued by the regional coordination centre, it shall submit a detailed explanation to the regional coordination centre and to other transmission system operators of the system operation region without delay.

  • 596. 
    AM 147 Provisionally agreed:

    Article 38 – paragraph 3 b (new) (Following adoption this will be paragraph 4

    3 b. The revision shall be

    triggered at the request of one or of the merged article) more of the transmission system 4. The revision of coordinated actions operators of the system operation or a recommendation shall be triggered at region. Following the revision of the request of one or more of the the decision or recommendation, transmission system operators of the system regional operational centres shall operation region. Following the revision of

    confirm or modify the measure. the coordinated action or recommendation, regional coordination centres shall confirm

    or modify the measure. 597. AM 148 Provisionally agreed to delete

    Article 38 – paragraph 3 c (new) 3 c. Where the measure subject to revision is a binding decision in accordance with Article 38(2) of this Regulation, the request for revision shall not suspend the decision except in cases where the implementation of the decision would result in a violation of operational security limits defined by each transmission system operator pursuant to Article 25 of the System Operation guidelines.

ANNEX I TREE.2.B EN

  • 598. 
    4. The regulatory AM 149 4. Upon proposal of Provisionally agreed: authorities of a system 4. The regulatory authorities of regulatory authority, following (Exact wording still to be finalised) operation region may jointly a system operation region may consultation with the [Upon a request by the European decide to grant binding jointly decide to grant binding transmission system operators Commission or by a Member State, the decision-making powers to the decision-making powers to the and Regional Security Electricity Cross-Border Committee set regional operational centre for regional coordination centre for Coordinators the [ ] Member up pursuant Article 62(1) shall issue an one or more of the functions one or more of the functions listed States of a system operation opinion on granting regional coordination provided for in points (c) to (f) in Article 34(1) and which are not region may jointly decide to centres with the power to issue and (h) to (l) of Article 34(1). referred to in paragraph 2 of this grant the competence for coordinated actions for one or more of the Article. coordinated actions or binding tasks listed in Article 34(1), other than decision-making powers to the [ those referred to in paragraph 2 of this ] Regional Security Article.

    Coordinators for one or more of the [ ] tasks provided for in [ Where the Electricity Cross-Border ] Article 34(1). Committee has issued an opinion in favour of granting regional coordination centres with the power to issue coordinated actions, the Commission, taking into account the opinion of the Electricity Cross-Border Committee, may, by means of implementing act, grant regional coordination centres the power to issue coordinated actions for one or more of the tasks listed in Article 34(1), other than those referred to in paragraph 2 of this Article.]

  • 599. 
    Article 39 AM 150 Article 39 Provisionally agreed in TM to merge articles Revision of decisions and deleted Revision of [ ] coordinated 38 and 39

    recommendations actions and recommendations

  • 600. 
    1. Regional operational 1. [ ] Regional Security Provisionally agreed to delete centres shall develop a Coordinators shall develop a [ ]

    procedure for the revision of procedure for the revision of [ ] decisions and coordinated actions and recommendations. recommendations referred to tasks described in Article 34.

ANNEX I TREE.2.B EN

  • 601. 
    2. The procedure shall be 2. The procedure shall be Provisionally agreed to delete triggered at the request of one triggered at the request of one or [ ]

    or more of the transmission more of the transmission system system operators of the system operators of the system operation region. Following the operation region. Following the revision of the decision or revision of the [ ] coordinated recommendation, regional action or recommendation, [ ] operational centres shall Regional Security

    confirm or modify the measure. Coordinators [+] shall confirm or modify the measure.

  • 602. 
    3. Where the measure 3. Where the measure Provisionally agreed: subject to revision is a binding subject to revision is a [ ]

    decision in accordance with coordinated action in (Following adoption this will be the first part Article 38(2), the request for accordance with Article 38(2), of paragraph 5 of the merged article) revision shall not suspend the the request for revision shall not decision except in cases when suspend the [ ] coordinated 5. Where the measure subject to revision the safety of the system will be action except in cases [ ] where is a coordinated action in accordance with negatively affected. the implementation of the [Article 38(2)], the request for revision shall coordinated actions would not suspend the coordinated action except result in a violation of the in cases [ ] where the implementation of operational security limits the coordinated action would result in a defined by each transmission violation of the operational security limits system operator in accordance defined by each transmission system with the System Operation operator in accordance with the System Guideline adopted on the basis Operation Guideline adopted on the basis of Article 18 of Regulation of Article 18 of Regulation 714/2009 i. 714/2009

ANNEX I TREE.2.B EN

  • 603. 
    4. Where the measure 4. Where following the [ ] Provisionally agreed: subject to revision is a revision [ ] of the (Following adoption this will be paragraph 6 recommendation in accordance recommendation in accordance of the merged article) with Article 38(3) and with Article 38([ ]3) [ ]a 6. Where following the [ ] revision [ ] following its revision a transmission system operator of the recommendation in accordance with transmission system operator decides to deviate from the [Article 38([ ]3)] [ ]a transmission system decides to deviate from the recommendation, the operator decides to deviate from the recommendation, the transmission system operator recommendation, the transmission system transmission system operator shall submit a [ ] justification to operator shall submit a [ ] justification to the shall submit a detailed the [ ] Regional Security Regional Coordination Centres and to the justification to the regional Coordinators and to the other other transmission system operators of the operational centre and to the transmission system operators of system operation region. other transmission system the system operation region.

    operators of the system operation region.

ANNEX I TREE.2.B EN

  • 604. 
    Article 40 AM 151 Article 40 Provisionally agreed:

    Management board of regional Article 40 – title Management board of [ ] Article 40 operational centres Management board of regional Regional Security Coordinators Management board of Regional coordination centres Coordination Centres

  • 605. 
    1. In order to adopt AM 152 1. In order to adopt measures Provisionally agreed: measures related to their 1. In order to adopt measures related to their governance and 1. In order to adopt measures related to governance and to monitor their related to their governance and to to monitor their performance, their governance and to monitor their performance, the regional monitor their performance, the the [ ] Regional Security performance, the Regional Coordination operational centres shall regional coordination centres shall Coordinators shall establish a Centres shall establish a management board. establish a management board. establish a management board. management board.
  • 606. 
    2. The management board AM 153 2. The management board Provisionally agreed: shall be composed of members 2. The management board shall shall be composed of members

    representing the transmission be composed of members representing the transmission 2. The management board shall be system operators and of representing all the transmission system operators [ ]. composed of members representing all the observers representing the system operators of the system transmission system operators [ ] that regulatory authorities of the operation region. The composition participate in the respective Regional system operation region. The of the management board shall be Coordination Centres. representatives of the regulatory geographically balanced. authorities shall have no voting rights.

  • 607. 
    3. The management board AM 154 3. The management board No change shall be responsible for: 3. The management board shall shall be responsible for:

    be responsible for: 608. (a) drafting and endorsing (a) drafting and endorsing the (a) drafting and endorsing the Provisionally agreed:

    the statutes and rules of statutes and rules of procedure of statutes and rules of procedure (a) drafting and endorsing the statutes and procedure of the regional the regional coordination centre; of the [ ] Regional Security rules of procedure of the Regional operational centre; Coordinators; Coordination Centres;

ANNEX I TREE.2.B EN

  • 609. 
    (b) deciding upon and (b) [ ] implementing the (b) deciding upon and Provisionally agreed: implementing the organisational structure; implementing the organisational (b) deciding upon and implementing the organisational structure; structure; organisational structure;
  • 610. 
    (c) preparing and endorsing (c) preparing and endorsing No change the annual budget; the annual budget; (c) preparing and endorsing the annual budget;
  • 611. 
    (d) developing and endorsing (d) developing and endorsing Provisionally agreed: the cooperative decisionthe cooperative [ ] processes in (d) developing and endorsing the making processes in accordance accordance with Article 35. cooperative [ ] processes in accordance with with Article 35. Article 35.
  • 612. 
    4. The competences of the AM 155 4. The competences of the Provisionally agreed: management board shall 4. The competences of the management board shall exclude 4. The competences of the management exclude those that are related to management board shall not those that are related to the dayboard shall exclude those that are related to the day-to-day activities of include decisions related to the to-day activities of [ ] Regional the day-to-day activities of [ ] Regional regional operational centres and execution of the functions of Security Coordinators and the Coordination Centres and the performance the performance of its regional coordination centres. performance of its tasks [ ]. of its tasks [ ].

    functions.

  • 613. 
    Article 41

    Organisational structure

  • 614. 
    1. Regional operational AM 156

    centres shall set up and manage 1. The transmission system 1. Transmission system

    Provisionally agreed:

    their organisation according to operators of a system operation operators shall establish the 1. The transmission system operators of a structure that supports the region shall set up the necessary arrangements for a system operation region shall set up the safety of their functions. organisational structure of Regional security coordinators organisational structure of Regional Their organisational structure regional coordination centres. to [ ] manage their shall specify: Their organisational structure shall organisation according to a

    Coordination Centres that supports the

    specify: structure that supports the safety

    safety of their tasks. Their organisational

    of their tasks [ ]. structure shall specify:

    Their organisational structure shall specify:

ANNEX I TREE.2.B EN

  • 615. 
    (a) the authority, duties and AM 157 (a) the authority, duties and Provisionally agreed: responsibilities of the (a) the authority, duties and responsibilities of the (a) the authority, duties and management personnel; responsibilities of the [ ] management personnel; responsibilities of the [ ] personnel; personnel;
  • 616. 
    (b) the relationship and (b) the relationship and No change reporting lines between reporting lines between different (b) the relationship and reporting lines different parts and processes of parts and processes of the between different parts and processes of the the organisation. organisation. organisation.
  • 617. 
    2. Regional operational AM 158 2. [ ] Regional Security Provisionally agreed: centres may set up regional 2. Regional coordination Coordinators may set up

    desks to address local centres may set up regional desks regional desks to address [ ] 2. Regional Coordination Centres may specificities or back-up to address local specificities or sub-regional specificities or set up regional desks to address [ ] suboperational centres for the back-up coordination centres for back-up regional security regional specificities or back-up regional efficient and reliable exercise of the efficient and reliable exercise coordinators for the efficient and security coordinators for the efficient and their functions. of their functions where proven to reliable exercise of their [ ] reliable exercise of their [ ] tasks where be strictly necessary. tasks. proven to be strictly necessary.

ANNEX I TREE.2.B EN

  • 618. 
    Article 42

    Equipment and staff

  • 619. 
    Regional operational centres AM 159 [ ] Regional Security Provisionally agreed: shall be equipped with all the Regional coordination centres Coordinators shall be equipped Regional Coordination Centres shall be human, technical, physical and shall be equipped with all the with all the human, technical, equipped with all the human, technical, financial resources necessary human, technical, physical and physical and financial resources physical and financial resources necessary for fulfilling their obligations financial resources necessary for necessary for fulfilling their for fulfilling their obligations under this under this Regulation and fulfilling their obligations under obligations under this Regulation and carrying out their [ ] tasks carrying out their functions. this Regulation and carrying out Regulation and carrying out independently and impartially. their functions independently and their [ ] tasks.

    impartially. The human, technical, Provisionally agreed to add in recitals: physical and financial resources for regional coordination centres The human, technical, physical and shall not go beyond what is strictly financial resources for regional necessary for the fulfilment of its coordination centres should not go beyond tasks while geographically what is strictly necessary for the fulfilment balanced representation and of its tasks. equitable treatment of members of regional coordination centre shall be ensured.

  • 620. 
    Article 43

    Monitoring and reporting

  • 621. 
    1. Regional operational AM 160 1. [ ] Regional Security Provisionally agreed: centres shall establish a process 1. Regional coordination Coordinators shall establish a 1. Regional Coordination Centres shall for the continuous monitoring centres shall establish a process for process for the continuous establish a process for the continuous of at least: the continuous monitoring of at monitoring of at least: monitoring of at least: least:
  • 622. 
    (a) their operational (a) their operational (a) their operational No change performance; performance; performance; (a) their operational performance;

ANNEX I TREE.2.B EN

  • 623. 
    (b) the decisions and (b) the decisions and (b) the [ ] coordinated Provisionally agreed: recommendations issued and recommendations issued in actions and recommendations (b) the [ ] coordinated actions and the outcome achieved; particular on those where the issued the degree of recommendations issued the degree of transmission system operators implementation of the implementation of the coordinated actions have deviated and the outcome coordinated actions and and recommendations by the transmission achieved; recommendations by the system operators and the outcome achieved; transmission system operators

    and the outcome achieved; 624. (c) the effectiveness and (c) the effectiveness and Provisionally agreed:

efficiency of each of the efficiency of each of the [ ] (c) the effectiveness and efficiency of

functions for which they are tasks for which they are each of the [ ] tasks for which they are

responsible. responsible. responsible and, where applicable, the

rotation of the tasks.

  • 625. 
    2. Regional operational AM 161 2. [ ] Regional Security Provisionally agreed to delete

centres shall submit to the deleted Coordinators shall submit to

Agency and to the regulatory the Agency [ ] to the regulatory

authorities of the system authorities and to the

operation region the data transmission system operators

resulting from their continuous of the system operation region

monitoring at least annually. the data resulting from their

continuous monitoring at least

annually.

  • 626. 
    3. Regional operational AM 162 3. [ ] Regional Security Provisionally agreed:

centres shall establish their 3. Regional coordination Coordinators shall establish 3. Regional Coordination Centres shall

costs in a transparent manner centres shall establish their costs in their costs in a transparent establish their costs in a transparent manner

and report them to the Agency a transparent manner and report manner and report them to the and report them to the Agency and to the

and to the regulatory authorities them to the Agency and to the Agency and to the regulatory regulatory authorities of the system operation

of the system operation region. regulatory authorities of the system authorities of the system region.

operation region. operation region.

ANNEX I TREE.2.B EN

  • 627. 
    4. Regional operational AM 163 4. [ ] Regional Security Provisionally agreed: centres shall submit an annual 4. Regional coordination Coordinators shall submit an report concerning their centres shall submit an annual annual report concerning their 4. Regional Coordination Centres shall performance to ENTSO for report containing relevant performance to ENTSO for submit an annual report containing relevant Electricity, the Agency, the monitoring data pursuant to Electricity, the Agency, the monitoring data pursuant to paragraph 1 of regulatory authorities of the paragraph 1 of this Article and regulatory authorities of the this Article and information on their system operation region and the information on their performance system operation region and the performance to ENTSO for Electricity, the Electricity Coordination Group to ENTSO for Electricity, the Electricity Coordination Group Agency, the regulatory authorities of the established pursuant to Article Agency, the regulatory authorities established pursuant to Article 1 system operation region and the Electricity 1 of Commission Decision of the system operation region and of Commission Decision 2012/C Coordination Group established pursuant to 2012/C 353/02 28 . the Electricity Coordination Group 353/02

    29 . Article 1 of Commission Decision 2012/C established pursuant to Article 1 of 353/02.

    Commission Decision 2012/C 353/02.

  • 628. 
    5. Regional operational AM 164 5. [ ] Regional Security Provisionally agreed: centres shall report 5. Regional coordination Coordinators shall report

    shortcomings identified in the centres shall report shortcomings shortcomings identified in the 5. Regional Coordination Centres shall monitoring process under identified in the monitoring process monitoring process under report shortcomings identified in the paragraph 1 to ENTSO for under paragraph 1 to ENTSO for paragraph 1 to ENTSO for monitoring process under paragraph 1 to electricity, the regulatory electricity, the regulatory electricity, the regulatory ENTSO for electricity, the regulatory authorities of the system authorities of the system operation authorities of the region the authorities of the system operation region operation region, the Agency region, the Agency and the Agency and the competent the Agency and the competent authorities of and the competent authorities of competent authorities of Member authorities of Member States Member States responsible for the Member States responsible for States responsible for the responsible for the prevention prevention and management of crisis the prevention and management prevention and management of and management of crisis situations. Following this report, the of crisis situations. crisis situations. situations. Following this relevant regulatory authorities of the report, the regulatory system operation region may propose to authorities of the region may the Regional Coordination Centres propose to the Regional measures to address the shortcomings. Security Coordinators measures to address the shortcomings.

28 Commission Decision of 15 November 2012 setting up the Electricity Coordination Group (OJ C 353, 17.11.2012, p.2).

29 Commission Decision of 15 November 2012 setting up the Electricity Coordination Group (OJ C 353, 17.11.2012, p.2).

ANNEX I TREE.2.B EN

  • 629. 
    AM 165 Provisionally agreed:

    Article 43 – paragraph 5 a (new) 5 a. Without prejudice to the 5 a. Without prejudice to the principle of principle of confidentiality and the confidentiality and the need to preserve need to preserve security and security and commercially sensitive commercially sensitive information Regional Coordination Centres information regional coordination shall make public the reports referred to in centres shall make public the paragraphs 4 and 5. reports referred to in paragraphs 4 and 5.

  • 630. 
    Article 44

    Liability

  • 631. 
    Regional operational centres AM 166 [ ] In the proposal for the Provisionally agreed: shall take the necessary steps to The proposal for the establishment establishment of regional [ ] In the proposal for the establishment cover liability related to the of regional coordination centres in security coordinators in of Regional Coordination Centres in execution of their tasks, in accordance with Article 32, shall accordance with Article 32, the accordance with Article 32, the particular, where they adopt include arrangements to cover transmission system operators transmission system operators of the decisions binding on liability related to the execution of of the system operation region system operation region shall take the transmission system operators. the tasks of the regional shall take the necessary steps to necessary steps to cover liability related to The method employed to coordination centre. The method cover liability related to the the execution of their tasks. [ ] The method provide the cover shall take into employed to provide the cover execution of their tasks. [ ] The employed to provide the cover shall take into account the legal status of the shall take into account the legal method employed to provide the account the legal status of the Regional regional operational centre and status of the regional coordination cover shall take into account the Coordination Centres and the level of the level of commercial centre and the level of commercial legal status of the [ ] Regional commercial insurance cover available. insurance cover available. insurance cover available. Security Coordinators and the

    level of commercial insurance cover available.

ANNEX I TREE.2.B EN

  • 632. 
    Article 45

    Ten-year network development plan

  • 633. 
    1. The Union-wide 1. The Union-wide network network development plan development plan referred to

    referred to under Article under Article 27(1)(b) shall 27(1)(b) shall include the include the modelling of the modelling of the integrated integrated network, scenario network, scenario development development and an assessment and an assessment of the of the resilience of the system. resilience of the system. The Union-wide network The Union-wide network development plan shall, in development plan shall, in particular: particular:

  • 634. 
    (a) build on national (a) build on national investment plans, taking into investment plans, taking into account regional investment account regional investment plans as referred to in Article plans as referred to in Article 12(1), and, if appropriate, 12(1), and, if appropriate, Union Union aspects of network aspects of network planning as planning as set out in set out in Regulation (EU) No Regulation (EU) No 347/2013 i 347/2013 of the European of the European Parliament and Parliament and of the Council ; of the Council 30 ; it shall be it shall be subject to a costsubject to a cost-benefit benefit analysis using the analysis using the methodology methodology established as set established as set out in Article out in Article 11 of that 11 of that Regulation; Regulation;

30 Regulation (EU) No 347/2013 i of the European Parliament and of the Council of 17 April 2013 on guidelines for trans-European energy infrastructure (OJ L 115, 25.4.2013, p. 39).

ANNEX I TREE.2.B EN

  • 635. 
    (b) regarding cross-border (b) regarding cross-border interconnections, also build on interconnections, also build on the reasonable needs of the reasonable needs of different different system users and system users and integrate longintegrate long-term term commitments from

    commitments from investors investors referred to in Articles referred to in Articles 44 and 51 44 and 51 of [recast of Directive of [recast of Directive 2009/72/EC i as proposed by 2009/72/EC as proposed by COM(2016) 864 i/2]; and COM(2016) 864 i/2]; and

  • 636. 
    (c) identify investment gaps, (c) identify investment gaps, notably with respect to crossnotably with respect to crossborder

    capacities. border capacities. 637. In regard to point (c) , a review In regard to point (c) , a review

    of barriers to the increase of of barriers to the increase of cross-border capacity of the cross-border capacity of the network arising from different network arising from different approval procedures or approval procedures or practices practices may be annexed to the may be annexed to the Union Union-wide network wide network development plan. development plan.

  • 638. 
    2. The Agency shall provide 2. The Agency shall provide an opinion on the national tenan opinion on the national tenyear

    network development year network development plans plans to assess their consistency to assess their consistency with with the Union-wide network the Union-wide network development plan. If the development plan. If the Agency Agency identifies identifies inconsistencies inconsistencies between a between a national ten-year national ten-year network network development plan and development plan and the the Union-wide network Union-wide network development plan, it shall development plan, it shall recommend amending the recommend amending the national ten-year network national ten-year network development plan or the Union

ANNEX I TREE.2.B EN

development plan or the Unionwide network development plan wide network development plan as appropriate. If such national as appropriate. If such national ten-year network development ten-year network development plan is elaborated in accordance plan is elaborated in accordance with Article 51 of [recast of with Article 51 of [recast of Directive 2009/72/EC i as Directive 2009/72/EC i as proposed by COM(2016) 864 i/2], proposed by COM(2016) the Agency shall recommend 864/2], the Agency shall that the competent national recommend that the competent regulatory authority amend the national regulatory authority national ten-year network amend the national ten-year development plan in accordance network development plan in with Article 51(7) of that accordance with Article 51(7) Directive and inform the of that Directive and inform the Commission thereof. Commission thereof.

ANNEX I TREE.2.B EN

  • 639. 
    Article 46

    Inter-transmission system operator compensation mechanism

  • 640. 
    1. Transmission system 1. Transmission system

    operators shall receive operators shall receive compensation for costs incurred compensation for costs incurred as a result of hosting crossas a result of hosting crossborder flows of electricity on border flows of electricity on their networks. their networks.

  • 641. 
    2. The compensation 2. The compensation referred to in paragraph 1 shall referred to in paragraph 1 shall be paid by the operators of be paid by the operators of national transmission systems national transmission systems from which cross-border flows from which cross-border flows originate and the systems where originate and the systems where those flows end. those flows end.
  • 642. 
    3. Compensation payments 3. Compensation payments

    shall be made on a regular basis shall be made on a regular basis with regard to a given period of with regard to a given period of time in the past. Ex-post time in the past. Ex-post adjustments of compensation adjustments of compensation paid shall be made where paid shall be made where necessary, to reflect costs necessary, to reflect costs actually incurred. actually incurred.

  • 643. 
    The first period of time for The first period of time for

    which compensation payments which compensation payments shall be made shall be shall be made shall be determined in the guidelines determined in the guidelines referred to in Article 57. referred to in Article 57.

  • 644. 
    4. The Commission shall 4. The Commission shall adopt delegated acts in adopt delegated acts in

    accordance with Article 63 accordance with Article 63 concerning the amounts of concerning the amounts of compensation payments compensation payments payable. payable.

ANNEX I TREE.2.B EN

  • 645. 
    5. The magnitude of cross 5. The magnitude of crossborder flows hosted and the border flows hosted and the

    magnitude of cross-border magnitude of cross-border flows flows designated as originating designated as originating and/or and/or ending in national ending in national transmission transmission systems shall be systems shall be determined on determined on the basis of the the basis of the physical flows of physical flows of electricity electricity actually measured actually measured during a during a given period of time. given period of time.

  • 646. 
    6. The costs incurred as a 6. The costs incurred as a result of hosting cross-border result of hosting cross-border flows shall be established on flows shall be established on the the basis of the forward-looking basis of the forward-looking long-run average incremental long-run average incremental costs, taking into account costs, taking into account losses, losses, investment in new investment in new infrastructure, infrastructure, and an and an appropriate proportion of appropriate proportion of the the cost of existing

    cost of existing infrastructure, infrastructure, in so far as such in so far as such infrastructure infrastructure is used for the is used for the transmission of transmission of cross-border cross-border flows, in particular flows, in particular taking into taking into account the need to account the need to guarantee guarantee security of supply. security of supply. When When establishing the costs establishing the costs incurred, incurred, recognised standardrecognised standard-costing costing methodologies shall be methodologies shall be used. used. Benefits that a network Benefits that a network incurs as incurs as a result of hosting a result of hosting cross-border cross-border flows shall be flows shall be taken into account taken into account to reduce the to reduce the compensation compensation received. received.

ANNEX I TREE.2.B EN

  • 647. 
    7. For the purpose of the 7. For the purpose of the inter-transmission system inter-transmission system

    operator compensation operator compensation mechanism only, where mechanism only, where transmission networks of two or transmission networks of two or more Member States form part, more Member States form part, in whole or in part, of a single in whole or in part, of a single control block, the control block control block, the control block as a whole shall be considered as a whole shall be considered as as forming part of the forming part of the transmission transmission network of one of network of one of the Member the Member States concerned, States concerned, in order to in order to avoid flows within avoid flows within control control blocks being considered blocks being considered as as cross-border flows under cross-border flows under Article Article 2(2)(b) and giving rise 2(2)(b) and giving rise to to compensation payments compensation payments under under paragraph 1 of this paragraph 1 of this Article. The Article . The regulatory regulatory authorities of the authorities of the Member Member States concerned may States concerned may decide decide which of the Member which of the Member States States concerned shall be that of concerned shall be that of which the control block as a which the control block as a whole is to be considered to whole is to be considered to form part. form part.

ANNEX I TREE.2.B EN

  • 648. 
    Article 47

    Provision of information

  • 649. 
    1. Transmission system 1. Transmission system operators shall put in place operators shall put in place coordination and information coordination and information exchange mechanisms to ensure exchange mechanisms to ensure the security of the networks in the security of the networks in the context of congestion the context of congestion

    management. management. 650. 2. The safety, operational 2. The safety, operational

    and planning standards used by and planning standards used by transmission system operators transmission system operators shall be made public. The shall be made public. The information published shall information published shall include a general scheme for include a general scheme for the the calculation of the total calculation of the total transfer transfer capacity and the capacity and the transmission transmission reliability margin reliability margin based upon the based upon the electrical and electrical and physical features physical features of the of the network. Such schemes network. Such schemes shall be shall be subject to the approval subject to the approval of the of the regulatory authorities. regulatory authorities.

ANNEX I TREE.2.B EN

  • 651. 
    3. Transmission system 3. Transmission system operators shall publish operators shall publish estimates estimates of available transfer of available transfer capacity for capacity for each day, each day, indicating any

    indicating any available transfer available transfer capacity capacity already reserved. already reserved. Those Those publications shall be publications shall be made at made at specified intervals specified intervals before the before the day of transport and day of transport and shall shall include, in any event, include, in any event, weekweek-ahead and month-ahead ahead and month-ahead estimates, as well as a estimates, as well as a quantitative indication of the quantitative indication of the expected reliability of the expected reliability of the available capacity. available capacity.

  • 652. 
    4. Transmission system AM 167 4. Transmission system operators shall publish relevant 4. Transmission system operators shall publish relevant data on aggregated forecast and operators shall publish relevant data on aggregated forecast and actual demand, on availability data on aggregated forecast and actual demand, on availability and actual use of generation and actual demand, on availability and and actual use of generation and load assets, on availability and actual use of generation and load load assets, on availability and use of the networks and assets, on availability and use of use of the networks and

    interconnections, and on the networks and interconnections, interconnections, and on balancing power and reserve on balancing power and reserve balancing power and reserve capacity. For availability and capacity and on the availability of capacity. For availability and actual use of small generation flexibility. For availability and actual use of small generation and load units, aggregated actual use of small generation and and load units, aggregated estimate data may be used. load units, aggregated estimate data estimate data may be used. may be used.

  • 653. 
    5. The market participants 5. The market participants concerned shall provide the concerned shall provide the

    transmission system operators transmission system operators with the relevant data. with the relevant data.

ANNEX I TREE.2.B EN

  • 654. 
    6. Generation undertakings 6. Generation undertakings which own or operate which own or operate generation generation assets, where at least assets, where at least one

    one generation asset has an generation asset has an installed installed capacity of at least 250 capacity of at least 250 MW, or MW, or which have a portfolio which have a portfolio comprising at least 400 MW of comprising at least 400 MW of generation assets, shall keep at generation assets, shall keep at the disposal of the national the disposal of the national regulatory authority, the regulatory authority, the national national competition authority competition authority and the and the Commission, for five Commission, for five years all years all hourly data per plant hourly data per plant that is that is necessary to verify all necessary to verify all operational dispatching operational dispatching decisions and the bidding decisions and the bidding behaviour at power exchanges, behaviour at power exchanges, interconnection auctions, interconnection auctions, reserve reserve markets and over-themarkets and over-the-countercounter-markets. The per-plant markets. The per-plant and per and per hour information to be hour information to be stored stored shall include, but shall shall include, but shall not be not be limited to, data on limited to, data on available available generation capacity generation capacity and and committed reserves, committed reserves, including including allocation of those allocation of those committed committed reserves on a perreserves on a per-plant level, at plant level, at the times the the times the bidding is carried bidding is carried out and when out and when production takes production takes place. place.

ANNEX I TREE.2.B EN

  • 655. 
    7. Transmission system 7. Transmission system operators shall exchange operators shall exchange

    regularly a set of sufficiently regularly a set of sufficiently accurate network and load flow accurate network and load flow data in order to enable load data in order to enable load flow flow calculations for each calculations for each transmission system operator in transmission system operator in their relevant area. The same their relevant area. The same set set of data shall be made of data shall be made available available to the regulatory to the regulatory authorities and authorities and to the to the Commission and Commission upon request. The Member States upon request. regulatory authorities and the The regulatory authorities, Commission shall treat that set Member States and the of data confidentially, and shall Commission shall treat that set ensure that confidential of data confidentially, and shall treatment is also given by any ensure that confidential consultant carrying out treatment is also given by any analytical work on their request, consultant carrying out on the basis of those data. analytical work on their request, on the basis of those data.

  • 656. 
    Article 48

    Certification of transmission system operators

  • 657. 
    1. The Commission shall 1. The Commission shall examine any notification of a examine any notification of a decision on the certification of a decision on the certification of a transmission system operator as transmission system operator as laid down in Article 52(6) of laid down in Article 52(6) of [recast of Directive 2009/72/EC i [recast of Directive 2009/72/EC i as proposed by COM(2016) as proposed by COM(2016) 864 i/2] as soon as it is received. 864/2] as soon as it is received. Within two months of the day Within two months of the day of of receipt of such notification, receipt of such notification, the the Commission shall deliver its Commission shall deliver its opinion to the relevant national opinion to the relevant national regulatory authority as to its regulatory authority as to its

ANNEX I TREE.2.B EN

compatibility with Article 52(2) compatibility with Article 52(2) or Article 53 and Article 43 of or Article 53 and Article 43 of [recast of Directive 2009/72/EC i [recast of Directive 2009/72/EC i as proposed by COM(2016) as proposed by COM(2016) 864 i/2]. 864/2].

  • 658. 
    When preparing the opinion When preparing the opinion referred to in the first referred to in the first

    subparagraph, the Commission subparagraph, the Commission may request the Agency to may request the Agency to provide its opinion on the provide its opinion on the national regulatory authority’s national regulatory authority’s decision. In such a case, the decision. In such a case, the twotwo-month period referred to in month period referred to in the the first subparagraph shall be first subparagraph shall be extended by two further extended by two further months. months.

  • 659. 
    In the absence of an opinion by In the absence of an opinion by the Commission within the the Commission within the

    periods referred to in the first periods referred to in the first and second subparagraphs, the and second subparagraphs, the Commission shall be deemed Commission shall be deemed not to raise objections to the not to raise objections to the regulatory authority’s decision. regulatory authority’s decision.

  • 660. 
    2. Within two months of 2. Within two months of receiving an opinion of the receiving an opinion of the Commission, the national Commission, the national

    regulatory authority shall adopt regulatory authority shall adopt its final decision regarding the its final decision regarding the certification of the transmission certification of the transmission system operator, taking the system operator, taking the utmost account of that opinion. utmost account of that opinion. The regulatory authority's The regulatory authority's decision and the Commission's decision and the Commission's opinion shall be published opinion shall be published together. together.

ANNEX I TREE.2.B EN

  • 661. 
    3. At any time during the 3. At any time during the procedure, regulatory procedure, regulatory authorities authorities and/or the and/or the Commission may Commission may request from request from a transmission a transmission system operator system operator and/or an

    and/or an undertaking undertaking performing any of performing any of the functions the functions of generation or of generation or supply any supply any information relevant information relevant to the to the fulfilment of their tasks fulfilment of their tasks under under this Article. this Article.

  • 662. 
    4. Regulatory authorities 4. Regulatory authorities and and the Commission shall the Commission shall preserve

    preserve the confidentiality of the confidentiality of commercially sensitive commercially sensitive information. information.

  • 663. 
    5. Where the Commission 5. Where the Commission has received notification of the has received notification of the certification of a transmission certification of a transmission system operator under Article system operator under Article 43(9) of [recast of Directive 43(9) of [recast of Directive

    2009/72/EC as proposed by 2009/72/EC as proposed by COM(2016) 864 i/2] , the COM(2016) 864 i/2], the Commission shall take a Commission shall take a decision relating to decision relating to certification. certification. The regulatory The regulatory authority shall authority shall comply with the comply with the Commission Commission decision. decision.

ANNEX I TREE.2.B EN

  • 664. 
    Chapter VI

    Distribution system operation 665. Article 49 Article 49

    European entity for distribution [ ] Cooperation of distribution system operators system operators

  • 666. 
    Distribution system operators AM 168 1. Distribution system

    which are not part of a Distribution system operators shall operators [ ] shall cooperate

    vertically integrated

    undertaking or which are cooperate at Union level through a at Union level [ ] to promote the unbundled according to the European Entity for Distribution completion and functioning of

    provisions of Article 35 [recast system operators ("EU DSO the internal market in electricity, of Directive 2009/72/EC i as entity"), in order to promote the and to promote optimal

    proposed by COM(2016) completion and functioning of the management and a coordinated 864/2], shall cooperate at Union internal market in electricity, and to operation of distribution and

    level through a European Entity promote optimal management and transmission systems. [ ] for Distribution system a coordinated operation of

    operators ("EU DSO entity"), in distribution and transmission order to promote the systems. Distribution system

    completion and functioning of operators who wish to participate

    the internal market in in the EU DSO entity shall have

    electricity, and to promote

    optimal management and a the right to become registered

    coordinated operation of members of the entity.

    distribution and transmission systems. Distribution system operators who wish to participate in the EU DSO entity shall become registered members of the entity.

ANNEX I TREE.2.B EN

  • 667. 
    Registered members may participate in the EU DSO entity directly or be represented by the national association designated by the Member State or by an Union level association.
  • 668. 
    In performing its functions under

    Union law, the EU DSO entity shall act independently from individual national interests or the national interests of distribution system operators.

  • 669. 
    1a. Distribution system operators are entitled to

    associate themselves through the establishment of a European Entity for Distribution system operators the EU DSO entity and to join it. The EU DSO entity shall be established at the latest by 31 December 2022 and shall fulfil the tasks and procedures foreseen by this Regulation in accordance with Article [51]. As an expert entity working for the common European interest, it shall not represent particular interest nor seek to influence the decision making process to defend certain interests.

ANNEX I TREE.2.B EN

  • 670. 
    1b. Members of the EU DSO

    entity shall be subject to registration and payment of a fair and proportionate membership fee.

  • 671. 
    Article 50 Article 50

    Establishment of the EU DSO Establishment of the EU DSO entity for electricity entity[ ]

  • 672. 
    0. EU DSO entity shall consist of, at least, a General Assembly, Board of Directors, Strategic Advisor Group, Expert Groups and a

    Secretary General. 673. 1. By [OP: twelve months AM 169 1. [ ] Within [OP: twelve

    after entry into force], the 1. By [OP: twelve months after months after entry into force], distribution system operators, entry into force], the distribution the distribution system operators with the administrative support system operators, with the [ ] shall submit to the of the Agency, shall submit to administrative support of the Commission and to the Agency the Commission and to the Agency, shall submit to the the draft statutes in accordance Agency the draft statutes, a list Commission and to the Agency the with [Article 50a] including a of registered members, the draft draft statutes, a list of participating code of conduct, a list of rules of procedure, including distribution system operators and registered members, the draft the rules of procedures on the entities designated to represent rules of procedure, including the consultation with ENTSO for distribution system operators, the rules of procedures on the Electricity and other draft rules of procedure, including consultation with ENTSO for stakeholders and the financing the rules of procedures on the Electricity and other rules, of the EU DSO entity to consultation with ENTSO for stakeholders and the financing be established. Electricity and other stakeholders, rules, of the EU DSO entity to the decision-making procedure be established. and the financing rules, of the EU DSO entity to be established.

ANNEX I TREE.2.B EN

  • 674. 
    The draft rules of procedure of the

    EU DSO entity shall ensure balanced representation of all participating DSOs regardless of their size, including in the decision-making procedure.

  • 675. 
    2. Within two months of AM 170 2. Within two months of receipt, the Agency, after 2. Within two months of receipt, the Agency, after

    formally consulting the receipt, the Agency, after formally formally consulting the organisations representing all consulting the organisations organisations representing all stakeholders, in particular representing all stakeholders, in stakeholders, in particular distribution system users, shall particular distribution system users distribution system users, shall provide an opinion to the and consumer protection provide an opinion to the Commission on the draft organisations, shall provide an Commission on the draft statutes, the list of members and opinion to the Commission on the statutes, the list of members and the draft rules of procedure. draft statutes, the list of members the draft rules of procedure. and the draft rules of procedure, taking into account in particular the rules related to the independence of the EU DSO, to the prevention of conflicts of interests, and to the necessity to ensure geographically balanced representation and equitable treatment of its Members.

ANNEX I TREE.2.B EN

  • 676. 
    3. The Commission shall AM 171 3. The Commission shall deliver an opinion on the draft 3. The Commission shall deliver an opinion on the draft statutes, the list of members and deliver an opinion on the draft statutes, the list of members and the draft rules of procedure statutes, the list of members and the draft rules of procedure

    taking into account the opinion the draft rules of procedure, taking into account the opinion of the Agency provided for in including the rules of procedures of the Agency provided for in paragraph 2, within three on the consultation with ENTSO paragraph 2, within three months months of receipt of the opinion for Electricity and other of receipt of the opinion of the of the Agency. stakeholders, the decision-making Agency. procedure and the financing rules, taking into account the opinion of the Agency provided for in paragraph 2, within three months of receipt of the opinion of the Agency.

  • 677. 
    4. Within three months of 4. Within three months of the day of receipt of the the day of receipt of the

    Commission’s positive opinion, Commission’s positive opinion, the distribution system the distribution system operators operators shall establish the EU shall establish the EU DSO DSO entity and adopt and entity and adopt and publish its publish its statutes and rules of statutes and rules of procedure. procedure.

  • 678. 
    5. The documents referred 5. The documents referred to to in paragraph 1 shall be in paragraph 1 shall be

    submitted to the Commission submitted to the Commission and to the Agency in case of and to the Agency in case of changes thereof or upon their changes thereof or upon their reasoned request. The Agency reasoned request. The Agency and the Commission shall and the Commission shall deliver an opinion in line with deliver an opinion in line with the process set out in the process set out in paragraph

5834/5/18 REV 5 BL/ns 257

ANNEX I TREE.2.B EN

  • 679. 
    6. The costs related to the AM 172 6. The costs related to the activities of the EU DSO entity 6. The costs related to the activities of the EU DSO entity shall be borne by distribution activities of the EU DSO entity shall be borne by distribution system operators who are shall be borne by distribution system operators who are

    registered members and shall be system operators who are registered members and shall be taken into account in the registered members and shall be taken into account in the calculation of tariffs. considered as eligible cost and calculation of tariffs. Regulatory Regulatory authorities shall taken into account by the authorities shall approve those approve those costs only if they regulatory authority in the costs only if they are reasonable are reasonable and calculation of tariffs. Regulatory and proportionate. proportionate. authorities shall approve those costs only if they are reasonable and proportionate.

  • 680. 
    AM 173 Article 50a

    Article 50 a (new) Principal rules and procedures Article 50a for the EU DSO entity for Principal rules and procedures for electricity the EU DSO entity for electricity

  • 681. 
    1. The statutes of the EU DSO 1. The statutes of the EU entity adopted in accordance with DSO entity adopted in

    Article 50 shall safeguard the accordance with Article 50 following principles: shall safeguard the following principles:

  • 682. 
    (a) participation in the works of (a) participation in the the EU DSO entity is limited to works of the EU DSO entity is registered members with the limited to registered members possibility of delegation within the with the possibility of

    membership; delegation within the membership;

  • 683. 
    (b) strategic decisions (b) strategic decisions regarding the activities of the EU regarding the activities of the DSO entity as well as policy EU DSO entity as well as guidelines for the Board of policy guidelines for the Board Directors are adopted by the of Directors are adopted by General Assembly; the General Assembly;

ANNEX I TREE.2.B EN

  • 684. 
    (c) decisions of the General (c) decisions of the General

    Assembly are adopted according Assembly are adopted with the following rules: according with the following - when 65% of the votes attributed rules: to the members of the General - when 65% of the votes Assembly are reached, attributed to the members of the General Assembly are - whereby each member disposes reached, of a number of votes proportional to the respective number of - whereby each member customers and disposes of a number of votes proportional to the respective number of customers and - the final outcome is supported by at least 55% of the members of the - the final outcome is General Assembly. supported by at least 55% of the members of the General Assembly.

  • 685. 
    (d) decisions of the General (d) decisions of the General

    Assembly are blocked according Assembly are blocked with the following rules: according with the following -when 35% of the votes attributed rules: to the members of the General -when 35% of the votes Assembly are reached, attributed to the members of

    the General Assembly are

    • - 
      whereby each member disposes reached,

    of a number of votes proportional

    to the respective number of - whereby each member customers; and disposes of a number of votes

    proportional to the respective

    • - 
      the final outcome is supported by number of customers; and

    at least 25% of the members of the

    General Assembly - the final outcome is supported by at least 25% of

    the members of the General Assembly

ANNEX I TREE.2.B EN

  • 686. 
    (e) the Board of Directors is (e) the Board of Directors is elected by the General Assembly elected by the General

    for a mandate of maximum 4 Assembly for a mandate of years; maximum 4 years;

  • 687. 
    (f) the Board of Directors (f) the Board of Directors nominates the President and the nominates the President and three Vice-Presidents among its the three Vice-Presidents

    members; among its members; 688. (g) DSO-TSO cooperation (g) DSO-TSO cooperation

    pursuant to Articles 52 and 53 is pursuant to Articles 52 and 53 led by the Board of Directors; is led by the Board of Directors;

  • 689. 
    (h) decisions of the Board of (h) decisions of the Board of

    Directors are adopted by simple Directors are adopted by majority of 15 votes; simple majority of 15 votes;

  • 690. 
    (i) based on proposal by the (i) based on proposal by the

    Board of Directors, the Secretary Board of Directors, the General is appointed by the Secretary General is appointed General Assembly among its by the General Assembly members for a four years among its members for a four mandate, renewable once; years mandate, renewable once;

  • 691. 
    (j) based on proposal by the (j) based on proposal by the

    Board of Directors, Expert Groups Board of Directors, Expert are appointed by the General Groups are appointed by the Assembly whereby each group General Assembly whereby shall not exceed 30 members with each group shall not exceed 30 the possibility of 1/3 coming from members with the possibility outside the membership. In of 1/3 coming from outside the addition, 'one country' expert membership. In addition, 'one group shall be established and country' expert group shall be consist of exactly one DSO established and consist of representative from each Member exactly one DSO State. representative from each Member State.

ANNEX I TREE.2.B EN

  • 692. 
    2. Procedures adopted by the 2. Procedures adopted by

    EU DSO entity shall safeguard the the EU DSO entity shall fair and proportionate treatment safeguard the fair and of its members and reflect the proportionate treatment of its diverse geographical and members and reflect the economic structure of its diverse geographical and membership. In particular, the economic structure of its procedures shall foresee that: membership. In particular, the procedures shall foresee that:

  • 693. 
    (a) the Board of Directors is (a) the Board of Directors is composed by the President of the composed by the President of Board and 27 members' the Board and 27 members'

    representatives, of which: representatives, of which: - [ ] 9 are representatives of - 9 are representatives of members with more than 1 million members with more than 1 grid users; million grid users; - 9 are representatives of - [ ] 9 are representatives of members with more than members with more than 100,000 100,000 and less than 1 million and less than 1 million grid users; grid users; and and - 9 are representatives of - [ ] 9 are representatives of members with less than members with less than 100,000 100,000 grid users; grid users;

  • 694. 
    (b) representatives of existing (b) representatives of existing

    DSO associations may participate DSO associations may as observers to the meetings of the participate as observers to the Board of Directors; meetings of the Board of Directors;

  • 695. 
    (c) the Board of Directors may (c) the Board of Directors not consist of more than 3 may not consist of more than 3 representatives of members based representatives of members in the same Member State or the based in the same Member

    same industrial group; State or the same industrial group;

ANNEX I TREE.2.B EN

  • 696. 
    (d) each Vice-President of the (d) each Vice-President of

    Board has to be nominated among the Board has to be nominated representatives of members in among representatives of each category described in members in each category paragraph (a) above; described in paragraph (a) above;

  • 697. 
    (e) representatives of members (e) representatives of based in one Member State or the members based in one

    same industrial group may not Member State or the same constitute the majority of the industrial group may not Expert Group participants; constitute the majority of the Expert Group participants;

  • 698. 
    (f) the Board of Directors shall (f) the Board of Directors establish a Strategic Advisory shall establish a Strategic

    group that provides its opinion to Advisory group that provides the Board of Directors and the its opinion to the Board of Expert Groups and consists of Directors and the Expert representatives of the European Groups and consists of DSO associations and representatives of the representatives of those Member European DSO associations States which are not represented and representatives of those in the Board of Directors. Member States which are not represented in the Board of Directors.

ANNEX I TREE.2.B EN

  • 699. 
    Article 51

    Tasks of the EU DSO entity

  • 700. 
    1. The tasks of the EU DSO AM 174 1. The tasks of the EU DSO

    entity shall be the following: 1. The tasks of the EU DSO entity shall be the following: entity shall be the following:

  • 701. 
    (a) coordinated operation (a) promote coordinated (a) (b in GA) [ ] promote

    and planning of transmission operation and planning of operation and planning of [ ] and distribution networks; transmission and distribution distribution networks in networks; cooperation with operation and planning of transmission networks;

  • 702. 
    (b) integration of renewable (b) improve and maximise the (b) (c in GA) facilitation of energy resources, distributed integration of renewable energy the integration of renewable

    generation and other resources resources, distributed generation energy resources, distributed embedded in the distribution and facilitate other resources generation and other resources network such as energy storage; embedded in the distribution embedded in the distribution network such as energy storage network such as energy storage; and sectoral integration;

  • 703. 
    (c) development of demand (c) facilitate the development of (c) (d in GA) facilitation of [ response; demand response; ] demand side flexibility and

    response, and distribution grid users’ access to markets;

  • 704. 
    (d) digitalisation of (d) improve the digitalisation of (d) (e in GA) contribute to distribution networks including distribution networks including the digitalisation of distribution deployment of smart grids and deployment of smart grids and [ ] systems including

    intelligent metering systems; smart metering systems; deployment of smart grids and intelligent metering systems;

ANNEX I TREE.2.B EN

  • 705. 
    (e) data management, cyber (e) guarantee non(e) (f in GA) support the security and data protection; discriminatory and neutral access development of data

    to data regardless of the data management, cyber security and management model, and promote data protection in cooperation standardization, cross-border data with relevant authorities and exchange, in particular with regulated entities; ENTSO for Electricity where relevant to facilitate data exchange, cyber security and data protection;

  • 706. 
    (f) participation in the (f) participate in the elaboration (f) (a in GA) participation in elaboration of network codes of network codes pursuant to the elaboration of network codes pursuant to Article 55. Article 55. which are relevant to the

    operation and planning of distribution grids and the coordinated operation of the transmission and distribution networks pursuant to Article 55.

  • 707. 
    2. In addition the EU DSO 2. In addition the EU DSO entity shall: entity shall:
  • 708. 
    (a) cooperate with ENTSO AM 175 (a) cooperate with ENTSO for electricity on the monitoring (a) cooperate effectively with for electricity on the monitoring of implementation of the ENTSO for electricity, the Agency of implementation of the

    network codes and guidelines and national regulators to network codes and guidelines which are relevant to the facilitate the monitoring by the which are relevant to the operation and planning of Agency and where relevant the operation and planning of distribution grids and the national regulatory authorities of distribution grids and the coordinated operation of the implementation of the network coordinated operation of the transmission and distribution codes and guidelines which are transmission and distribution networks and which are relevant to the operation and networks and which are adopted adopted pursuant to this planning of distribution grids and pursuant to this Regulation; Regulation; the coordinated operation of the transmission and distribution networks and which are adopted pursuant to this Regulation;

ANNEX I TREE.2.B EN

  • 709. 
    (b) cooperate with ENTSO (b) cooperate with ENTSO for electricity and adopt best for electricity and adopt best

    practices on the coordinated practices on the coordinated operation and planning of operation and planning of transmission and distribution transmission and distribution systems including issues such systems including issues such as as exchange of data between exchange of data between operators and coordination of operators and coordination of distributed energy resources; distributed energy resources;

  • 710. 
    (c) work on identifying best [ ]

    practices on the areas identified in paragraph 1 and for the introduction of energy efficiency improvements in the distribution network;

  • 711. 
    (d) adopt an annual work (d) adopt an annual work programme and an annual programme and an annual

    report; report;

  • 712. 
    (e) operate in full (e) operate in full compliance

    compliance with competition with competition rules and rules. ensure neutrality.

ANNEX I TREE.2.B EN

  • 713. 
    Article 52

    Consultations in the network code development process

  • 714. 
    1. While preparing possible AM 176 1. While preparing possible

    network codes pursuant to 1. While participating in the network codes pursuant to Article 55, the EU DSO entity elaboration of new network codes Article 55, the EU DSO entity shall conduct an extensive pursuant to Article 55, the EU DSO shall conduct an extensive consultation process, at an early entity shall conduct an extensive consultation process, at an early stage and in an open and consultation process, at an early stage and in an open and transparent manner, involving stage and in an open and transparent manner, involving all relevant stakeholders, and, transparent manner, involving all all relevant stakeholders, and, in in particular, the organisations relevant stakeholders, and, in particular, the organisations representing all stakeholders, in particular, the organisations representing all stakeholders, in accordance with the rules of representing all stakeholders, in accordance with the rules of procedure referred to in Article accordance with the rules of procedure referred to in Article 50. That consultation shall also procedure referred to in Article 50. 50. That consultation shall also involve national regulatory That consultation shall also involve involve [ ] regulatory authorities and other national national regulatory authorities and authorities and other national authorities, supply and other national authorities, supply authorities, supply and generation undertakings, system and generation undertakings, generation undertakings, system users including customers, system users including customers, users including customers, [ ], distribution system operators, distribution system operators, technical bodies and stakeholder including relevant industry including relevant industry platforms. It shall aim at associations, technical bodies associations, technical bodies and identifying the views and and stakeholder platforms. It stakeholder platforms. It shall aim proposals of all relevant parties shall aim at identifying the at identifying the views and during the decision-making views and proposals of all proposals of all relevant parties process. relevant parties during the during the decision-making decision-making process. process.

ANNEX I TREE.2.B EN

  • 715. 
    2. All documents and 2. All documents and minutes of meetings related to minutes of meetings related to the consultations referred to in the consultations referred to in paragraph 1 shall be made paragraph 1 shall be made public. public.
  • 716. 
    3. The EU DSO entity shall 3. The EU DSO entity shall take into consideration the take into consideration the views views provided during the provided during the

    consultations. Before adopting consultations. Before adopting proposals for network codes proposals for network codes referred to in Article 55 the EU referred to in Article 55 the EU DSO entity shall indicate how DSO entity shall indicate how the observations received the observations received during during the consultation have the consultation have been taken been taken into consideration. It into consideration. It shall shall provide reasons where provide reasons where observations have not been observations have not been taken into account. taken into account.

  • 717. 
    Article 53

    Cooperation between distribution system operators and transmission system operators

  • 718. 
    AM 177

    Article 53 – paragraph -1 (new) -1. The ENTSO for Electricity and the EU DSO entity shall develop a formal mechanism to facilitate cooperation between distribution system operators and transmission system operators.

ANNEX I TREE.2.B EN

  • 719. 
    1. Distribution system AM 178 1. Distribution system operators shall cooperate with 1. Distribution system operators and transmission transmission system operators operators and transmission system system operators shall

    in planning and operating their operators shall cooperate in cooperate with each other [ ] in networks. In particular, planning and operating their planning and operating their transmission and distribution networks. In particular, networks. In particular, system operators shall exchange transmission and distribution transmission and distribution all necessary information and system operators shall exchange all system operators shall exchange data regarding, the performance necessary information and data all necessary information and of generation assets and regarding, the performance of data regarding, the performance demand side response, the daily generation assets and demand side of generation assets and demand operation of their networks and response, the daily operation of side response, the daily the long-term planning of their networks and the long-term operation of their networks and network investments, with the planning of network investments, the long-term planning of view to ensure the costwith the view to ensure the costnetwork investments, with the efficient, secure and reliable efficient development and view to ensure the cost-efficient, development and operation of operation and the secure and secure and reliable development their networks. reliable operation of their and operation of their networks. networks.

  • 720. 
    2. Transmission and 2. Transmission and distribution system operators distribution system operators shall cooperate in order to shall cooperate with each other achieve coordinated access to in order to achieve coordinated resources such as distributed access to resources such as generation, energy storage or distributed generation, energy demand response that may storage or demand response that support particular needs of both may support particular needs of the distribution system and the both the distribution system and transmission system. the transmission system.

ANNEX I TREE.2.B EN

  • 721. 
    Chapter VII

    Network codes and guidelines

  • 722. 
    Article 54

    Adoption of network codes and guidelines

  • 723. 
    1. The Commission may, 1. The Commission may, Maintain Council GA subject to the empowerments in subject to the empowerments in

    Articles 55 and 57, adopt Articles 55 and 57, adopt [ ] delegated acts. Such delegated implementing acts. Such [ ] acts can either be adopted as implementing acts can either be network codes on the basis of adopted as network codes on the text proposals developed by the basis of text proposals ENTSO for Electricity, or, developed by the ENTSO for where so decided in the priority Electricity, or, where so decided list pursuant to Article 55 in the priority list pursuant to paragraph 2, by the EU DSO Article 55 paragraph 2, by the entity and the Agency pursuant EU DSO entity where relevant to the procedure in Article 55 or in mutual cooperation with the as guidelines pursuant to the ENTSO for Electricity and the procedure in Article 57. Agency pursuant to the procedure in Article 55 or as guidelines pursuant to the procedure in Article 57.

  • 724. 
    2. The network codes and 2. The network codes and Maintain Council GA guidelines shall guidelines shall
  • 725. 
    (a) ensure that they provide (a) ensure that they provide Maintain Council GA the minimum degree of the minimum degree of

    harmonisation required to harmonisation required to achieve the aims of this achieve the aims of this Regulation; Regulation;

  • 726. 
    (b) take into account, where (b) take into account, where Maintain Council GA appropriate, regional appropriate, regional

    specificities; specificities;

ANNEX I TREE.2.B EN

  • 727. 
    (c) not go beyond what is (c) not go beyond what is Maintain Council GA necessary for that purpose; and necessary for that purpose; and
  • 728. 
    (d) be without prejudice to (d) be without prejudice to Maintain Council GA the Member States’ right to the Member States’ right to

    establish national network establish national network codes codes which do not affect crosswhich do not affect cross [ ] border trade. zonal trade.

  • 729. 
    Article 55

    Establishment of network codes

  • 730. 
    1. The Commission is 1. The Commission is empowered to adopt delegated empowered to adopt [ ]

    acts in accordance with Article implementing acts in 63 concerning the establishment accordance with Article [ ] of network codes in the 62(2) in order to ensure following areas: uniform conditions for the implementation of this Regulation by establishing [ ] network codes in the following areas:

ANNEX I TREE.2.B EN

  • 731. 
    (a) network security and (a) network security and reliability rules including rules reliability rules including rules for technical transmission for technical transmission

    reserve capacity for operational reserve capacity for operational network security; network security including system states, remedial actions and operational security limits, voltage control and reactive power management, short-circuit current management, power flow management, contingency analysis and handling, protection equipment and schemes, data exchange, compliance, training, operational planning and security analysis, regional operational security coordination, outage coordination, availability plans of relevant assets, adequacy analysis, ancillary services, scheduling, and operational planning data environments;

ANNEX I TREE.2.B EN

  • 732. 
    (b) network connection (b) network connection rules rules; including connection of

    transmission-connected demand facilities, transmission-connected distribution facilities and distribution systems, connection of demand units used to provide demand response, requirements for grid connection of generators, requirements for high-voltage direct current grid connection, requirements for direct current-connected power park modules and remote-end highvoltage direct current converter stations, and operational notification procedures for grid connection;

  • 733. 
    (c) third-party access rules; (c) third-party access rules;
  • 734. 
    (d) data exchange and (d) data exchange and settlement rules; settlement rules;
  • 735. 
    (e) interoperability rules; (e) interoperability rules;
  • 736. 
    (f) operational procedures in (f) operational procedures in an emergency; an emergency including system defence plans, restoration

    plans, market interactions, information exchange and communication and tools and facilities;

ANNEX I TREE.2.B EN

  • 737. 
    (g) capacity-allocation and (g) capacity-allocation and congestion-management rules congestion-management rules [ including curtailment of ] including day ahead,

    generation and redispatch of intraday and forward capacity generation and demand; calculation methodologies and processes, grid models, bidding zone configuration, redispatching and countertrading, trading algorithms, single day-ahead and intraday coupling, firmness of allocated crosszonal capacity, congestion income distribution, crosszonal transmission risk hedging, nomination procedures, and capacity allocation and congestion management cost recovery ;

  • 738. 
    (h) rules for trading related (h) rules for trading related to to technical and operational technical and operational

    provision of network access provision of network access services and system balancing; services and system balancing including functions and responsibilities, platforms for the exchange of balancing energy, gate closure times, requirements for standard and specific products, procurement of balancing services, allocation of cross-zonal capacity for the exchange of balancing services or sharing of reserves, settlement of balancing energy, settlement

ANNEX I TREE.2.B EN

of exchanges of energy between system operators, imbalance settlement and settlement of balancing capacity;

  • 739. 
    (i) transparency rules; (i) transparency rules;
  • 740. 
    (j) balancing rules including (j) balancing rules including network-related reserve power network-related reserve power rules; rules including load frequency control, frequency quality

    defining and target parameters, frequency containment reserves, frequency restoration reserves, replacement reserves, exchange and sharing of reserves, cross-border activation processes of reserves, time-control processes and transparency of information;

  • 741. 
    (k) rules regarding AM 179 (k) rules regarding harmonised transmission and deleted harmonised transmission [ ] distribution tariff structures and tariff structures [as referred to connection charges including in Article 16] [ ] including locational signals and interlocational signals and intertransmission system operator transmission system operator compensation rules; compensation rules; energy efficiency regarding electricity networks;

ANNEX I TREE.2.B EN

  • 742. 
    (l) energy efficiency [ ] regarding electricity networks;
  • 743. 
    (m) rules for non(m) rules for nondiscriminatory, transparent discriminatory, transparent provision of non-frequency provision of non-frequency ancillary services, including ancillary services, including steady state voltage control, steady state voltage control, inertia, fast reactive current inertia, fast reactive current injection, black-start capability; injection, inertia for grid stability, short circuit current, black-start capability and island operation capability;
  • 744. 
    (n) demand response, [ ] including aggregation, energy

    storage, and demand curtailment rules;

  • 745. 
    (o) cyber security rules; and (o) sector-specific rules for cyber security [ ] aspects of

    cross-border electricity flows, on common minimum requirements, planning, monitoring, reporting and crisis management;

  • 746. 
    (p) rules concerning regional AM 180 [ ] operational centres. deleted

ANNEX I TREE.2.B EN

  • 747. 
    2. The Commission shall, after AM 181 2. The Commission shall, consulting the Agency, the 2. The Commission shall, after after consulting the Agency, the ENTSO for Electricity and the consulting the Agency, the ENTSO ENTSO for Electricity, the EU other relevant stakeholders, for Electricity, the EU DSO entity DSO Entity and the other

    establish a priority list every for electricity and the other relevant stakeholders, establish a three years, identifying the relevant stakeholders, establish a priority list every three years, areas set out in paragraph 1 to priority list every three years, identifying the areas set out be included in the development identifying the areas set out in in paragraph 1 to be included in of network codes. If the paragraph 1 to be included in the the development of network subject-matter of the network development of network codes. If codes. If the subject-matter of code is directly related to the the subject-matter of the network the network code is directly operation of the distribution code is directly related to the related to the operation of the system and less relevant for the operation of the distribution system distribution system and [ ] not transmission system, the and less relevant for the primarily relevant for the Commission may require the transmission system, the transmission, the Commission EU DSO entity for electricity Commission may require the EU may require the EU DSO entity instead of the ENTSO for DSO entity for electricity instead in cooperation with [ ] the Electricity to convene a drafting of the ENTSO for Electricity to ENTSO for Electricity to committee and submit a convene a drafting committee and convene a drafting committee proposal for a network code to submit a proposal for a network and submit a proposal for a the agency. code to the agency. network code to the agency.

ANNEX I TREE.2.B EN

  • 748. 
    3. The Commission shall 3. The Commission shall request the Agency to submit to request the Agency to submit to it within a reasonable period of it within a reasonable period of time not exceeding six months a time not exceeding six months a non-binding framework non-binding framework

    guideline (framework guideline (framework guideline) guideline) setting out clear and setting out clear and objective objective principles for the principles for the development development of network codes of network codes relating to the relating to the areas identified areas identified in the priority in the priority list. The request list. The request of the of the Commission may include Commission may include conditions which the conditions which the framework framework guideline shall guideline shall address. Each address. Each framework framework guideline shall guideline shall contribute to contribute to market integration, market integration, nonnon-discrimination, effective discrimination, effective competition, and the efficient competition, and the efficient functioning of the market. Upon functioning of the market. Upon a reasoned request from the a reasoned request from the Agency, the Commission may Agency, the Commission may extend that period. extend that period.

  • 749. 
    4. The Agency shall 4. The Agency shall formally consult the ENTSO formally consult the ENTSO for for Electricity, the EU DSO Electricity , the EU DSO entity, entity, and the other relevant and the other relevant

    stakeholders in regard to the stakeholders in regard to the framework guideline, during a framework guideline, during a period of no less than two period of no less than two months, in an open and months, in an open and transparent manner. transparent manner.

ANNEX I TREE.2.B EN

  • 750. 
    5. The Agency shall submit 5. The Agency shall submit a non-binding framework a non-binding framework

    guideline to the Commission guideline to the Commission where requested to do so under where requested to do so under paragraph 3. The Agency shall paragraph 3. The Agency shall review the non-binding review the non-binding framework guideline and reframework guideline and resubmit it to the Commission submit it to the Commission where requested to do so under where requested to do so under paragraph 6. paragraph 6.

  • 751. 
    6. If the Commission 6. If the Commission considers that the framework considers that the framework guideline does not contribute to guideline does not contribute to market integration, nonmarket integration, nondiscrimination, effective discrimination, effective competition and the efficient competition and the efficient functioning of the market, it functioning of the market, it may may request the Agency to request the Agency to review the review the framework guideline framework guideline within a within a reasonable period of reasonable period of time and retime and re-submit it to the submit it to the Commission. Commission.
  • 752. 
    7. If the Agency fails to 7. If the Agency fails to submit or re-submit a submit or re-submit a framework framework guideline within the guideline within the period set period set by the Commission by the Commission under

    under paragraphs 3 or 6, the paragraphs 3 or 6, the Commission shall elaborate the Commission shall elaborate the framework guideline in framework guideline in question. question.

ANNEX I TREE.2.B EN

  • 753. 
    8. The Commission shall 8. The Commission shall request the ENTSO for request the ENTSO for

    Electricity or, where so decided Electricity or, where so decided in the priority list pursuant to in the priority list pursuant to paragraph 2, the EU DSO entity paragraph 2, the EU DSO entity for Electricity, to submit a [ ] in co-operation with the proposal for a network code ENTSO for Electricity, to which is in line with the submit a proposal for a network relevant framework guideline, code which is in line with the to the Agency within a relevant framework guideline, to reasonable period of time not the Agency within a reasonable exceeding 12 months. period of time not exceeding 12 months.

  • 754. 
    9. The ENTSO for 9. The ENTSO for

    Electricity, or where so decided Electricity, or where so decided in the priority list pursuant to in the priority list pursuant to paragraph 2, the EU DSO paragraph 2, the EU DSO entity, entity, shall convene a drafting shall convene a drafting committee to support it in the committee to support it in the network code development network code development process. The drafting process. The drafting committee committee shall consist of shall consist of representatives representatives of the ENTSO of the ENTSO for Electricity, for Electricity, the Agency, the the Agency, where appropriate EU DSO entity, where of the EU DSO entity, where appropriate of nominated appropriate of nominated electricity market operators and electricity market operators and a limited number of the main a limited number of the main affected stakeholders.The affected stakeholders. The ENTSO for Electricity or where ENTSO for Electricity or where so decided in the priority list so decided in the priority list pursuant to paragraph 2 the EU pursuant to paragraph 2 the EU DSO entity,shall elaborate DSO entity, in co-operation proposals for network codes in with the ENTSO for the areas referred to in Electricity shall elaborate paragraph 1 upon a request proposals for network codes in

ANNEX I TREE.2.B EN

addressed to it by the the areas referred to in paragraph Commission in accordance with 1 upon a request addressed to it paragraph 8. by the Commission in accordance with paragraph 8.

  • 755. 
    10. The Agency shall revise 10. The Agency shall revise the network code and ensure the network code and ensure that that the network code is in line the network code is in line with with the relevant framework the relevant framework

    guideline and contributes to guideline and contributes to market integration, nonmarket integration, nondiscrimination, effective discrimination, effective competition, and the efficient competition, and the efficient functioning of the market and, functioning of the market and submit the revised network submit the revised network code code to the Commission within to the Commission within six six months of the day of the months of the day of the receipt receipt of the proposal. In the of the proposal . In the proposal proposal submitted to the submitted to the Commission, Commission, the Agency shall the Agency shall take into take into account the views account the views provided by provided by all involved parties all involved parties during the during the drafting of the drafting of the proposal led by proposal led by the ENTSO for the ENTSO for Electricity or the Electricity or the EU DSO EU DSO entity and shall entity and shall formally formally consult the relevant consult the relevant stakeholders on the version to be stakeholders on the version to submitted to the Commission. be submitted to the Commission.

ANNEX I TREE.2.B EN

  • 756. 
    11. Where the ENTSO for 11. Where the ENTSO for

    Electricity or the EU DSO Electricity or the EU DSO entity entity have failed to develop a have failed to develop a network network code within the period code within the period of time of time set by the Commission set by the Commission under under paragraph 8, the paragraph 8, the Commission Commission may request the may request the Agency to Agency to prepare a draft prepare a draft network code on network code on the basis of the basis of the relevant the relevant framework framework guideline. The guideline. The Agency may Agency may launch a further launch a further consultation in consultation in the course of the course of preparing a draft preparing a draft network code network code under this under this paragraph. The paragraph. The Agency shall Agency shall submit a draft submit a draft network code network code prepared under prepared under this paragraph this paragraph to the to the Commission and may Commission and may recommend that it be adopted. recommend that it be adopted.

  • 757. 
    12. The Commission may 12. The Commission may adopt, on its own initiative, adopt, on its own initiative, where the ENTSO for where the ENTSO for Electricity Electricity or the EU DSO or the EU DSO entity have entity have failed to develop a failed to develop a network network code, or the Agency code, or the Agency has failed to has failed to develop a draft develop a draft network code as network code as referred to in referred to in paragraph 11 of paragraph 11 of this Article, or this Article, or upon

    upon recommendation of the recommendation of the Agency Agency under paragraph 10 of under paragraph 10 of this this Article, one or more Article, one or more network network codes in the areas codes in the areas listed in listed in paragraph 1. paragraph 1.

ANNEX I TREE.2.B EN

  • 758. 
    13. Where the Commission 13. Where the Commission proposes to adopt a network proposes to adopt a network

    code on its own initiative, the code on its own initiative, the Commission shall consult the Commission shall consult the Agency, the ENTSO for Agency, the ENTSO for Electricity and all relevant Electricity and all relevant stakeholders in regard to the stakeholders in regard to the draft network code during a draft network code during a period of no less than two period of no less than two months. months.

  • 759. 
    14. This Article shall be 14. This Article shall be without prejudice to the without prejudice to the

    Commission's right to adopt Commission's right to adopt and and amend the guidelines as amend the guidelines as laid laid down in Article 57. It shall down in Article 57. It shall be be without prejudice to the without prejudice to the possibility for the ENTSO for possibility for the ENTSO for Electricity to develop non Electricity to develop nonbinding guidance in the areas binding guidance in the areas set set out in paragraph 1 where out in paragraph 1 where this this does not relate to areas does not relate to areas covered covered by a request addressed by a request addressed to it by to it by the Commission. This the Commission. This guidance shall be submitted to guidance shall be submitted to the Agency for an opinion. This the Agency for an opinion. This opinion shall be taken duly into opinion shall be taken duly into account by the ENTSO for account by the ENTSO for Electricity. Electricity.

ANNEX I TREE.2.B EN

  • 760. 
    Article 56

    Amendments of network codes

  • 761. 
    1. The Commission is 1. Until 31 December 2025 empowered to adopt delegated the Commission is empowered acts in accordance with Article to adopt [ ] implementing acts 63 concerning the amendment in accordance with Article [ ]

    of network codes following the 62(2) concerning the amendment procedure under Article 55. of network codes within the Amendments can also be areas listed in Article 55(1) proposed by the Agency under and following the procedure the procedure set out in under Article 55. [ ] paragraphs 2 to 4 of this Article.

  • 762. 
    2. Draft amendments to any AM 182 2. Draft amendments to network code adopted under 2. Draft amendments to any any network code adopted under Article 55 may be proposed to network code adopted under Article 55 may be proposed to the Agency by persons who are Article 55 may be proposed to the the Agency by persons who are likely to have an interest in that Agency by persons who are likely likely to have an interest in that network code, including the to have an interest in that network network code, including the

    ENTSO for Electricity, the EU code, including the ENTSO for ENTSO for Electricity, the EU DSO entity, transmission Electricity, the EU DSO entity, DSO entity, regulatory system operators, system users transmission and distribution authorities distribution and and consumers. The Agency system operators, system users and transmission system operators, may also propose amendments consumers. The Agency may also system users and consumers. on its own initiative. propose amendments on its own The Agency may also propose initiative. amendments on its own initiative.

ANNEX I TREE.2.B EN

  • 763. 
    3. The Agency may make 3. The Agency may make reasoned proposals for reasoned proposals for

    amendments to the amendments to the Commission Commission, explaining how explaining how such proposals such proposals are consistent are consistent with the with the objectives of the objectives of the network codes network codes set out in Article set out in Article 55(2). Where 55(2). Where it deems an it deems an amendment proposal amendment proposal admissible admissible and on amendments and on amendments on its own on its own initiative, the Agency initiative, the Agency shall shall consult all stakeholders in consult all stakeholders in accordance with Article 15 accordance with Article 15 [recast of Regulation (EC) No [recast of Regulation (EC) No 713/2009 i as proposed by 713/2009 as proposed by COM(2016) 863 i/2]. COM(2016) 863 i/2].

  • 764. 
    4. The Commission is 4. Until 31 December 2025 empowered to adopt, taking the Commission is empowered account of the Agency's to adopt, taking account of the proposals, amendments to any Agency's proposals,

    network code adopted under amendments to any network Article 55 6 as delegated acts in code adopted under Article 55 as accordance with Article 63. [ ] implementing acts in accordance with Article [ ] 62(2).

ANNEX I TREE.2.B EN

  • 765. 
    5. Consideration of [ ] proposed amendments under

    the procedure set out in Article 63 shall be limited to consideration of the aspects related to the proposed amendment. Those proposed amendments are without prejudice to other amendments which the Commission may propose.

  • 766. 
    AM 183

    Article 56 a (new) Article 56 a By 31 December 2022 the Commission shall assess the existing implementing acts containing network codes and guidelines in order to evaluate which of their elements could be usefully enshrined in legislative acts of the Union concerning the internal electricity market. The Commission shall submit a detailed report of its assessment to the European Parliament and to the Council. That report shall be accompanied, where appropriate, by legislative proposals following up on the Commission's assessment.

ANNEX I TREE.2.B EN

  • 767. 
    Article 57

    Guidelines

  • 768. 
    1. The Commission may 1. Until 31 December 2025 adopt binding guidelines in the the Commission may adopt

    areas listed below. binding guidelines by in the areas listed below. Those

    guidelines shall be adopted as implementing acts in accordance with the examination procedure referred to in Article 62(2).

  • 769. 
    2. The Commission may 2. Until 31 December 2025 adopt a delegated act as a the Commission may adopt [ ] Guideline in the areas where implementing acts as a

    such acts could also be Guideline in the areas where developed under the network such acts could also be code procedure pursuant to developed under the network Article 55 (1). code procedure pursuant to Article 55 (1).

  • 770. 
    3. Guidelines may be 3. Guidelines may be adopted relating to the interadopted relating to the intertransmission system operator transmission system operator compensation mechanism. They compensation mechanism. They shall specify, in accordance shall specify, in accordance with with the principles set out in the principles set out in Articles

5834/5/18 REV 5 BL/ns 286

ANNEX I TREE.2.B EN

  • 771. 
    (a) details of the procedure (a) details of the procedure for determining which for determining which

    transmission system operators transmission system operators are liable to pay compensation are liable to pay compensation for cross-border flows including for cross-border flows including as regards the split between the as regards the split between the operators of national operators of national transmission systems from transmission systems from which cross-border flows which cross-border flows originate and the systems where originate and the systems where those flows end, in accordance those flows end, in accordance with Article 46(2); with Article 46(2);

  • 772. 
    (b) details of the payment (b) details of the payment procedure to be followed, procedure to be followed,

    including the determination of including the determination of the first period for which the first period for which compensation is to be paid, in compensation is to be paid, in accordance with the second accordance with the second subparagraph of Article 46(3); subparagraph of Article 46(3);

  • 773. 
    (c) details of methodologies (c) details of methodologies for determining the crossfor determining the cross-border border flows hosted for which flows hosted for which

    compensation is to be paid compensation is to be paid under under Article 46, in terms of Article 46, in terms of both both quantity and type of flows, quantity and type of flows, and and the designation of the the designation of the magnitudes of such flows as magnitudes of such flows as originating and/or ending in originating and/or ending in transmission systems of transmission systems of individual Member States, in individual Member States, in accordance with Article 46(5); accordance with Article 46(5);

ANNEX I TREE.2.B EN

  • 774. 
    (d) details of the (d) details of the methodology for determining methodology for determining the the costs and benefits incurred costs and benefits incurred as a as a result of hosting crossresult of hosting cross-border border flows, in accordance flows, in accordance with with Article 46(6); Article 46(6);
  • 775. 
    (e) details of the treatment in (e) details of the treatment in the context of the interthe context of the intertransmission

    system operator transmission system operator compensation mechanism of compensation mechanism of electricity flows originating or electricity flows originating or ending in countries outside the ending in countries outside the European Economic Area; and European Economic Area; and

  • 776. 
    (f) the participation of (f) the participation of national systems which are national systems which are interconnected through direct interconnected through direct current lines, in accordance current lines, in accordance with with Article 46. Article 46.

ANNEX I TREE.2.B EN

  • 777. 
    4. Guidelines may also 4. Guidelines may also determine appropriate rules determine appropriate rules relating to charges applied to relating to charges applied to producers, energy storage and producers, energy storage and customers (load) under national customers (load) under national distribution and transmission [ ] transmission tariff systems [ tariff systems and connection ], including the reflection of the regimes, including the inter-transmission system reflection of the interoperator compensation

    transmission system operator mechanism in national network compensation mechanism in charges and the provision of national network charges and appropriate and efficient the provision of appropriate and locational signals, in accordance efficient locational signals, in with the principles set out in accordance with the principles Article 16. set out in Article 16.

  • 778. 
    The guidelines may make The guidelines may make provision for appropriate and provision for appropriate and efficient harmonised locational efficient harmonised locational signals at Union level. signals at Union level.
  • 779. 
    Any such harmonisation shall Any such harmonisation shall not prevent Member States not prevent Member States from from applying mechanisms to applying mechanisms to ensure ensure that network access that network access charges

    charges borne by customers borne by customers (load) are (load) are comparable comparable throughout their throughout their territory. territory.

ANNEX I TREE.2.B EN

  • 780. 
    5. Where appropriate, 5. Where appropriate, guidelines providing the guidelines providing the minimum degree of minimum degree of

    harmonisation required to harmonisation required to achieve the aim of this achieve the aim of this Regulation may also specify: Regulation may also specify:

  • 781. 
    (a) details of rules for the (a) details of rules for the trading of electricity; trading of electricity;(b) details of investment incentive rules for interconnector capacity

    including locational signals; 782. (b) details of investment (b) details of investment

    incentive rules for incentive rules for interconnector capacity interconnector capacity including locational signals; including locational signals;

  • 783. 
    6. The Commission may 6. The Commission may adopt guidelines on the adopt guidelines on the

    implementation of operational implementation of operational coordination between coordination between transmission system operators transmission system operators at at Union level. Those Union level. Those guidelines guidelines shall be consistent shall be consistent with and with and build upon the build upon the network codes network codes referred to in referred to in Article 55 of this Article 55 of this Regulation Regulation and build upon the and build upon the adopted adopted specifications referred specifications referred to in to in Article 27(1)(g) of this Article 27(1)(g) of this Regulation. When adopting Regulation. When adopting those guidelines, the those guidelines, the Commission shall take into Commission shall take into account differing regional and account differing regional and national operational national operational requirements. requirements.

ANNEX I TREE.2.B EN

  • 784. 
    Those guidelines shall be [Those guidelines shall be adopted in accordance with the adopted in accordance with the examination procedure referred examination procedure referred to in Article 62(2). to in Article 62(2). ]
  • 785. 
    7. When adopting or AM 184 7. When adopting or amending guidelines, the 7. When adopting or amending amending guidelines, the Commission shall consult the guidelines, the Commission shall Commission shall consult the Agency, the ENTSO for consult the Agency, the ENTSO for Agency, the ENTSO for Electricity and other Electricity, the EU DSO entity and Electricity, the EU DSO Entity stakeholders where relevant. other stakeholders where relevant. and other stakeholders where relevant.
  • 786. 
    Article 58

    Right of Member States to provide for more detailed measures

  • 787. 
    This Regulation shall be This Regulation shall be without without prejudice to the rights prejudice to the rights of

    of Member States to maintain Member States to maintain or or introduce measures that introduce measures that contain contain more detailed more detailed provisions than provisions than those set out in those set out in this Regulation, this Regulation, in the in the guidelines referred to in guidelines referred to in Article Article 57 or in the network 57 or in the network codes codes referred to in Article 55, referred to in Article 55, provided those measures do not [ provided those measures do not ] contradict of Union endanger the effectiveness of legislation. Union legislation.

ANNEX I TREE.2.B EN

  • 788. 
    Article 58a

    By 31 December 2023 the Commission shall assess the existing implementing acts containing network codes and guidelines in order to evaluate which of their elements could be usefully enshrined in legislative acts of the Union concerning the internal electricity market and how the empowerments for network codes and guidelines pursuant to Articles 55 and 57 could be revised. The Commission shall submit a detailed report of its assessment to the European Parliament and the Council. That report shall be accompanied, where appropriate, by legislative proposals following up on the Commission's assessment.

ANNEX I TREE.2.B EN

  • 789. 
    Chapter VIII

    Final provisions

  • 790. 
    Article 59

    New interconnectors

  • 791. 
    1. New direct current 1. New direct current interconnectors may, upon interconnectors may, upon request, be exempted, for a request, be exempted, for a limited period of time, from the limited period of time, from the provisions of Article 17(2) of provisions of Article 17(2) of this Regulation and Articles 6, this Regulation and Articles 6, 43 59(6) and 60(1) of [recast of 43, 59(6) and 60(1) of [recast of Directive 2009/72/EC i as Directive 2009/72/EC i as proposed by COM(2016) proposed by COM(2016) 864 i/2] 864/2] under the following under the following conditions:

    conditions:

  • 792. 
    (a) the investment must (a) the investment must enhance competition in enhance competition in

    electricity supply; electricity supply; 793. (b) the level of risk attached (b) the level of risk attached

    to the investment is such that to the investment is such that the the investment would not take investment would not take place place unless an exemption is unless an exemption is granted; granted;

  • 794. 
    (c) the interconnector must (c) the interconnector must be be owned by a natural or legal owned by a natural or legal

    person which is separate at least person which is separate at least in terms of its legal form from in terms of its legal form from the system operators in whose the system operators in whose systems that interconnector will systems that interconnector will be built; be built;

  • 795. 
    (d) charges are levied on (d) charges are levied on users of that interconnector; users of that interconnector;

ANNEX I TREE.2.B EN

  • 796. 
    (e) since the partial market (e) since the partial market opening referred to in Article opening referred to in Article 19 19 of Directive 96/92/EC i of the of Directive 96/92/EC i of the European Parliament and of the European Parliament and of the Council 31 , no part of the capital Council 32 , no part of the capital or operating costs of the or operating costs of the

    interconnector has been interconnector has been recovered from any component recovered from any component of charges made for the use of of charges made for the use of transmission or distribution transmission or distribution systems linked by the systems linked by the interconnector; and interconnector; and

  • 797. 
    (f) the exemption must not (f) the exemption must not be be to the detriment of to the detriment of competition

    competition or the effective or the effective functioning of functioning of the internal the internal market in electricity, market in electricity, or the or the efficient functioning of efficient functioning of the the regulated system to which regulated system to which the the interconnector is linked. interconnector is linked.

31 Directive 96/92/EC i of the European Parliament and of the Council of 19 December 1996 concerning common rules for the internal market in electricity (OJ L 27, 30.1.1997, p. 20).

32 Directive 96/92/EC i of the European Parliament and of the Council of 19 December 1996 concerning common rules for the internal market in electricity (OJ L 27, 30.1.1997, p. 20).

ANNEX I TREE.2.B EN

  • 798. 
    2. Paragraph 1 shall also 2. Paragraph 1 shall also apply, in exceptional cases, to apply, in exceptional cases, to alternating current alternating current

    interconnectors provided that interconnectors provided that the the costs and risks of the costs and risks of the investment investment in question are in question are particularly high particularly high when when compared with the costs compared with the costs and and risks normally incurred risks normally incurred when when connecting two connecting two neighbouring neighbouring national national transmission systems transmission systems by an by an alternating current alternating current interconnector. interconnector.

  • 799. 
    3. Paragraph 1 shall also 3. Paragraph 1 shall also apply to significant increases of apply to significant increases of capacity in existing capacity in existing

    interconnectors. interconnectors. 800. 4. The decision on the 4. The decision on the

    exemption under paragraphs 1, exemption under paragraphs 1, 2 2 and 3 shall be taken on a and 3 shall be taken on a casecase-by-case basis by the by-case basis by the regulatory regulatory authorities of the authorities of the Member States Member States concerned. An concerned. An exemption may exemption may cover all or part cover all or part of the capacity of the capacity of the new of the new interconnector, or of interconnector, or of the the existing interconnector with existing interconnector with significantly increased capacity. significantly increased capacity.

ANNEX I TREE.2.B EN

  • 801. 
    Within two months from the Within two months from the date on which the request for date on which the request for exemption was received by the exemption was received by the last of the regulatory authorities last of the regulatory authorities concerned, the Agency may concerned, the Agency may submit an advisory opinion to submit an advisory opinion to those regulatory authorities those regulatory authorities which could provide a basis for which could provide a basis for their decision. their decision.
  • 802. 
    In deciding to grant an In deciding to grant an exemption, consideration shall exemption, consideration shall be given, on a case-by-case be given, on a case-by-case basis, to the need to impose basis, to the need to impose conditions regarding the conditions regarding the duration of the exemption and duration of the exemption and non-discriminatory access to non-discriminatory access to the the interconnector. When interconnector. When deciding deciding those conditions, those conditions, account shall, account shall, in particular, be in particular, be taken of taken of additional capacity to additional capacity to be built or be built or the modification of the modification of existing existing capacity, the timecapacity, the time-frame of the frame of the project and project and national

    national circumstances. circumstances.

ANNEX I TREE.2.B EN

  • 803. 
    Before granting an exemption, Before granting an exemption, the regulatory authorities of the the regulatory authorities of the Member States concerned shall Member States concerned shall decide upon the rules and decide upon the rules and

    mechanisms for management mechanisms for management and allocation of capacity. and allocation of capacity. Congestion-management rules Congestion-management rules shall include the obligation to shall include the obligation to offer unused capacity on the offer unused capacity on the market and users of the facility market and users of the facility shall be entitled to trade their shall be entitled to trade their contracted capacities on the contracted capacities on the secondary market. In the secondary market. In the assessment of the criteria assessment of the criteria referred to in points (a), (b) and referred to in points (a), (b) and (f) of paragraph 1, the results of (f) of paragraph 1, the results of the capacity-allocation the capacity-allocation procedure shall be taken into procedure shall be taken into account. account.

  • 804. 
    Where all the regulatory Where all the regulatory authorities concerned have authorities concerned have reached agreement on the reached agreement on the exemption decision within six exemption decision within six months, they shall inform the months, they shall inform the Agency of that decision. Agency of that decision.
  • 805. 
    The exemption decision, The exemption decision, including any conditions including any conditions referred to in the second referred to in the second subparagraph of this paragraph, subparagraph of this paragraph, shall be duly reasoned and shall be duly reasoned and published. published.

ANNEX I TREE.2.B EN

  • 806. 
    5. The decision referred to 5. The decision referred to in in paragraph 4 shall be taken by paragraph 4 shall be taken by the the Agency: Agency:
  • 807. 
    (a) where all the regulatory (a) where all the regulatory authorities concerned have not authorities concerned have not been able to reach an agreement been able to reach an agreement within six months from the date within six months from the date the exemption was requested the exemption was requested before the last of those before the last of those

    regulatory authorities; or regulatory authorities; or 808. (b) upon a joint request from (b) upon a joint request from

    the regulatory authorities the regulatory authorities concerned. concerned. Before taking such a decision, Before taking such a decision, the Agency shall consult the the Agency shall consult the regulatory authorities regulatory authorities concerned concerned and the applicants. and the applicants.

  • 809. 
    6. Notwithstanding 6. Notwithstanding paragraphs 4 and 5, Member paragraphs 4 and 5, Member States may provide for the States may provide for the regulatory authority or the regulatory authority or the Agency, as the case may be, to Agency, as the case may be, to submit, for formal decision, to submit, for formal decision, to the relevant body in the the relevant body in the Member Member State, its opinion on State, its opinion on the request the request for an exemption. for an exemption. That opinion That opinion shall be published shall be published together with together with the decision. the decision.

ANNEX I TREE.2.B EN

  • 810. 
    7. A copy of every request 7. A copy of every request for exemption shall be for exemption shall be

    transmitted for information transmitted for information without delay by the regulatory without delay by the regulatory authorities to the Agency and to authorities to the Agency and to the Commission on receipt. The the Commission on receipt. The decision shall be notified, decision shall be notified, without delay, by the regulatory without delay, by the regulatory authorities concerned or by the authorities concerned or by the Agency (notifying bodies), to Agency (notifying bodies), to the Commission, together with the Commission, together with all the relevant information all the relevant information with with respect to the decision. respect to the decision. That That information may be information may be submitted to submitted to the Commission in the Commission in aggregate aggregate form, enabling the form, enabling the Commission Commission to reach a wellto reach a well-founded founded decision. In particular, decision. In particular, the the information shall contain: information shall contain:

ANNEX I TREE.2.B EN

  • 811. 
    (a) the detailed reasons on (a) the detailed reasons on the the basis of which the basis of which the exemption

    exemption was granted or was granted or refused, refused, including the financial including the financial information justifying the need information justifying the need for the exemption; for the exemption;

  • 812. 
    (b) the analysis undertaken (b) the analysis undertaken of of the effect on competition and the effect on competition and the the effective functioning of the effective functioning of the

    internal market in electricity internal market in electricity resulting from the grant of the resulting from the grant of the exemption; exemption;

  • 813. 
    (c) the reasons for the time (c) the reasons for the time period and the share of the total period and the share of the total capacity of the interconnector capacity of the interconnector in in question for which the question for which the

    exemption is granted; and exemption is granted; and 814. (d) the result of the (d) the result of the

    consultation of the regulatory consultation of the regulatory authorities concerned. authorities concerned.

ANNEX I TREE.2.B EN

  • 815. 
    8. Within a period of 50

    working days from the day 8. Within a period of 50 following receipt of notification working days from the day under paragraph 7, the following receipt of notification Commission may take a under paragraph 7, the decision requesting the Commission may take a decision notifying bodies to amend or requesting the notifying bodies withdraw the decision to grant to amend or withdraw the an exemption. That period of 50 decision to grant an exemption. working days may be extended That period of 50 working days by an additional period of 50 may be extended by an working days where further additional period of 50 working information is sought by the days where further information Commission. That additional is sought by the Commission. period shall begin on the day That additional period shall following receipt of the begin on the day following complete information. The receipt of the complete initial period may also be information. The initial period extended by consent of both the may also be extended by consent Commission and the notifying of both the Commission and the bodies. notifying bodies.

ANNEX I TREE.2.B EN

  • 816. 
    When the requested information When the requested information is not provided within the is not provided within the period period set out in the request, the set out in the request, the

    notification shall be deemed to notification shall be deemed to be withdrawn unless, before the be withdrawn unless, before the expiry of that period, either the expiry of that period, either the period is extended by consent period is extended by consent of of both the Commission and the both the Commission and the notifying bodies, or the notifying bodies, or the notifying notifying bodies, in a duly bodies, in a duly reasoned reasoned statement, inform the statement, inform the Commission that they consider Commission that they consider the notification to be complete. the notification to be complete.

  • 817. 
    The notifying bodies shall The notifying bodies shall comply with a Commission comply with a Commission decision to amend or withdraw decision to amend or withdraw the exemption decision within the exemption decision within one month and shall inform the one month and shall inform the Commission accordingly. Commission accordingly.
  • 818. 
    The Commission shall preserve The Commission shall preserve the confidentiality of the confidentiality of

    commercially sensitive commercially sensitive information. information.

  • 819. 
    The Commission's approval of The Commission's approval of an exemption decision shall an exemption decision shall

    expire two years after the date expire two years after the date of of its adoption in the event that its adoption in the event that construction of the construction of the interconnector has not yet interconnector has not yet started by that date, and five started by that date, and five years after the date of its years after the date of its adoption if the interconnector adoption if the interconnector has not become operational by has not become operational by that date, unless the that date, unless the Commission Commission decides, on the decides, on the basis of a

ANNEX I TREE.2.B EN

basis of a reasoned request by reasoned request by the the notifying bodies, that any notifying bodies, that any delay delay is due to major obstacles is due to major obstacles beyond beyond the control of the the control of the person to person to whom the exemption whom the exemption has been has been granted. granted.

  • 820. 
    9. Where the regulatory Where the regulatory authorities authorities of the Member of the Member States concerned States concerned decide to decide to modify a decision

    modify a decision under under paragraph 1, they shall paragraph 1, they shall notify notify this decision without this decision without delay to delay to the Commission, the Commission, together with together with all the relevant all the relevant information information with respect to the with respect to the decision. decision. Paragraphs 1 to 8 shall Paragraphs 1 to 8 shall apply to apply to this notified decision, this notified decision, taking taking into account the into account the particularities particularities of the existing of the existing exemption. exemption.

  • 821. 
    10. The Commission may, The Commission may, upon upon request or on its own request or on its own initiative, initiative, reopen the reopen the proceedings:

    proceedings: 822. (a) where, taking due (a) where, taking due

    consideration of legitimate consideration of legitimate expectations by the parties and expectations by the parties and of the economic balance of the economic balance achieved in the original achieved in the original exemption decision, there has exemption decision, there has been a material change in any been a material change in any of of the facts on which the the facts on which the decision decision was based; was based;

ANNEX I TREE.2.B EN

  • 823. 
    (b) where the undertakings (b) where the undertakings concerned act contrary to their concerned act contrary to their commitments; or commitments; or
  • 824. 
    (c) where the decision was (c) where the decision was based on incomplete, incorrect based on incomplete, incorrect or misleading information or misleading information

    provided by the parties. provided by the parties. 825. 11. The Commission is 11. The Commission is

    empowered to adopt delegated empowered to adopt delegated acts in accordance with Article acts in accordance with Article 63 concerning the adoption of 63 concerning the adoption of guidelines for the application of guidelines for the application of the conditions laid down in the conditions laid down in paragraph 1 of this Article and paragraph 1 of this Article and to set out the procedure to be to set out the procedure to be followed for the application of followed for the application of paragraphs 4, 7 8, 9 and 10 of paragraphs 4, 7, 8, 9 and 10 of this Article. this Article.

  • 826. 
    Article 59a

    Derogations

  • 827. 
    1. Member States may apply for derogations from the relevant provisions of Articles 3, 5, 6 (1), 7 (1) and (4), 8 to 10, 13 to 15, 17 to 22, 23 (1), (2), (4) (5) and (5a), 24, 32 to 44 and 48 in the following cases:

ANNEX I TREE.2.B EN

  • 828. 
    (a) the Member State can demonstrate that there are substantial problems for the operation of their small

    isolated and connected systems. In this case, the derogation shall be limited in time and subject to conditions aiming at increased competition and integration with the internal market.

  • 829. 
    (b) for outermost regions within the meaning of Article 349 of TFEU, that cannot be interconnected with the

    European energy market for evident physical reasons. In this case, the derogation is not limited in time.

ANNEX I TREE.2.B EN

  • 830. 
    In both cases, the derogation shall be subject to conditions aimed at ensuring that the

    derogation does not hamper the transition towards renewable energies.

  • 831. 
    When granting a derogation, the Commission shall reflect in its decision to which extent the derogations must take into

    account the application of the network codes and guidelines.

  • 832. 
    If a derogation is granted, the

    Commission shall inform the Member States of those applications before taking a decision, taking into account respect for confidentiality.

  • 833. 
    2. Articles 3, 4, 5, 6 (1),

    (2)(c), (2)(h), 7 to 10, 12 to 15, 17 to 22, 23 (1), (2), (5) and (5a), 23(4)(b), 24, 31(2), (3), 32 to 44, 46 and 48 shall not apply to Cyprus until its transmission system becomes connected to other Member States’ transmission systems via interconnections.

ANNEX I TREE.2.B EN

  • 834. 
    If the transmission system of

    Cyprus is not connected to other Member States’ transmission systems via interconnections by 1 January 2026, Cyprus shall assess the need for derogation from those provisions and may submit a request for continued derogation to the Commission. The Commission shall assess whether the application of the respective provisions risks causing substantial problems for the operation of the electricity system in Cyprus or whether their application in Cyprus is expected to provide benefits to market functioning. On the basis of this assessment, the Commission shall issue a reasoned decision on full or partial prolongation of the derogation which shall be published in the Official Journal of the European Union.

  • 835. 
    3. The provisions of the

    Regulation shall not affect the application of the derogations pursuant to the [Electricity Directive].

ANNEX I TREE.2.B EN

  • 836. 
    Article 60

    Provision of information and confidentiality

  • 837. 
    1. Member States and the 1. Member States and the

    regulatory authorities shall, on regulatory authorities shall, on request, provide to the request, provide to the Commission all information Commission all information necessary for the purposes of necessary for the purposes of enforcing the provisions of this enforcing the provisions of this Regulation. Regulation.

  • 838. 
    The Commission shall fix a The Commission shall fix a

    reasonable time limit within reasonable time limit within which the information is to be which the information is to be provided, taking into account provided, taking into account the the complexity of the complexity of the information information required and the required and the urgency with urgency with which the which the information is needed. information is needed.

  • 839. 
    2. If the Member State or 2. If the Member State or the

    the regulatory authority regulatory authority concerned concerned does not provide the does not provide the information information referred to in referred to in paragraph 1 within paragraph 1 within the given the given time-limit pursuant to time-limit pursuant to paragraph 1, the Commission paragraph 1 , the Commission may request all information may request all information necessary for the purpose of necessary for the purpose of enforcing the provisions of this enforcing the provisions of this Regulation directly from the Regulation directly from the undertakings concerned. undertakings concerned.

  • 840. 
    When sending a request for When sending a request for

    information to an undertaking, information to an undertaking, the Commission shall at the the Commission shall at the same time forward a copy of same time forward a copy of the the request to the regulatory request to the regulatory authorities of the Member State authorities of the Member State in whose territory the seat of in whose territory the seat of the the undertaking is situated. undertaking is situated.

ANNEX I TREE.2.B EN

  • 841. 
    3. In its request for 3. In its request for information under paragraph 1, information under paragraph 1, the Commission shall state the the Commission shall state the legal basis of the request, the legal basis of the request, the time-limit within which the time-limit within which the information is to be provided, information is to be provided, the purpose of the request, and the purpose of the request, and the penalties provided for in the penalties provided for in Article 61(2) for supplying Article 61(2) for supplying incorrect, incomplete or incorrect, incomplete or misleading information. The misleading information. The Commission shall fix a Commission shall fix a reasonable time-limit taking reasonable time-limit taking into into account the complexity of account the complexity of the the information required and information required and the the urgency with which the urgency with which the information is needed. information is needed.
  • 842. 
    4. The owners of the 4. The owners of the undertakings or their undertakings or their

    representatives and, in the case representatives and, in the case of legal persons, the persons of legal persons, the persons authorised to represent them by authorised to represent them by law or by their instrument of law or by their instrument of incorporation, shall supply the incorporation, shall supply the information requested. Where information requested. Where lawyers duly authorised so to lawyers duly authorised so to act act supply the information on supply the information on behalf behalf of their clients, the client of their clients, the client shall shall remain fully responsible in remain fully responsible in the the event that the information event that the information supplied is incomplete, supplied is incomplete, incorrect incorrect or misleading. or misleading.

ANNEX I TREE.2.B EN

  • 843. 
    5. Where an undertaking 5. Where an undertaking does not provide the does not provide the information information requested within requested within the time-limit the time-limit fixed by the fixed by the Commission or Commission or supplies supplies incomplete information, incomplete information, the the Commission may by

    Commission may by decision decision require the information require the information to be to be provided. That decision provided. That decision shall shall specify what information is specify what information is required and fix an appropriate required and fix an appropriate time-limit within which it is to time-limit within which it is to be supplied. It shall indicate the be supplied. It shall indicate the penalties provided for in Article penalties provided for in Article 61(2). It shall also indicate the 61(2). It shall also indicate the right to have the decision right to have the decision reviewed by the Court of Justice reviewed by the Court of of the European Union. Justice of the European Union .

  • 844. 
    The Commission shall, at the The Commission shall, at the same time, send a copy of its same time, send a copy of its decision to the regulatory decision to the regulatory

    authorities of the Member State authorities of the Member State within the territory of which the within the territory of which the person is resident or the seat of person is resident or the seat of the undertaking is situated. the undertaking is situated.

ANNEX I TREE.2.B EN

  • 845. 
    6. The information referred 6. The information referred to in paragraphs 1 and 2 shall to in paragraphs 1 and 2 shall be be used only for the purposes of used only for the purposes of enforcing the provisions of this enforcing the provisions of this Regulation. Regulation.
  • 846. 
    The Commission shall not The Commission shall not disclose information of the kind disclose information of the kind covered by the obligation of covered by the obligation of professional secrecy which is professional secrecy which is acquired pursuant to this acquired pursuant to this

    Regulation. Regulation.

  • 847. 
    Article 61

    Penalties

  • 848. 
    1. Without prejudice to 1. Without prejudice to paragraph 2, the Member States paragraph 2, the Member States shall lay down rules on shall lay down rules on penalties penalties applicable to applicable to infringements of infringements of the provisions the provisions of this

    of this Regulation, the network Regulation, the network codes codes adopted pursuant to adopted pursuant to Article 55, Article 55, and the guidelines and the guidelines adopted adopted pursuant to Article 57 pursuant to Article 57 and shall and shall take all measures take all measures necessary to necessary to ensure that those ensure that those provisions are provisions are implemented. implemented. The penalties The penalties provided for must provided for must be effective, be effective, proportionate and proportionate and dissuasive. dissuasive.

  • 849. 
    2. The Commission may, by 2. The Commission may, by decision, impose on decision, impose on

    undertakings fines not undertakings fines not exceeding exceeding 1 % of the total 1 % of the total turnover in the turnover in the preceding preceding business year where, business year where, intentionally or negligently, they intentionally or negligently, supply incorrect, incomplete or

ANNEX I TREE.2.B EN

they supply incorrect, misleading information in incomplete or misleading response to a request made information in response to a pursuant to Article 60(3) or fail request made pursuant to to supply information within the Article 60(3) or fail to supply time-limit fixed by a decision information within the timeadopted pursuant to the first limit fixed by a decision subparagraph of Article 60(5). In adopted pursuant to the first setting the amount of a fine, the subparagraph of Article 60(5). Commission shall have regard to In setting the amount of a fine, the gravity of the failure to the Commission shall have comply with the requirements of regard to the gravity of the the first subparagraph. failure to comply with the requirements of the first subparagraph.

  • 850. 
    3. Penalties provided for 3. Penalties provided for pursuant to paragraph 1 and pursuant to paragraph 1 and decisions taken pursuant to decisions taken pursuant to paragraph 2 shall not be of a paragraph 2 shall not be of a criminal law nature. criminal law nature.
  • 851. 
    Article 62

    Committee procedure

ANNEX I TREE.2.B EN

  • 853. 
    2. Where reference is made 2. Where reference is made

    to this paragraph, Article 5 of to this paragraph, Article 5 of Regulation (EU) No 182/2011 i Regulation (EU) No 182/2011 i of of the European Parliament and the European Parliament and of of the Council 33 shall apply. the Council

    34 shall apply.

  • 854. 
    Article 63

    Exercise of the delegation

  • 855. 
    1. The power to adopt 1. The power to adopt delegated acts is conferred on delegated acts is conferred on the Commission subject to the the Commission subject to the conditions laid down in this conditions laid down in this Article. Article.
  • 856. 
    2. The power to adopt 2. The power to adopt delegated acts referred to in delegated acts referred to in Article 31(3), Article 46(4), Article [ ] 46(4), [ ] and Article 55(1), Article 56(1) and Article 59(11) shall be conferred (4), and Article 59(11) shall be on the Commission for an conferred on the Commission undetermined period of time for an undetermined period of from the [OP: please insert the time from the [OP: please insert date of entry into force]. the date of entry into force].

33 Regulation (EU) No 182/2011 i of the European Parliament and of the Council of 16 February 2011 laying down the rules and general principles concerning mechanisms for control by Member States of the Commission’s exercise of implementing powers (OJ L 55, 28.2.2011, p. 13).

34 Regulation (EU) No 182/2011 i of the European Parliament and of the Council of 16 February 2011 laying down the rules and general principles concerning mechanisms for control by Member States of the Commission’s exercise of implementing powers (OJ L 55, 28.2.2011, p. 13).

ANNEX I TREE.2.B EN

  • 857. 
    3. The delegation of power 3. The delegation of power referred to in Article 31(3), referred to in [ ] Article 46(4), [ Article 46(4), Article 55(1), ] and Article 59(11) may be

    Article 56(1) and (4), and revoked at any time by the Article 59(11) may be revoked European Parliament or by the at any time by the European Council. A decision to revoke Parliament or by the Council. A shall put an end to the delegation decision to revoke shall put an of power specified in that end to the delegation of power decision. It shall take effect on specified in that decision. It the day following the shall take effect on the day publication of the decision in the following the publication of the Official Journal of the European decision in the Official Journal Union or at a later date specified of the European Union or at a therein. It shall not affect the later date specified therein. It validity of any [delegated] act shall not affect the validity of already in force. any delegated act already in force.

  • 858. 
    4. Before adopting a 4. Before adopting a delegated act, the Commission delegated act, the Commission shall consult experts designated shall consult Electricity Crossby each Member State in border Committee and experts accordance with the principles designated by each Member laid down in the State in accordance with the Interinstitutional Agreement on principles laid down in the Better Law-Making of 13 April Interinstitutional Agreement on 2016. Better Law-Making of 13 April 2016.

ANNEX I TREE.2.B EN

  • 859. 
    5. As soon as it adopts a 5. As soon as it adopts a delegated act, the Commission delegated act, the Commission shall notify it simultaneously to shall notify it simultaneously to the European Parliament and to the European Parliament and to the Council. the Council.
  • 860. 
    6. A delegated act adopted 6. A delegated act adopted pursuant to Article 31(3), pursuant to [ ] Article 46(4), [ ] Article 46(4), Article 55(1), and Article 59(11) shall enter Article 56(1) and (4), and into force only if no objection Article 59(11) shall enter into has been expressed either by the force only if no objection has European Parliament or by the been expressed either by the Council within a period of two European Parliament or by the months of notification of that act Council within a period of two to the European Parliament and months of notification of that the Council or if, before the

    act to the European Parliament expiry of that period, the and the Council or if, before the European Parliament and the expiry of that period, the Council have both informed the European Parliament and the Commission that they will not Council have both informed the object. That period shall be Commission that they will not extended by two months at the object. That period shall be initiative of the European extended by two months at the Parliament or of the Council. initiative of the European Parliament or of the Council.

ANNEX I TREE.2.B EN

  • 861. 
    Article 64

    Repeal

  • 862. 
    Regulation (EC) No 1. Regulation (EC) No

    714/2009 is repealed. 714/2009 is repealed. References to the repealed References to the repealed Regulation shall be construed Regulation shall be construed as as references to this Regulation references to this Regulation and and shall be read in accordance shall be read in accordance with with the correlation table in the correlation table in Annex II. Annex II.

  • 863. 
    1a. Any implementing act adopted on the basis of

    Regulation 714/2009 i shall continue to apply beyond the date of repeal of Regulation 714/2009 until it is repealed.

  • 864. 
    AM 185

    Article 64 a (new) Article 64 a Review By 1 June 2025, the Commission shall review and submit a report on the implementation of this Regulation, together with a legislative proposal if appropriate, to the European Parliament and to the Council.

ANNEX I TREE.2.B EN

  • 865. 
    Article 65

    Entry into force

  • 866. 
    This Regulation shall enter into This Regulation shall enter into force on the twentieth day force on the twentieth day

    following that of its publication following that of its publication in the Official Journal of the in the Official Journal of the European Union. European Union. It shall apply from 1 January It shall apply from 1 January 2020. 2020.

    Articles 13 and 58a of this Regulation shall apply with effect from the date of entry into force of this Regulation.

    For the purpose of implementing Article 13, Article 14 of this Regulation shall apply with effect from the date of entry into force of this Regulation.

    For the purpose of reviewing this Regulation no later than by the end of 2030, the Commission shall, where appropriate, submit a proposal.

ANNEX I TREE.2.B EN

  • 867. 
    This Regulation shall be This Regulation shall be binding binding in its entirety and in its entirety and directly

    directly applicable in all applicable in all Member States. Member States.

  • 868. 
    Done at Brussels, Done at Brussels,

    For the European Parliament For the European Parliament The President The President For the Council For the Council The President The President

ANNEX I TREE.2.B EN

  • 869. 
    ANNEX I

    AM 186 870. FUNCTIONS OF FUNCTIONS OF REGIONAL [ ] TASKS OF REGIONAL [ Provisionally agreed:

    REGIONAL COORDINATION CENTRES ]SECURITY TASKS OF REGIONAL OPERATIONAL CENTRES COORDINATORS COORDINATION CENTRES 871. 1. Coordinated capacity 1. Coordinated capacity 1. Coordinated capacity Provisionally agreed:

    calculation calculation calculation 1. Coordinated capacity calculation 872. 1.1. Regional operational 1.1. Regional coordination 1.1 Regional [ ] security Provisionally agreed:

    centres shall perform centres shall perform coordinated coordinators shall perform the 1.1 Regional Coordination Centres shall coordinated calculation of cross calculation of cross zonal coordinated calculation of cross perform the coordinated calculation of cross zonal capacities. capacities. zonal capacities. zonal capacities.

  • 873. 
    1.2. Coordinated capacity [ ] Coordinated capacity Provisionally agreed: calculation shall be performed calculation shall be performed [ [ ] Coordinated capacity calculation shall in due time for each market ] for [ ] the day-ahead and be performed [ ] for [ ] the day-ahead and timeframe and as frequently as intraday timeframes. intraday timeframes. needed during the intraday

    timeframe. 874. 1.2a Coordinated capacity Provisionally agreed:

    calculation shall be performed (Without the agreement on the reference to on the basis of the the Guideline, which will be decided methodologies developed horizontally) pursuant to Articles 21, 26, 29 1.2a Coordinated capacity calculation and 30 of [Commission shall be performed on the basis of the Regulation 2015/1222 methodologies developed pursuant to establishing a guideline on Articles 21, 26, 29 and 30 of [Commission capacity allocation and Regulation 2015/1222 the Guideline on congestion management]. capacity allocation and congestion management adopted on the basis of Article 18 of Regulation 714/2009 i establishing a guideline on capacity allocation and congestion management].

ANNEX I TREE.2.B EN

  • 875. 
    1.3. Coordinated capacity 1.3 Coordinated capacity Provisionally agreed: calculation shall be performed calculation shall be performed 1.3 Coordinated capacity calculation shall based on a common system based on a common [ ] grid be performed based on a common [ ] grid model in accordance with point model in accordance with point model in accordance with point 3 [ ]. 2 and on a coordinated capacity 3 [ ].

    calculation methodology developed by the transmission system operators of the relevant system operation region.

  • 876. 
    1.4. Coordinated capacity 1.4 Coordinated capacity Provisionally agreed: calculation shall ensure calculation shall ensure an 1.4 Coordinated capacity calculation shall efficient congestion efficient congestion ensure an efficient congestion management management in accordance with management in accordance with in accordance with the principles of the principles of congestion the principles of congestion congestion management defined in this management defined in this management defined in this Regulation.

    Regulation. Regulation. 877. 2. Coordinated security 2. Coordinated security Provisionally agreed:

    analysis analysis 2. Coordinated security analysis 878. 2.1. Regional operational 2.1. Regional coordination 2.1. Regional [ ] security Provisionally agreed:

    centres shall perform centres shall perform coordinated coordinators shall perform 2.1. Regional Coordination Centres shall coordinated security analysis security analysis aiming at ensuring coordinated security analysis perform coordinated security analysis aiming aiming at ensuring secure secure system operation. aiming at ensuring secure at ensuring secure system operation. system operation. system operation.

  • 879. 
    2.2. Security analysis shall be 2.2 Security analysis shall be Provisionally agreed: performed for all operational performed for all operational 2.2 Security analysis shall be performed planning timeframes using the planning timeframes, between for all operational planning timeframes, common system models. the year-ahead and intraday between the year-ahead and intraday timeframes, using the common timeframes, using the common [ ] grid [ ] grid models. models.

ANNEX I TREE.2.B EN

  • 880. 
    2.2a Coordinated security Provisionally agreed: analysis shall be performed on (Without the agreement on the reference to the basis of the methodologies the Guideline, which will be decided developed pursuant to Articles horizontally)

    75 and 76 of Commission 2.2a Coordinated security analysis shall Regulation 2017/1485 be performed on the basis of the establishing a guideline on methodologies developed pursuant to the electricity transmission system System Operation Guideline adopted on operation. the basis of Article 18 of Regulation 714/2009 Articles 75 and 76 of Commission Regulation 2017/1485 establishing a guideline on electricity transmission system operation.

  • 881. 
    2.3. Regional operational 2.3. Regional coordination 2.3 Regional [ ] security Provisionally agreed: centres shall share the results of centres shall share the results of the coordinators shall share the 2.3 Regional Coordination Centres shall the coordinated security coordinated security analysis with results of the coordinated share the results of the coordinated security analysis with at least the at least the transmission system security analysis with at least the analysis with at least the transmission system transmission system operators operators of the system operation transmission system operators of operators of the system operation region. of the system operation region. region. the system operation region.
  • 882. 
    2.4. When as a result of the 2.4. When as a result of the 2.4 When as a result of the Provisionally agreed: coordinated security analysis a coordinated security analysis a coordinated security analysis a 2.4 When as a result of the coordinated regional operational centre regional coordination centre regional [ ] security security analysis a Regional Coordination detects a possible constraint, it detects a possible constraint, it coordinator detects a possible Centre detects a possible constraint, it shall shall design remedial actions shall design remedial actions constraint, it shall design design remedial actions maximizing maximizing economic maximizing economic efficiency. remedial actions maximizing effectivenes and economic efficiency. efficiency. effectivenes and economic

    efficiency. 883. 2.4 a. Coordinated security Provisionally agreed to delete

    analysis shall be performed based on a common system model in accordance with point 2 and on a methodology to design coordinated remedial actions developed by the transmission system operators of the relevant system operation region.

ANNEX I TREE.2.B EN

  • 884. 
    3. Creation of common 3. Creation of common [ ] Provisionally agreed: system models grid models 3. Creation of common [ ] grid models
  • 885. 
    3.1. Regional operational 3.1. Regional coordination 3.1 Regional [ ] security Provisionally agreed: centres shall set up efficient centres shall set up efficient coordinators shall set up 3.1 Regional Coordination Centres shall processes for the creation of a processes for the creation of a efficient processes for the set up efficient processes for the creation of a common system model for each common system model for each creation of a common [ ] grid common [ ] grid model for each operational operational planning timeframe. operational planning timeframe. model for each operational planning timeframe between the yearplanning timeframe between the ahead and intraday timeframes. year-ahead and intraday

    timeframes. 886. 3.2. Transmission system 3.2. Transmission system 3.2 Transmission system Provisionally agreed:

    operators shall appoint one operators shall appoint one regional operators shall appoint one 3.2 Transmission system operators shall regional operational centre to coordination centre to build the regional [ ] security appoint one regional [ ] security build the common system common system model for all coordinator to build the Unioncoordinator to build the Union-wide model for all regions. regions. wide common [ ] grid models [ common [ ] grid models [ ]. ].

  • 887. 
    3.2a Common grid models Provisionally agreed: shall be performed in (Without the agreement on the reference to accordance with the the Guideline, which will be decided methodologies developed horizontally)

    pursuant to Articles 67, 70 and 3.2a Common grid models shall be 79 of Commission Regulation performed in accordance with the 2017/1485 establishing a methodologies developed pursuant to the guideline on electricity System Operation Guideline and Articles transmission system operation 67, 70 and 79 of Commission Regulation and pursuant to Article 28 of 2017/1485 establishing a guideline on Commission Regulation electricity transmission system operation 2015/1222 establishing a and pursuant to Article 28 of Commission guideline on capacity Regulation 2015/1222 establishing a allocation and congestion guideline on capacity allocation and management. congestion management the capacity allocation and congestion management guideline adopted on the basis of Article 18 of Regulation 714/2009 i.]

ANNEX I TREE.2.B EN

  • 888. 
    3.3. Common system models 3.3 Common [ ] grid models Provisionally agreed: shall include relevant data for shall include relevant data for 3.3 Common [ ] grid models shall efficient operational planning efficient operational planning include relevant data for efficient operational and capacity calculation in all and capacity calculation in all planning and capacity calculation in all operational planning operational planning operational planning timeframes between timeframes. timeframes between the yearthe year-ahead and intraday timeframes. ahead and intraday

    timeframes. 889. 3.4. Common system models 3.4. Common system models 3.4 Common [ ] grid models Provisionally agreed:

    shall be made available to all shall be made available to all shall be made available to all 3.4 Common [ ] grid models shall be regional operational centres, regional coordination centres, regional [ ] security made available to all Regional Coordination transmission system operators, transmission system operators, coordinators, transmission Centres, transmission system operators, ENTSO for Electricity and the ENTSO for Electricity and the system operators, ENTSO for ENTSO for Electricity and the Agency, upon Agency, upon its request. Agency, upon its request. Electricity and the Agency, upon its request. its request.

  • 890. 
    4. Consistency assessment 4. Support to the Provisionally agreed: of transmission system consistency assessment of 4. Support to the consistency operators' defense plans and transmission system operators' assessment of transmission system restoration plans defense plans and restoration operators' defense plans and restoration plans plans

ANNEX I TREE.2.B EN

  • 891. 
    4.1a Regional security Provisionally agreed: coordinators shall support the (Without the agreement on the reference to transmission system operators the Guideline, which will be decided of the system operation region horizontally)

    in carrying out the consistency 4.1a Regional Coordination Centres shall assessment of transmission support the transmission system operators system operators' defense of the system operation region in carrying plans and restoration plans out the consistency assessment of pursuant to the procedures set transmission system operators' defense out in Article 6 of plans and restoration plans pursuant to [Commission Regulation the procedures set out in Article 6 of xxxx/xxxx establishing a [Commission Regulation xxxx/xxxx network code on electricity establishing a the network code on emergency and restoration]. electricity emergency and restoration adopted in accordance with Article 6 of Regulation 714/2009 i].

  • 892. 
    4.1. All transmission system 4.1 All transmission system No change: operators shall agree on a operators shall agree on a 4.1 All transmission system operators threshold above which the threshold above which the shall agree on a threshold above which the impact of actions of one or impact of actions of one or more impact of actions of one or more more transmission system transmission system operators in transmission system operators in the operators in the emergency, the emergency, blackout or emergency, blackout or restoration states is blackout or restoration states is restoration states is considered considered significant for other transmission considered significant for other significant for other transmission system operators synchronously or nontransmission system operators system operators synchronously synchronously interconnected. synchronously or nonor non- synchronously

    synchronously interconnected. interconnected.

ANNEX I TREE.2.B EN

  • 893. 
    4.2. Using the threshold 4.2. Using the threshold defined [ ] Provisionally agreed to delete. Same as line defined pursuant to point 4.1, pursuant to point 4.1, each regional 891.

    each regional operational centre coordination centre shall provide shall provide support to the support to the transmission system transmission system operators operators of the system operation of the system operation region region regarding the assessment of regarding the assessment of the the consistency of its transmission consistency of its transmission system operators’ system defence system operators’ system plans and the restoration plans. defence plans and the restoration plans.

  • 894. 
    4.3. In providing support to 4.3. In providing support to the 4.3 In providing support to Provisionally agreed: the transmission system transmission system operators, the the transmission system 4.3 In providing support to the operators, the regional regional coordination centre shall: operators, the regional [ ] transmission system operators, the Regional operational centre shall: security coordinator shall: Coordination Centre shall:
  • 895. 
    (a) identify potential (a)identify No change incompatibilities; potential (a)identify potential incompatibilities; incompatibilities;
  • 896. 
    (b) propose mitigation (b) propose mitigation No change actions. actions. (b) propose mitigation actions.
  • 897. 
    4.4. Transmission system 4.4 Transmission system Provisionally agreed: operators shall take into operators shall assess and take 4.4 Transmission system operators shall account the proposed mitigation into account the proposed assess and take into account the proposed actions. mitigation actions. mitigation actions.
  • 898. 
    5. Coordination and 5. (8 in GA) Support the Provisionally agreed: optimization of regional coordination and optimization 5. (8 in GA) Support the coordination restoration of regional restoration and optimization of regional restoration
  • 899. 
    5.1. Regional operational deleted [ ] Provisionally agreed to delete

    centres shall be equipped with the close to real time supervisory control and data acquisition systems with the observability defined by applying the threshold defined in accordance with point 4.1.

ANNEX I TREE.2.B EN

  • 900. 
    5.2. Each relevant regional 5.2. Each relevant regional 5.2 (8.2 IN GA) Each relevant Provisionally agreed: operational centre shall provide coordination centre shall provide regional [ ] security (Without the agreement on the reference to assistance to the appointed assistance to the appointed coordinator shall [ ] support the network code, which will be decided frequency leaders and the frequency leaders and the the transmission system horizontally)

    resynchronisation leaders resynchronisation leaders aiming at operators appointed as [ ] .2 (8.2 IN GA) Each relevant [regional aiming at improving the improving the efficiency and frequency leaders and the security coordinator] shall [ ] support the efficiency and effectiveness of effectiveness of system restoration. resynchronisation leaders transmission system operators appointed system restoration. Transmission system operators pursuant to Articles 29 and 33 as [ ] frequency leaders and the Transmission system operators shall be entitled to request of Commission Regulation resynchronisation leaders pursuant to shall be entitled to request assistance from regional xxxx/xxxx establishing a Articles 29 and 33 of Commission assistance from regional coordination centres if their system network code on emergency Regulation xxxx/xxxx establishing a the operational centres if their is in a blackout or restoration state. and restoration [aiming at network code on emergency and system is in a blackout or improving] to improve the restoration [aiming at improving] adopted restoration state. efficiency and effectiveness of in accordance with Article 7 of Regulation system restoration. The 714/2009 ]to improve the efficiency and transmission system operators effectiveness of system restoration. The of the system operation region transmission system operators of the shall define the role of the system operation region shall define the regional security coordinator role of the Regional Coordination Centre relating to the support to the relating to the support to the coordination coordination and optimisation and optimisation of regional restoration.

    of regional restoration.

ANNEX I TREE.2.B EN

  • 901. 
    8.3 in GA (ex last sentence of Provisionally agreed:

    5.2) Transmission system 8.3 in GA (ex last sentence of 5.2) operators [ ] may [ ] request Transmission system operators [ ] may [ ] assistance from regional [ ] request assistance from Regional security coordinators if their Coordination Centres if their system is in a system is in a blackout or blackout or restoration state. restoration state.

  • 902. 
    8.4 in GA Regional security Provisionally agreed: coordinators shall be equipped 8.4 in GA Regional security coordinators with the close to real time shall be equipped with the close to real supervisory control and data time supervisory control and data acquisition systems with the acquisition systems with the observability observability defined by defined by applying the threshold defined applying the threshold defined in accordance with point 4.1. in accordance with point 4.1.
  • 903. 
    6. Post-operation and 6. (9 in GA) Post-operation Provisionally agreed: post-disturbances analysis and post-disturbances analysis 6. (9 in GA) Post-operation and postand reporting and reporting disturbances analysis and reporting
  • 904. 
    6.1. Regional operational 6.1. Regional coordination 6.1 (9.1 in GA) Regional [ ] Provisionally agreed: centres shall investigate and centres shall investigate and security coordinators shall [ ] 6.1 (9.1 in GA) Regional Coordination prepare a report on any incident prepare a report on any incident prepare a report on any incident Centres shall investigate and prepare a above the threshold defined in above the threshold defined in above the threshold defined in report on any incident above the threshold accordance with point 4.1. The accordance with point 4.1. The accordance with point 4.1. The defined in accordance with point 4.1. The regulatory authorities of the regulatory authorities of the system regulatory authorities of the regulatory authorities of the system operation system operation region and the operation region and the Agency system operation region and the region and the Agency may be involved in Agency may be involved in the may be involved in the Agency may be involved in the the investigation upon their request. The investigation upon their request. investigation upon their request. investigation upon their request. report shall contain recommendations aiming The report shall contain The report shall contain The report shall contain at preventing similar incidents in future. recommendations aiming at recommendations aiming at recommendations aiming at

    preventing similar incidents in preventing similar incidents in preventing similar incidents in future. future. future.

ANNEX I TREE.2.B EN

  • 905. 
    6.2. The report shall be made 6.2 (9.5 in GA) The report Provisionally agreed: available to all transmission shall be [ ] published. The 6.2 (9.5 in GA) The report shall be [ ] system operators, regulatory Agency may issue published. The Agency may issue authorities, the Commission recommendations aiming at recommendations aiming at preventing and the Agency. The Agency preventing similar incidents in similar incidents in future. may issue recommendations future.

    aiming at preventing similar incidents in future.

  • 906. 
    7. Regional sizing of [ ] Provisionally agreed: reserve capacity 7. Regional sizing of reserve capacity
  • 907. 
    7.1. Regional operational 7.1. Regional coordination Provisionally agreed: centres shall determine the centres shall determine the reserve 7.1. Regional Coordination Centres shall reserve capacity requirements capacity requirements for the determine calculate the reserve capacity for the system operation region. system operation region. The requirements for the system operation The determination of reserve determination of reserve capacity region. The determination of reserve capacity requirements shall: requirements shall: capacity requirements shall:
  • 908. 
    (a) pursue the general Provisionally agreed: objective to maintain (a) pursue the general objective to operational security in the most maintain operational security in the most cost effective manner; cost effective manner;
  • 909. 
    (b) be performed at the day Provisionally agreed: ahead and/or intraday (b) be performed at the day-ahead and/or timeframe; intraday timeframe;
  • 910. 
    (c) determine the overall Provisionally agreed: amount of required reserve (c) determine calculate the overall capacity for the system amount of required reserve capacity for the operation region; system operation region;

ANNEX I TREE.2.B EN

  • 911. 
    (d) define minimum reserve Provisionally agreed: capacity requirements for each (d) define minimum reserve capacity type of reserve capacity; requirements for each type of reserve capacity;
  • 912. 
    (e) take into account possible Provisionally agreed: substitutions between different (e) take into account possible types of reserve capacity with substitutions between different types of the aim to minimise the costs of reserve capacity with the aim to minimise the procurement; costs of procurement;
  • 913. 
    (f) set out the necessary Provisionally agreed: requirements for the (f) set out the necessary requirements for geographical distribution of the geographical distribution of required required reserve capacity, if reserve capacity, if any. any.
  • 914. 
    8. Facilitation of the [ ] Provisionally agreed: regional procurement of 8. Facilitation of the regional balancing capacity procurement of balancing capacity
  • 915. 
    8.1. Regional operational 8.1. Regional coordination Provisionally agreed: centres shall support the centres shall support the 8.1.Regional Coordination Centres shall transmission system operators transmission system operators of support the transmission system operators of of the system operation region the system operation region in the system operation region in determining in determining the amount of determining the amount of the amount of balancing capacity that needs balancing capacity that needs to balancing capacity that needs to be to be procured. The determination of the be procured. The determination procured. The determination of the amount of balancing capacity shall of the amount of balancing amount of balancing capacity shall:

    capacity shall: 916. (a) be performed at the day Provisionally agreed:

    ahead and/or intraday (a) be performed at the day-ahead and/or timeframe; intraday timeframe;

  • 917. 
    (b) take into account possible Provisionally agreed: substitutions between different (b) take into account possible types of reserve capacity with substitutions between different types of the aim to minimise the costs of reserve capacity with the aim to minimise the procurement; costs of procurement;

ANNEX I TREE.2.B EN

  • 918. 
    (c) take into account the Provisionally agreed: volumes of required reserve (c) take into account the volumes of capacity that are expected to be required reserve capacity that are expected to provided by balancing energy be provided by balancing energy bids, which bids, which are not submitted are not submitted based on a contract for based on a contract for balancing capacity.

    balancing capacity. 919. (ca) take into account possible Provisionally agreed:

    substitutions between different [ ] types of reserve capacity with the (line 917 = 919) aim to minimise the costs of procurement.

  • 920. 
    8.2. Regional operational deleted Provisionally agreed: centres shall support the 8.2. Regional operational centres shall transmission system operators support the transmission system operators of of the system operation region the system operation region in procuring the in procuring the required required amount of balancing capacity amount of balancing capacity determined in accordance with point 8.1. The determined in accordance with procurement of balancing capacity shall: point 8.1. The procurement of

    balancing capacity shall: 921. (a) be performed at the daydeleted Provisionally agreed:

    ahead and/or intraday (a) be performed at the day-ahead and/or timeframe; intraday timeframe;

  • 922. 
    (b) take into account possible deleted Provisionally agreed: substitutions between different (b) take into account possible types of reserve capacity with substitutions between different types of the aim to minimise the costs of reserve capacity with the aim to minimise the procurement. costs of procurement.

ANNEX I TREE.2.B EN

  • 923. 
    9. Regional system 9. (5 in GA) Week-ahead to Provisionally agreed:

    adequacy forecasts and day-ahead regional system 9. (5 in GA) Week-ahead to [daypreparation of risk reducing adequacy [ ] assessments and ahead/intraday] regional system adequacy actions preparation of risk reducing [ ] assessments and preparation of risk actions reducing actions

  • 924. 
    9.1. Regional operational 9.1. Regional coordination 9.1 (5.1 in GA)Regional [ ] Provisionally agreed: centres shall perform week centres shall perform week ahead security coordinators shall Possibly to add 'intraday'. To be checked for ahead to intraday regional to intraday regional adequacy perform week ahead to [ ] daywith risk preparedness regulation in order to adequacy assessments. assessments. ahead regional adequacy ensure consistency.

    assessments in accordance with the procedures set out in 9.1 (5.1 in GA)Regional [ ] Coordination Article 81 of Commission Centres shall perform week ahead to [ ] Regulation 2017/1485 [day-ahead/intraday] regional adequacy establishing a guideline on assessments in accordance with the electricity system operation procedures set out in Article 81 of and on the basis of the Commission Regulation 2017/1485 methodology developed establishing a guideline on electricity pursuant Article 8 of [Risk system operation and on the basis of the preparedness Regulation]. methodology developed pursuant Article 8 of [Risk preparedness Regulation].

  • 925. 
    9.2. Regional operational 9.2. Regional coordination 9.2 (5.2 in GA) Regional [ ] Provisionally agreed: centres shall base the adequacy centres shall base the adequacy security coordinators shall base 9.2 (5.2 in GA) Regional Coordination assessments on the information assessments on the information the short-term regional Centres shall base the short-term regional provided by the transmission provided by the transmission adequacy assessments on the adequacy assessments on the information system operators of system system operators of system information provided by the provided by the transmission system operation region with the aim of operation region with the aim of transmission system operators of operators of system operation region with the detecting situations where a detecting situations where a lack of system operation region with the aim of detecting situations where a lack of lack of adequacy is expected in adequacy is expected in any of the aim of detecting situations adequacy is expected in any of the control any of the control areas or at control areas or at regional level. where a lack of adequacy is areas or at regional level. Regional regional level. Regional Regional coordination centres expected in any of the control Coordination Centres shall take into operational centres shall take shall take into account possible areas or at regional level. account possible cross-zonal exchanges and into account possible crosscross-zonal exchanges and Regional [ ] security operational security limits in all relevant zonal exchanges and operational security limits in all coordinators shall take into operational planning timeframes. operational security limits in all operational planning timeframes. account possible cross-zonal

    operational planning exchanges and operational timeframes. security limits in all relevant operational planning timeframes.

ANNEX I TREE.2.B EN

  • 926. 
    9.3. When performing a 9.3. When performing a regional 9.3 (5.3 in GA)When Provisionally agreed: regional generation adequacy generation adequacy assessment, performing a regional [ ] 9.3 (5.3 in GA)When performing a assessment, each regional each regional coordination centre system adequacy assessment, regional [ ] system adequacy assessment, operational centre shall shall coordinate with other regional each regional [ ] security each Regional Coordination Centre shall coordinate with other regional coordination centres to: coordinator shall coordinate coordinate with other Regional [ ] operational centres to: with other regional [ ] security Coordination Centres to: coordinators to:
  • 927. 
    (a) verify the underlying (a) verify the underlying No change: assumptions and forecasts; assumptions and forecasts; (a) verify the underlying assumptions and forecasts;
  • 928. 
    (b) detect possible cross(b) detect possible cross No change: regional lack of adequacy regional lack of adequacy (b) detect possible cross-regional lack of situations. situations. adequacy situations.
  • 929. 
    9.4. Each regional operational 9.4. Each regional coordination 9.4 (5.4 in GA) Each regional Provisionally agreed: centre shall deliver the results centre shall deliver the results of [ ] security coordinator shall 9.4 (5.4 in GA) Each Regional of the regional generation the regional generation adequacy deliver the results of the regional Coordination Centre shall deliver the adequacy assessments together assessments together with the generation adequacy results of the regional generation adequacy with the actions it proposes to actions it proposes to reduce risks assessments together with the assessments together with the actions it reduce risks of lack of adequacy of lack of adequacy to the actions it proposes to reduce proposes to reduce risks of lack of adequacy to the transmission system transmission system operators of risks of lack of adequacy to the to the transmission system operators of the operators of the system the system operation region and to transmission system operators of system operation region and to other operation region and to other other regional coordination the system operation region and Regional Coordination Centres. regional operational centres. centres. to other regional [ ] security

    coordinators. 930. 10. Regional outage 10. (6 in GA) Regional Provisionally agreed:

    coordination outage planning coordination 10. (6 in GA) Regional outage planning coordination

  • 931. 
    10.1. Each regional operational 10.1. Each regional coordination 10.1 (6.1 in GA) Each regional Provisionally agreed: centre shall perform outage centre shall perform outage [ ] security coordinator shall 10.1 (6.1 in GA) Each Regional coordination in order to monitor coordination in order to monitor perform regional outage Coordination Centre shall perform the availability status of the the availability status of the coordination in accordance regional outage coordination in accordance relevant assets and coordinate relevant assets and coordinate their with the procedures set out in with the procedures set out in Article 80 of their availability plans to ensure availability plans to ensure the Article 80 of Commission Commission Regulation 2017/1485 the operational security of the operational security of the Regulation 2017/1485 establishing a guideline on electricity transmission system, while transmission system, while establishing a guideline on transmission system operation [the System

ANNEX I TREE.2.B EN

maximizing the capacity of the maximizing the capacity of the electricity transmission system Operation Guideline adopted on the basis interconnectors and/or the interconnectors and/or the operation in order to monitor of Article 18 of Regulation 714/2009 i] in transmission systems affecting transmission systems affecting the availability status of the order to monitor the availability status of the cross-zonal flows. cross-zonal flows. relevant assets and coordinate relevant assets and coordinate their their availability plans to ensure availability plans to ensure the operational the operational security of the security of the transmission system, while transmission system, while maximizing the capacity of the maximizing the capacity of the interconnectors and/or the transmission interconnectors and/or the systems affecting cross-zonal flows. transmission systems affecting cross-zonal flows.

  • 932. 
    10.2. Each regional operational 10.2. Each regional coordination 10.2 (6.2 in GA) Each regional Provisionally agreed: centre shall maintain a single centre shall maintain a single list of [ ] security coordinator shall 10.2 (6.2 in GA) Each Regional list of relevant grid elements, relevant grid elements, power maintain a single list of relevant Coordination Centre shall maintain a single power generating modules and generating modules and demand grid elements, power generating list of relevant grid elements, power demand facilities of the system facilities of the system operation modules and demand facilities generating modules and demand facilities of operation region and make it region and make it available on the of the system operation region the system operation region and make it available on the ENTSO for ENTSO for Electricity operational and make it available on the available on the ENTSO for Electricity Electricity operational planning planning data environment. ENTSO for Electricity operational planning data environment. data environment. operational planning data

    environment.

  • 933. 
    10.3. Each regional operational 10.3. Each regional coordination 10.3 (6.3 in GA) Each regional Provisionally agreed: centre shall carry out the centre shall carry out the following [ ] security coordinator shall 10.3 (6.3 in GA) Each Regional following activities related to activities related to outage carry out the following activities Coordination Centre shall carry out the outage coordination in the coordination in the system related to outage coordination in following activities related to outage system operation region: operation region: the system operation region: coordination in the system operation region:
  • 934. 
    (a) assess outage planning (a) assess outage planning No change:

    compatibility using all compatibility using all (a) assess outage planning compatibility transmission system operators’ transmission system operators’ using all transmission system operators’ year-ahead availability plans; year-ahead availability plans; year-ahead availability plans;

  • 935. 
    (b) provide the transmission (b) provide the transmission No change:

    system operators of the system system operators of the system (b) provide the transmission system operation region with a list of operation region with a list of operators of the system operation region with detected planning detected planning a list of detected planning incompatibilities incompatibilities and the incompatibilities and the and the solutions it proposes to solve the solutions it proposes to solve solutions it proposes to solve the incompatibilities. the incompatibilities. incompatibilities.

ANNEX I TREE.2.B EN

  • 936. 
    11. Optimization of inter 11. (12 in GA) Optimization Provisionally agreed: transmission system of inter-transmission system Optimisation of inter-transmission system operators compensation operators compensation operators'

    mechanisms mechanisms 937. 11.1. Regional operational 11.1. Regional coordination 11.1 (12.1 in GA) The Provisionally agreed:

    centres shall support the centres shall support the transmission system operators 11.1 (12.1 in GA) The transmission transmission system operators transmission system operators of of the system operation region system operators of the system operation of the system operation region the system operation region in may jointly decide to receive region may jointly decide to receive in administering the financial administering the financial flows support from the regional support from the Regional Coordination flows related to interrelated to inter- transmission security coordinator [ ] in Centre in administering the financial flows transmission system operators system operators settlements administering the financial flows related to inter-transmission system settlements involving more than involving more than two related to inter-transmission operators settlements involving more than two transmission system transmission system operators, system operators settlements two transmission system operators, such as operators, such as redispatching such as redispatching costs, involving more than two redispatching costs, congestion income, costs, congestion income, congestion income, unintentional transmission system operators, unintentional deviations or reserve unintentional deviations or deviations or reserve procurement such as redispatching costs, procurement costs. reserve procurement costs. costs. congestion income, unintentional deviations or reserve procurement costs.

  • 938. 
    12. Training and 12. (7 in GA) Training and Provisionally agreed: certification certification of staff working 12. (7 in GA) Training and certification for regional security of staff working for Regional coordinators Coordination Centres
  • 939. 
    12.1. Regional operational 12.1. Regional coordination 12.1. (7.1 in GA) Regional [ ] Provisionally agreed: centres shall prepare and centres shall prepare and execute security coordinators shall 12.1. (7.1 in GA) Regional Coordination execute training and training and certification programs prepare and execute training and Centres shall prepare and execute training certification programs focusing focusing on regional system certification programs focusing and certification programs focusing on on regional system operation operation for the personnel on regional system operation for regional system operation for the personnel for the personnel working in the working in the planning and the personnel working for working for Regional Coordination planning and control rooms of control rooms of the transmission regional security coordinators Centres.

    the transmission system system operators of system [ ] operators of system operation operation region. region.

ANNEX I TREE.2.B EN

  • 940. 
    12.2. The training programs 12.2 (7.2 in GA) The training Provisionally agreed: shall cover all the relevant programs shall cover all the 12.2 (7.2 in GA) The training programs components of system relevant components of system shall cover all the relevant components of operation, including scenarios operation, where the regional system operation, where the Regional of regional crisis. security coordinator performs Coordination Centre performs tasks tasks including scenarios of including scenarios of regional crisis. regional crisis.
  • 941. 
    13. Identification of 13. Identification of regional No change:

regional crisis situations and crisis situations and 13. Identification of regional crisis

preparation of risk mitigation preparation of risk mitigation situations and preparation of risk

scenarios reviewing the risk scenarios reviewing the risk mitigation scenarios reviewing the risk

preparedness plans as preparedness plans as preparedness plans as established in

established in Member States established in Member States Member States

  • 942. 
    13.1. If ENTSO for Electricity 13.1. If ENTSO for Electricity 13.1 If the ENTSO for Provisionally agreed:

delegates this function, regional delegates this function, regional Electricity delegates this Lines 942 - 944 need to be checked for

operational centres shall coordination centres shall identify function, regional [ ] security consistency with Risk Preparedness

identify regional crisis regional crisis scenarios in coordinators shall identify Regulation.

scenarios in accordance with accordance with the criteria set out regional crisis scenarios in

the criteria set out in Article in Article 6(1) of [Risk accordance with the criteria set 13.1 If the ENTSO for Electricity delegates

6(1) of [Risk Preparedness Preparedness Regulation as out in Article 6(1) of [Risk this function, Regional Coordination

Regulation as proposed by proposed by COM(2016) 862 i] Preparedness Regulation as Centres shall identify regional crisis

COM(2016) 862 i] proposed by COM(2016) 862 i]. scenarios in accordance with the criteria set

out in Article 6(1) of [Risk Preparedness

Regulation as proposed by COM(2016) 862 i].

  • 943. 
    The identification of regional Provisionally agreed:

crisis scenarios shall be The identification of regional crisis

performed in accordance with scenarios shall be performed in

the methodology set out in accordance with the methodology set out

Article 5 of the [Risk in Article 5 of the [Risk Preparedness

Preparedness Regulation]. Regulation].

  • 944. 
    13.2. Regional operational 13.2. Regional coordination 13.2 Regional [ ] security Provisionally agreed:

centres shall prepare and carry centres shall prepare and carry out coordinators shall support the 13.2 Regional Coordination Centres shall

out yearly crisis simulation in yearly crisis simulation in competent authorities of each support the competent authorities of each

cooperation with competent cooperation with competent system operation region in the system operation region in the preparation

authorities according to Article authorities according to Article preparation and carrying out of [ and carrying out of [ ] annual crisis

ANNEX I TREE.2.B EN

12(3) of [Risk Preparedness 12(3) of [Risk Preparedness ] annual crisis simulation [ ] in simulation [ ] in accordance with Article Regulation as proposed by Regulation as proposed by accordance with Article 12(3) 12(3) of [Risk Preparedness Regulation as COM(2016) 862 i]. COM(2016) 862 i]. of [Risk Preparedness proposed by COM(2016) 862 i]. Regulation as proposed by COM(2016) 862 i].

  • 945. 
    13a. Identification of needs for Provisionally agreed: new capacity, for upgrade of 13a. Identification of needs for new existing capacity or their transmission capacity, for upgrade of alternatives. existing transmission capacity or their alternatives.
  • 946. 
    13a.1. Regional coordination Provisionally agreed: centres shall support transmission 13a.1. Regional Coordination Centres shall system operators in the support transmission system operators in identification of needs for new the identification of needs for new capacity, for an upgrading of transmission capacity, for an upgrading of existing capacity or for their existing transmission capacity or for their alternatives, to be submitted to the alternatives, to be submitted to the regional regional groups established groups established pursuant to Regulation pursuant to Regulation (EU) No (EU) No 347/2013 and to be included in the 347/2013 and to be included in the ten-year network development plan referred ten-year network development to in Article 51 of [recast of Directive plan referred to in Article 51 of 2009/72/EC as proposed by COM(2016) [recast of Directive 2009/72/EC i as 864/2].

    proposed by COM(2016) 864 i/2] 947. The preparation of risk Provisionally agreed:

    mitigation scenarios shall be Line 947 need to be checked for consistency performed in accordance with with Risk Preparedness Regulation. the process set out in Article The preparation of risk mitigation 12 of the [Risk Preparedness scenarios shall be performed in Regulation]. accordance with the process set out in [ ] Article 12 of the [Risk Preparedness

    Regulation]. [ ]

ANNEX I TREE.2.B EN

  • 948. 
    14. (10 in GA) Calculation To be discussed – check for consistency with of the maximum entry section on capacity mechanisms

    capacity available for the participation of foreign capacity in capacity mechanisms.

  • 949. 
    14.1 (10.1 in GA) Regional To be discussed – check for consistency with security coordinators shall section on capacity mechanisms

    support TSO in calculating the maximum entry capacity available for the participation of foreign capacity in capacity mechanisms taking into account the expected availability of interconnection and the likely concurrence of system stress between the system where the mechanism is applied and the system in which the foreign capacity is located.

  • 950. 
    14.2 (10.2 in GA) The To be discussed – check for consistency with calculation shall be performed section on capacity mechanisms

    in accordance with the methodology set out in Article 21(10)(a) of this Regulation.

  • 951. 
    14.3 (10.3 in GA) Regional To be discussed – check for consistency with security coordinators shall section on capacity mechanisms

    provide a calculation for each bidding zone border covered by the system operation region.

ANNEX I TREE.2.B EN

  • 952. 
    15. (11 in GA) Preparation Provisionally agreed: of seasonal outlooks 15. (11 in GA) Preparation of seasonal outlooks
  • 953. 
    15.1 (11.1 in GA) If the Provisionally agreed:

    ENTSO for Electricity 15.1 (11.1 in GA) If the ENTSO for delegates this function Electricity delegates this function pursuant to Article 9 of [Risk pursuant to Article 9 of [Risk preparedness Regulation], preparedness Regulation], Regional regional security coordinators Coordination Centres shall carry out shall carry out regional regional seasonal adequacy outlooks. seasonal adequacy outlooks.

  • 954. 
    15.2 (11.2 in GA) The Provisionally agreed: preparation of seasonal 15.2 (11.2 in GA) The preparation of outlooks shall be carried out seasonal outlooks shall be carried out on on the basis of the the basis of the methodology developed methodology developed pursuant to Article 8 of [Risk pursuant to Article 8 of [Risk preparedness Regulation]. preparedness Regulation].

ANNEX I TREE.2.B EN

ANNEX II

Article 13 - Bidding zone review (Consolidated compromise proposal)

  • 1. 
    Member States shall take all appropriate measures to address congestions. Bidding zone borders

    shall be based on long-term, structural congestions in the transmission network [ ]. Bidding zones

    shall not contain such structural congestions unless they have no impact, or their impact on neighbouring bidding zones is mitigated through the use of remedial actions and they do not

    lead to reductions of cross zonal trading capacity in accordance with the requirements of Art 14.

    The configuration of the bidding zones in the Union shall be designed in such a way as to maximise

    economic efficiency and in order to maximise cross-border trading opportunities, while maintaining

    security of supply with due respect to the provisions in Article 14.

  • 2. 
    Every three years, the ENTSO for Electricity shall report on structural congestion and other major

    physical congestion between and within bidding zones, including location and frequency of such congestion in accordance with the capacity allocation and congestion management guideline adopted

    on the basis of Article 18 of Regulation (EU) 714/2009 i and an assessment of whether the cross-zonal

    trade capacity reached the minimum threshold pursuant to Article 14.

  • 3. 
    In order to ensure an optimal bidding zone [ ] configuration [ ] a bidding zone review shall be

    carried out. That review shall identify all structural congestion and include analysis of [ ] different configurations of bidding zones in a coordinated manner with the involvement of affected stakeholders

    from all [ ] relevant Member States, following the process in accordance with [ ] the capacity

    allocation and congestion management guideline adopted on the basis of Article 18 of Regulation

    (EU) 714/2009. Current bidding zones shall be assessed based on their ability to create a reliable market environment, ensure sufficient including for flexible generation and load capacity, which

    is crucial for avoiding grid bottlenecks, balancing electricity demand and supply, securing the

    long-term security of investments and the grid in network infrastructure.

    In this article and in article 13a, relevant Member States, transmission system operators or

    national regulatory authorities refer to those Member States, transmission system operators or

    national regulatory authorities participating in the review of the bidding zone configuration and also those in the same capacity calculation region pursuant to the capacity allocation and

    congestion management guideline adopted on the basis of Article 18 of Regulation (EU)

    714/2009.

  • 4. 
    All relevant transmission system operators shall submit a proposal on for the methodology and

    assumptions that will be used in the review process as well as the alternative bidding zone

    configurations considered to the relevant national regulatory authorities for approval. The relevant national regulatory authorities shall come to a unanimous decision on the proposal

    within [3 months]. In case they do not agree within this time frame, the Agency shall [ ] decide

    on the methodology and assumptions [ ] as well as the alternative bidding zone configurations

    considered. The methodology shall be based on structural congestions which are not expected to

    be overcome within the next five years, [for example] taking due account of tangible progress on

    infrastructure development projects, that are expected to be realised within the next five years.

  • 5. 
    Based on the methodology and assumptions approved pursuant to paragraph 3, [T]the transmission system operators participating in the bidding zone review shall submit a joint proposal to the [ ]

    relevant Member States or designated competent authorities of the relevant Member States

    whether to amend or maintain the bidding zone configuration no later than 12 months after

    [entry into force of this Regulation, specific date to be inserted by OJ]. Other Member States, Energy Community Contracting Parties or other third countries sharing the same synchronous

    area with any Member State may submit comments.

  • 6. 
    Where structural congestion has been identified in the report pursuant to paragraph 2 or by one

    or more transmission system operators in their control areas in a report approved by the

    relevant national regulatory authorities or where the bidding zone review recommends a

    bidding zone change of one or more Member States, the concerned Member States in cooperation with their transmission system operators shall decide, within 6 months, to either

    define national or multinational action plans pursuant to Art 13a, or to review their bidding

    zone configuration. The decision shall be immediately notified to the Commission and the

    Agency.

  • 7. 
    For those Member States that have opted for a proposal to amend the bidding zone configuration, the relevant Member States shall come to a unanimous decision within 6 months

    after the notification pursuant to paragraph 4. Other Member States may submit comments to

    the relevant Member States who should take account of these comments when coming to their

    decision. The decision shall be justified and notified to the Commission and the Agency. Should

    the relevant Member States fail to come to a unanimous decision within the allowed timeframe,

    they shall immediately notify the Commission. [The Commission may make further proposals and may invite the relevant Member States for consultation aiming at fostering a balanced

    solution within three months.] As a measure of last resort, the Commission after consultation

    with the Agency and the relevant stakeholders shall adopt a decision whether to amend or

    maintain the bidding zone configuration in and between those Member States [ ] by six months

    after receiving such a notification.

  • 8. 
    Member States and the Commission shall consult relevant stakeholders before adopting a decision

    under this Article.

  • 9. 
    [ ] Any decision adopted according to this Article shall specify the date of implementation of a

    change. That implementation date shall balance the need for expediency with practical considerations,

    including forward trade of electricity and shall not be less than 12 months after the decision is published unless otherwise agreed with the relevant Member States. The [ ] decision may define

    appropriate transitional arrangements [ ].

  • 10. 
    Where further bidding zone reviews are launched under [ ] the capacity allocation and congestion

    management guideline adopted on the basis of Article 18 of Regulation (EU) 714/2009 i this

    Article shall apply.

    Article 13a - Action plans (Consolidated compromise proposal)

  • 1. 
    Following a decision pursuant to Article 13(6), Member States shall develop action plans in cooperation with national regulatory authorities. These action plans shall contain a concrete

    timetable for adopting measures to reduce the structural congestions identified within the period

    of [no later than [4] years after entry into force of this Regulation, specific date to be inserted by

    OJ] [ ]

  • 2. 
    Irrespective of the concrete progress of the action plan, Member States [ ] shall ensure that

    without prejudice to derogation under Article [ ] 14 (7b), the cross-border trade capacities are

    increased every year up to the benchmark level [ ] calculated in accordance with Article 14 (7),

    which is to be achieved by the end of 2025. The yearly increase shall be achieved by means of a

    linear trajectory. The starting of this trajectory shall be either the capacity allocated at this border in the year before adoption of the roadmap or the average of the three last years before

    the adoption of the roadmap, whatever is higher. This linear trajectory [ ] shall be agreed with

    the Member States of the same capacity calculation region. For the period when a Member State

    is implementing an action plan, the Member State shall ensure that the capacity made available

    for cross-zonal trade to be compliant with Article 14 (7) is at least equal to the values of the

    trajectory, including by use of remedial actions in the capacity calculation region but the decisions of the regulatory authorities referred to in paragraphs 7a and 7b of article 14 are not

    applicable to such a Member State.

  • 3. 
    Costs of remedial actions required to follow the trajectory or make available cross-zonal

    capacity at the borders concerned by the action plan shall be borne by the Member

    State or Member States implementing the action plan.

  • 4. 
    Yearly during the implementation of the action plan and within six months after the

    expiry of the action plan, the relevant transmission system operators participating in the

    bidding zone review shall [ ] assess whether the available cross-border capacity has

    reached the linear trajectory or, as of the end of 2025, the minimum level outlined in Article 14 (7) for the period of the last 12 months [ ] and report to relevant national

    regulatory authorities and the Agency. [This assessment [ ] shall be continuously

    reiterated every 24 months for the period of the last 24 months.] 5. For those Member States for which the assessment following paragraph 4 demonstrates

    that a transmission system operator has not been compliant with the level outlined in

    Article 14(7) linear trajectory [ ] the relevant Member States shall come to a unanimous decision within 6 months from receiving the assessment referred in paragraph 4 on

    whether to maintain or amend the bidding zone configuration. Other Member States

    may submit comments to the relevant Member States who should take account of these

    comments when coming to their decision. The decision shall be justified and shall

    notified to the Commission and the Agency. Should the relevant Member States fail to come to a unanimous decision within the allowed timeframe, they shall immediately

    notify the Commission. [The Commission may make further proposals and may invite

    the relevant Member States for consultation aiming at fostering a balanced solution

    within three months.] As a measure of last resort, the Commission after consultation

    with the Agency and the relevant stakeholders shall adopt a decision whether to amend or maintain the bidding zone configuration in and between those Member States [ ], by

    six months after receiving of such a notification. [ ]

  • 6. 
    Six months before the expiry of the action plan, Member States shall decide whether to

    amend their bidding zone to address remaining congestions or whether to address remaining internal congestions with remedial actions for which they shall cover the

    costs.

  • 7. 
    Where a structural congestion has been identified pursuant to paragraph 4 but no

    action plan was defined within 6 months, the relevant transmission system operators shall within twelve months after a structural congestion has been identified assess [ ]

    whether the available cross-border capacity has reached the minimum level outlined in

    Article 14(7) for the period of the last 12 months and report to relevant national

    regulatory authorities and the Agency. For those Member States for which the assessment

    demonstrates that a transmission system operator has not been compliant with the minimum level, paragraph 5 applies.


3.

Behandeld document

24 apr
'18
Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the internal market for electricity (recast)
NOTE
General Secretariat of the Council
5834/18
 
 
 

4.

Meer informatie

 

5.

EU Monitor

Met de EU Monitor volgt u alle Europese dossiers die voor u van belang zijn en bent u op de hoogte van alles wat er speelt in die dossiers. Helaas kunnen wij geen nieuwe gebruikers aansluiten, deze dienst zal over enige tijd de werkzaamheden staken.

De EU Monitor is ook beschikbaar in het Engels.